25 Lawton Street
Brooklyn, NY 11221BBL 3-03225-0028Map
Owner of record: Icl Real Property Holding Corporation
25 Lawton Street is a care facility built in 1994 in Brooklyn, 11221. The owner of record is Icl Real Property Holding Corporation. HPD has recorded 16 housing violations here, most recently on June 12, 2026. 13 of the 16 most recent violations are still open.
- HPD violations
- 16
- DOB violations
- 26
- ECB violations
- 7
- HPD complaints
- 55
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 2nd apartment from east at south , section at west
Jun 12, 2026 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 6th apartment from north at east
Dec 29, 2025 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2b, 2nd story, 8th apartment from north at east
Dec 26, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2b, 2nd story, 8th apartment from north at east
Dec 26, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 8th apartment from north at east
Dec 26, 2025 · Apt 2B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2b, 2nd story, 8th apartment from south at west
Dec 24, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of excessive storage of material collyer in the entire apartment located at apt 2b, 2nd story, 8th apartment from south at west
Dec 24, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 8th apartment from south at west
Dec 24, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at observed a live rat at building front
Dec 21, 2025
Open — Nov sent out - BHazardous
Properly secure the loose electrical light fixture at ceiling in the bathroom located at apt 2b, 2nd story, 10th apartment from north at east
Jul 17, 2025 · Apt 2B
Open — Nov sent out
Show 6 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east located at apt 2b, 2nd story, 10th apartment from north at east
Jul 17, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of expose electrical wire at ceiling in the bathroom located at apt 2b, 2nd story, 10th apartment from north at east
Jul 17, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 10th apartment from north at east
Jul 17, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Replace with new the missing water sprinkler cover at west wall in the 1st room from east located at apt 2b, 2nd story, 10th apartment from north at east
Jul 17, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 8th apartment from east at south
Mar 1, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 8th apartment from north at east
Feb 20, 2025 · Apt 2B
Closed — Violation closed
DOB building violations · 26
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 14, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 13, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2015
Dob violation - resolved
Show 16 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 2, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2004
Dob violation - resolved
ECB violations · 7
- Class - 1
Failure to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service and contact the dob elevator division at [email protected]
Nov 6, 2025 · Penalty $1,250
Active - Class - 1
Only elevator in a shelter out of service. this condition affects numerous clients, including those with special needs, thereby creating a condition dangerous to human life.
Aug 19, 2025 · Penalty $1,250
Resolve - Class - 1
Class 2: provide elevator maintenance log book for year 2021., class 1: out of service. upon inspection, the device is found to be out-of-service remedy: restore to service immediately and, notify nycdob the de
Mar 8, 2021 · Penalty $3,125
Resolve - Class - 1
The only elevator in building(or section of building) out of service. upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy:restore to service immed
Jan 11, 2021 · Penalty $3,125
Resolve - Class - 1
The only elevator in the building or section of building out- of- service. upon inspection, the device is found to be out- of- service creating a hazardous condition as per 1rcny 11-02. remedy: restore to servi
Oct 28, 2020 · Penalty $1,250
Resolve - Class - 2
02x10,99m07,81y13,70o02,70d06,31d06. 02x10-repair emergency phone; 99m7-missing test tag; 81y13-leaking piston seal replace it; 70o02- clean pit; 70d06-repair access to the pit door work; 31d06-top of the
Oct 25, 2018 · Penalty $327
Resolve - Non-hazardous
19b,34a,50. 50)safety valve is not in upright position
Jun 4, 2003 · Penalty $180
Resolve
Complaints
- Heat/hot water
Entire building
Jun 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 11, 2026 · Apt BLDG
Close
Show 40 more ↓
- Plumbing
Water supply
Jun 11, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jun 10, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jun 9, 2026 · Apt BLDG
Close - Plumbing
Toilet
Mar 26, 2026 · Apt 3C
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Dec 28, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 25, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 21, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 14, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 12, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 8, 2025 · Apt FIRST
Close - Electric
Lighting
Jul 9, 2025 · Apt 2B
Close - Plumbing
Toilet
Jul 9, 2025 · Apt 2B
Close - Electric
Wiring
Jul 9, 2025 · Apt 2B
Close - Door/window
Door
Jul 9, 2025 · Apt 2B
Close - Door/window
Door
Jul 9, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Jul 9, 2025 · Apt 2B
Close - Electric
Lighting
Jul 2, 2025 · Apt 2B
Close - Plumbing
Toilet
Jul 2, 2025 · Apt 2B
Close - Door/window
Door
Jul 2, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Jul 2, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Jul 2, 2025 · Apt 2B
Close - Plumbing
Water supply
May 14, 2025 · Apt 2B
Close - Door/window
Door
Feb 28, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 28, 2025 · Apt 2B
Close - Unsanitary condition
Garbage/recycling storage
Feb 28, 2025 · Apt OUTSID
Close - Heat/hot water
Apartment only
Feb 20, 2025 · Apt 2B
Close - Safety
Sprinkler
Feb 20, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 20, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Feb 4, 2025 · Apt 2B
Close - Unsanitary condition
Garbage/recycling storage
Feb 4, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Jan 19, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 2B
Close - Plumbing
Radiator
Feb 28, 2024 · Apt 4C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Care facility (N9)
- Year built
- 1994
- Floors
- 3
- Residential units
- —
- Building area
- 20,625 ft²
- Lot area
- 11,600 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 34
- Block / lot
- 3225 / 28
- Assessed value
- $1,431,450
- Landmark / historic district
- No
Questions about 25 Lawton Street
Who owns 25 Lawton Street?
The owner of record in NYC Department of City Planning PLUTO data is Icl Real Property Holding Corporation.
Does 25 Lawton Street have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 25 Lawton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 25 Lawton Street built?
City records list 1994 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.