roofy

38 Dodworth Street

Brooklyn, NY 11221BBL 3-03230-0013Map

Owner of record: Para Properties LLC

38 Dodworth Street is a two-family home built in 1901 in Brooklyn, 11221. It has 2 residential units across 2 floors. The owner of record is Para Properties LLC. HPD has recorded 13 housing violations here, most recently on February 28, 2014. 13 of the 13 most recent violations are still open.

HPD violations
13
DOB violations
3
ECB violations
16
HPD complaints
26

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Feb 28, 2014

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 13

  • C

    Remove the illegal fastening -- double cylinder key operated lock installed on metal door street entrance to building

    Feb 28, 2014

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceilings in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Sep 28, 2011 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at east located at apt 2, 2nd story

    Apr 6, 2011 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at west located at apt 2, 2nd story

    Apr 6, 2011 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood door frame in the entrance located at apt 2, 2nd story

    Apr 6, 2011 · Apt 2

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling in the 1st room from north at east located at apt 2, 2nd story

    Apr 6, 2011 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2, 2nd story

    Apr 6, 2011 · Apt 2

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 2, 2nd story

    Apr 6, 2011 · Apt 2

    Open — Nov sent out
  • A

    Properly repair the broken or defective bell buzzer in the entire apartment located at apt 2, 2nd story

    Apr 6, 2011 · Apt 2

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling in the 1st room from north at west located at apt 2, 2nd story

    Apr 6, 2011 · Apt 2

    Open — Nov sent out
Show 3 more ↓
  • C

    Repair the roof so that it will not leak over ceiling, in the entire apartment located at apt 2, 2nd story, apartment at east

    Apr 4, 2011 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, in the entire apartment located at apt 2, 2nd story, apartment at east

    Apr 4, 2011 · Apt 2

    Open — Nov sent out
  • C

    Remove the illegal fastening double cyclinder key operated lock, on iron gate, entrance to building. , 1st story

    May 1, 2002

    Open — Nov sent out

DOB building violations · 3

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 11, 2015

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 9, 2001

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Dec 17, 1997

    V%*-dob violation - dismissed

ECB violations · 16

  • Class - 1

    At the time of inspection, it was observed that the contractor was performing work in violation of a stop work order (swo) issued on 08/12/2026. exterior facade work at the building was observed to be completed

    Aug 25, 2026 · Penalty $10,000

    Active
  • Class - 1

    Atoi observed work in progress at exterior of property exp 2. 4 men working on suspended scaffold doing eifs / facade work. property has a swo issued for suspended scaffold under summon # - 39557125p. pswo issu

    Aug 6, 2026 · Penalty $10,000

    Active
  • Class - 1

    At time of inspection, observed suspended scaffold not maintained in a safe condition. bolts were unsecured, suspension cables and lifelines were not protected from abrasion, required parapet clamp documentatio

    Jul 27, 2026 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection, observed failure to establish and maintain a controlled access zone at exposure 4 in lieu of required overhead protection, contrary to bc 3309.1. persons were observed removing garbage an

    Jul 27, 2026 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection, observed failure to establish and maintain the required controlled access zone where perimeter protection had been removed, contrary to bc 3308.10. open, unprotected balconies remained ac

    Jul 27, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    At time of inspection, observed no construction superintendent on site, and the construction superintendent logbook contained no recorded sign-in time, no recorded sign-out time, and no construction superintend

    Jul 27, 2026 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection, observed a pump jack scaffold installed at exposure 2. upon review of department-approved construction documents and documents maintained on site, no details for the pump jack scaffold we

    Jul 27, 2026

    Resolve
  • Class - 2

    At time of inspection, observed a suspended scaffold installed without the required permit and site-specific design drawings, contrary to ac 28-105.1 and bc 3314.2. upon request, no permit or required design dr

    Jul 27, 2026 · Penalty $1,250

    Active
  • Class - 1

    At time of inspection, observed workers performing work at unprotected leading edges and platforms exceeding 6 feet above a lower level without the required guardrail system, contrary to bc 3315.1.5. the condit

    Jul 27, 2026 · Penalty $5,000

    Active
  • Class - 2

    At time of inspection, observed an adjustable suspended scaffold installed without the required department notification submitted prior to installation, contrary to bc 3314.4.1.5. submit the required notificati

    Jul 27, 2026 · Penalty $800

    Resolve
Show 6 more ↓
  • Class - 1

    At time of inspection, observed workers using an interior supported scaffold erected without required base plates, mudsills, fully planked platforms, or a guardrail system, contrary to bc 3314.5.3. stop all wor

    Jul 27, 2026 · Penalty $5,000

    Resolve
  • Class - 2

    Work does not conform to plans. at time of inspection, approved dob energy and architectual drawing calls out for window type w1 to have a penetrian of .25 upon inspection, window u-valve that contracter instal

    Jul 2, 2026 · Penalty $620

    Active
  • Class - 2

    Atoi, i observed construction fence not maintained to code. bc 3307.7 fence littered with graffiti and viewing panel at exp#1 is obstructed preventing me from viewing exp#1 of site

    Jun 1, 2026 · Penalty $1,000

    Resolve
  • Class - 1

    Residence altered for occupancy as a dwelling from 1 or 2 families to 4 families or greater: dob records indicate premises to be legally approved for 2 families,premises now illegally converted to 4 families w/

    Dec 10, 2014 · Penalty $57,000

    Resolve
  • Class - 1

    Work w/o a permit: at time of inspection,observed erection of full ht partition walls at cellar level,to create a "class a"apt with two bed rooms,3pc bathroom, full kitchen with water and waste lines for reside

    Dec 10, 2014 · Penalty $8,000

    Resolve
  • Non-hazardous

    Work without a permit: work noted: erected an 8 ft high plywoodd fence at front of premises approx 24ft long. remedy: obtain a permit or remove illegal fence.

    Apr 12, 2002 · Penalty $250

    Resolve

Complaints

  • Heating

    Heat related

    Feb 26, 2014 · Apt NA

    Close
  • Plumbing

    Water-leaks

    Sep 23, 2011 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Sep 23, 2011 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Sep 23, 2011 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Sep 23, 2011 · Apt 2

    Close
  • Construction

    Roof

    Apr 2, 2011 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Apr 2, 2011 · Apt 2

    Close
  • Paint/plaster

    Wall

    Apr 2, 2011 · Apt 2

    Close
  • General

    Ventilation system

    Apr 2, 2011 · Apt 2

    Close
  • General

    Doors

    Apr 2, 2011 · Apt 2

    Close
Show 16 more ↓
  • Plumbing

    Water-leaks

    Apr 2, 2011 · Apt 2

    Close
  • General

    Mailbox

    Apr 2, 2011 · Apt 2

    Close
  • General

    Ceramic-tile

    Apr 2, 2011 · Apt 2

    Close
  • Plumbing

    Toilet

    Apr 2, 2011 · Apt 2

    Close
  • Heating

    Heat related

    Apr 2, 2011 · Apt 2

    Close
  • Electric

    Bell-buzzer/intercom

    Apr 2, 2011 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Feb 18, 2011 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Feb 18, 2011 · Apt 2

    Close
  • Paint/plaster

    Wall

    Feb 18, 2011 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Feb 18, 2011 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Feb 18, 2011 · Apt 2

    Close
  • Paint/plaster

    Wall

    Feb 18, 2011 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Feb 18, 2011 · Apt 2

    Close
  • Paint/plaster

    Wall

    Feb 18, 2011 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Feb 18, 2011 · Apt 2

    Close
  • Heating

    Heat related

    Feb 18, 2011 · Apt 2

    Close

Sales history

DatePriceTypeUnits
Feb 11, 2026$1,220,000Two family dwellings2

Building details

Building type
Two-family home (B2)
Year built
1901
Floors
2
Residential units
2
Building area
2,816 ft²
Lot area
2,288 ft²
Zoning
R6
Community board
304
Council district
34
Block / lot
3230 / 13
Assessed value
$77,220
Landmark / historic district
No

Questions about 38 Dodworth Street

Who owns 38 Dodworth Street?

The owner of record in NYC Department of City Planning PLUTO data is Para Properties LLC.

Does 38 Dodworth Street have violations?

Yes. NYC HPD has recorded 13 housing violations at this property.

Is 38 Dodworth Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 38 Dodworth Street built?

City records list 1901 as the year it was built.

How many apartments are in 38 Dodworth Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.