roofy

1269 Broadway

Brooklyn, NY 11221BBL 3-03293-0065Map

Owner of record: Markland 20 LLC

1269 Broadway is a mixed residential and retail building built in 1931 in Brooklyn, 11221. It has 6 residential units across 4 floors. The owner of record is Markland 20 LLC. HPD has recorded 123 housing violations here, most recently on May 1, 2026. 11 of the 50 most recent violations are still open.

HPD violations
123
DOB violations
24
ECB violations
9
HPD complaints
48

Available now in this building

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 123

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective door and frame at vestibule door at public hall, 1st story

    Feb 4, 2026

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Jan 22, 2026 · Apt 2R

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from east at south

    Jan 22, 2026 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from east at south

    Jan 22, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south

    Jan 22, 2026 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood subfloor in the 1st private hallway from east located at apt 2r, 2nd story, 1st apartment from east at south

    Jan 22, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Jan 22, 2026 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective intercom system leading from building entrance to apartment at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south

    Jan 22, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door

    Jan 22, 2026

    Closed — Violation closed
Show 40 more ↓
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at east wall in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south original violation 18587812 issued 22-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jan 22, 2026 · Apt 2R

    Open — First no access to re- inspect violation
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 30, 2025 · Apt 3R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective closer arm at vestibule door

    Dec 30, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective closer arm at building entrance door

    Dec 30, 2025

    Closed — Violation closed
  • B

    Refit building entrance door

    Dec 30, 2025

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 30, 2025 · Apt 3R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story

    Jul 2, 2025

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 6, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2024

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east original violation 17104805 issued 03-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 3, 2024 · Apt 3R

    Open — Defect letter issued
  • C

    Properly repair or replace the broken or defective springbalance at lower sash at fire escape window in the 5th room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 3L

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of free-standing radiator in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east

    Jul 3, 2024 · Apt 3R

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation all stories at all balconies at building front at fire escape

    Jul 3, 2024

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east

    Jul 3, 2024 · Apt 3R

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling at public hall, 4th story

    Apr 10, 2024

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective counter balance at lower sash window at 1st window from north at east in the kitchen located at apt 4r, 4th story, 1st apartment from east at south

    Apr 10, 2024 · Apt 4R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchen located at apt 4r, 4th story, 1st apartment from east at south

    Apr 10, 2024 · Apt 4R

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the 5th room from east located at apt 4r, 4th story, 1st apartment from east at south

    Apr 10, 2024 · Apt 4R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 4th story

    Apr 10, 2024

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 4th story

    Apr 10, 2024

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and the ceiling at public hall, 1st story

    Apr 10, 2024

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at all walls and at ceiling at public hall, 1st story

    Apr 10, 2024

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective counter balance at lower sash window at 2nd window from north at east in the kitchen located at apt 4r, 4th story, 1st apartment from east at south

    Apr 10, 2024 · Apt 4R

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 21, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 23, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 23, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 7, 2021

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors ... in the entrance located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of extremely hot water exceeding the allowable temperature of 130 degrees fahrenheit and found to be at 134 degrees in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, north wall in the 4th room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Closed — Violation closed
  • B

    Replace with new the missing electrical light switch cover ,at north wall, in the 4th room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from east at south wall, 1st door frame from west at north wall, 1st door frame from east at south wall, north wall, east wall, 1st wall cabinet from north at east wall, 2nd wall cabinet from north at east wall in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st closet from north at east wall floor, south wall, east wall in the private hallway located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from east at south wall, north wall, east wall, west wall, 1st wall cabinet from south at west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the kitchen located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 16, 2021 · Apt 3L

    Closed — Violation closed

DOB building violations · 24

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 11, 2015

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 11, 2015

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 11, 2015

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 11, 2015

    Dob violation - active
Show 14 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations · 9

  • Class - 1

    Failure to maintain bldg in code compliant manner.noted:observed @ time of insp the fire escape @ fl to have loose railing & petached @ corner.also obseved the fire escape to be rusted & in poor condition.rem:m

    Dec 19, 2014 · Penalty $5,000

    Active
  • Class - 2

    Failure to maintain building in code compliant manner. on 12/12/14 during physical inspection i observed that the main house trap is ruptured and escaping sewer gas into the cellar.house trap must be capped and

    Dec 12, 2014 · Penalty $2,500

    Active
  • Class - 2

    Work w/o permit.work noted:renovation taking place @ 4th fl apt"4l"removal of the interior partition walls & installed @ front site new woodjoists w/ wooden stairs creating a mezzanine level.also observed new e

    Dec 12, 2014 · Penalty $4,000

    Active
  • Class - 1

    Work w/o a permit. on 12/12/14 at 11:00am during physical inspection iobserve the following work done w/o a permit.1-in apt 3r on the 3rd flnew gas line for range installed; 2-in the cellar new waste and vent

    Dec 12, 2014 · Penalty $12,000

    Active
  • Class - 2

    Unapproved unsafe unsutable electrical equipment devices materials appliances apparatus or wiring in use.defective electrical fixtures throughout hallway & bsmt flexible cord used from ktichen to bathroom to po

    Dec 12, 2014 · Penalty $4,000

    Active
  • Class - 2

    Fail to provide effective electrical continuity for metal raceways / enclosure / cable armour hallway fixture raceway and bathroom raceway not continuous apt 3l. remedy: provide effective electrical continuity

    Dec 12, 2014 · Penalty $6,000

    Active
  • Class - 1

    Failure to maintain bldg in code-compliant manner:no fire stopping perbc7123,27-345.noted:observed @ several(locatetion)@ cellar creating large area's of the fire stopping was removed exposing the wood joist &

    Dec 12, 2014 · Penalty $5,000

    Active
  • Class - 1

    Failure to maintain bldg in code-compliant manner.noted:@ cellar levelobserved the stairs from the sidewalk to cellar to be rusted & loose.metal beams under the sidewalk are deteriorating & rusted w/ loose conc

    Dec 12, 2014 · Penalty $5,000

    Active
  • Class - 2

    Electrical work w/o permit. observed at 9:30am (15) 2 x 4 layin fixtures installed in ceiling aong w/ outlets and switches (eye glasses store) no application on file for branch circuirt wiring in store & new bo

    Dec 12, 2014 · Penalty $4,000

    Active

Complaints

  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt 2R

    Close
  • Door/window

    Door

    Jan 21, 2026 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Jan 21, 2026 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Dec 29, 2025 · Apt 2R

    Close
  • Door/window

    Door

    Dec 29, 2025 · Apt 2R

    Close
  • Door/window

    Door

    Mar 19, 2024 · Apt 4R

    Close
  • Safety

    Fire escape

    Mar 19, 2024 · Apt 4R

    Close
  • Paint/plaster

    Wall

    Mar 19, 2024 · Apt 4R

    Close
  • Paint/plaster

    Ceiling

    Mar 19, 2024 · Apt 3L

    Close
  • Safety

    Window guard broken/missing

    Mar 19, 2024 · Apt 3L

    Close
Show 38 more ↓
  • Paint/plaster

    Ceiling

    Mar 19, 2024 · Apt 3L

    Close
  • Paint/plaster

    Ceiling

    Mar 19, 2024 · Apt 3L

    Close
  • Safety

    Window guard broken/missing

    Mar 19, 2024 · Apt 3L

    Close
  • Safety

    Fire escape

    Mar 19, 2024 · Apt 3L

    Close
  • Paint/plaster

    Ceiling

    Mar 19, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Mar 19, 2024 · Apt BLDG

    Close
  • Safety

    Fire escape

    Mar 19, 2024 · Apt BLDG

    Close
  • Plumbing

    Steam pipe/riser

    Mar 15, 2021 · Apt 3L

    Close
  • Electric

    Lighting

    Mar 15, 2021 · Apt 3L

    Close
  • Electric

    Outlet/switch

    Mar 15, 2021 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Mar 15, 2021 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Mar 15, 2021 · Apt 3L

    Close
  • Electric

    Power outage

    Mar 15, 2021 · Apt 3L

    Close
  • Unsanitary condition

    Sewage

    Jul 29, 2020 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    Jul 29, 2020 · Apt 3R

    Close
  • General

    Bell/buzzer/intercom

    Jun 19, 2020 · Apt 3R

    Close
  • Appliance

    Electric/gas range

    Jun 19, 2020 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Jun 19, 2020 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Jun 19, 2020 · Apt 3R

    Close
  • General

    Stairs

    Aug 3, 2012 · Apt 3R

    Close
  • General

    Mailbox

    Aug 3, 2012 · Apt 3R

    Close
  • Nonconst

    Rubbish

    Aug 3, 2012 · Apt 3R

    Close
  • General

    Doors

    Aug 3, 2012 · Apt 3R

    Close
  • General

    Locks

    Aug 3, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Nov 18, 2011 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Jan 10, 2011 · Apt 3R

    Close
  • Appliance

    Refrigerator

    Jan 10, 2011 · Apt 3R

    Close
  • Electric

    Electric-supply

    Jan 10, 2011 · Apt 3R

    Close
  • Electric

    Electric-supply

    Jan 10, 2011 · Apt 3R

    Close
  • Electric

    Electric-supply

    Jan 10, 2011 · Apt 3R

    Close
  • Electric

    Electric-supply

    Jan 10, 2011 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 8, 2011 · Apt 3R

    Close
  • Heating

    Heat related

    Dec 7, 2007 · Apt 4L

    Close
  • Heating

    Heat related

    Nov 27, 2007 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 21, 2006 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 20, 2006 · Apt BLDG

    Close
  • Heating

    Heat related

    Oct 30, 2006 · Apt BLDG

    Close
  • Heating

    Heat related

    Oct 26, 2006 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1931
Floors
4
Residential units
6
Building area
8,400 ft²
Lot area
3,573 ft²
Zoning
C4-3
Community board
304
Council district
37
Block / lot
3293 / 65
Assessed value
$955,800
Landmark / historic district
No

HPD registration #306164, last renewed Oct 15, 2025.

Questions about 1269 Broadway

Who owns 1269 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is Markland 20 LLC.

Does 1269 Broadway have violations?

Yes. NYC HPD has recorded 123 housing violations at this property.

Is 1269 Broadway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1269 Broadway built?

City records list 1931 as the year it was built.

How many apartments are in 1269 Broadway?

It has 6 residential units and 7 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.