949 Willoughby Avenue
Brooklyn, NY 11221BBL 3-03183-0055Map
Owner of record: 949 Willoughby Lyceum LLC
949 Willoughby Avenue is a walk-up apartment building built in 1901 in Brooklyn, 11221. It has 45 residential units across 3 floors. The owner of record is 949 Willoughby Lyceum LLC. HPD has recorded 97 housing violations here, most recently on September 9, 2026. 29 of the 50 most recent violations are still open.
- HPD violations
- 97
- DOB violations
- 73
- ECB violations
- 19
- HPD complaints
- 100
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 97
- BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building front entrance door , 1st story
Sep 9, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of unacceptable electromagnetic locking device installed at building front entrance door , 1st story
Sep 9, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules improprly installed- required standadr 4 to 12 inches from ceiling at wall or 4 inches from wall at ceiling in the entire apartment located at apt 206, 2nd story, 3rd apartment from north at east
Aug 10, 2026 · Apt 206
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations improprly installed- required standadr 4 to 12 inches from ceiling at wall or 4 inches from wall at ceiling in the entire apartment located at apt 206, 2nd story, 3rd apartment from north at east
Aug 10, 2026 · Apt 206
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules improprly installed- required standadr 4 to 12 inches from ceiling at wall or 4 inches from wall at ceiling in the entire apartment located at apt 305, 3rd story, 1st apartment from north at east
Aug 10, 2026 · Apt 305
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations improprly installed- required standadr 4 to 12 inches from ceiling at wall or 4 inches from wall at ceiling in the entire apartment located at apt 305, 3rd story, 1st apartment from north at east
Aug 10, 2026 · Apt 305
Open — Civ14 mailed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door , 1st story
Jun 4, 2026
Open — Nov sent out - CImmediately hazardous
Provide security in the case of power outage by installing an acceptable heavy-duty lock and latch set at building entrance door , 1st story
Jun 4, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 206, 2nd story, 5th apartment from north at east
May 10, 2026 · Apt 206
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 206, 2nd story, 5th apartment from north at east
May 10, 2026 · Apt 206
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 206, 2nd story, 5th apartment from north at east
May 9, 2026 · Apt 206
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 1st room from east located at apt 206, 2nd story, 5th apartment from north at east original violation 18879356 issued 09-may-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 9, 2026 · Apt 206
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 206, 2nd story, 5th apartment from north at east
May 9, 2026 · Apt 206
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 206, 2nd story, 5th apartment from north at east
May 9, 2026 · Apt 206
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 1st room from east located at apt 206, 2nd story, 5th apartment from north at east
May 9, 2026 · Apt 206
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door at east at public hall, 1st story
May 9, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 206, 2nd story, 5th apartment from north at east
Mar 18, 2026 · Apt 206
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 206, 2nd story, 5th apartment from north at east
Mar 18, 2026 · Apt 206
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 206, 2nd story, 5th apartment from north at east
Mar 18, 2026 · Apt 206
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 305, 3rd story
Oct 21, 2025 · Apt 305
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 305, 3rd story
Oct 21, 2025 · Apt 305
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around north 1 window in the 1st room from north located at apt 305, 3rd story
Oct 21, 2025 · Apt 305
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq feet at ceiling in the 1st room from north located at apt 305, 3rd story
Oct 21, 2025 · Apt 305
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq feet at ceiling in the 1st room from north located at apt 305, 3rd story original violation 18322451 issued 21-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Oct 21, 2025 · Apt 305
Open — Defect letter issued - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door at public hall, 1st story
Aug 5, 2025
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device install at the building entrance door at public hall, 1st story
Aug 5, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on door in the entrance located at apt 210, 2nd story, 1st apartment from north at east
Jul 15, 2025 · Apt 210
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 3rd bathroom from east at south located at apt 210, 2nd story, 1st apartment from north at east original violation 18092751 issued 15-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jul 15, 2025 · Apt 210
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd bathroom from east at south located at apt 210, 2nd story, 1st apartment from north at east
Jul 15, 2025 · Apt 210
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 3rd bathroom from east at south located at apt 210, 2nd story, 1st apartment from north at east
Jul 15, 2025 · Apt 210
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 210, 2nd story, 1st apartment from north at east
Jul 15, 2025 · Apt 210
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 210, 2nd story, 1st apartment from north at east
Jul 15, 2025 · Apt 210
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door at south at public hall, 2nd story
Jul 15, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from north located at apt 305, 3rd story, 1st apartment from north at east
Jun 25, 2025 · Apt 305
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 305, 3rd story, 1st apartment from north at east
Jun 25, 2025 · Apt 305
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 112, 1st story, 9th apartment from south at west
May 12, 2025 · Apt 112
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 112, 1st story, 9th apartment from south at west
May 12, 2025 · Apt 112
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 112, 1st story, 9th apartment from south at west
May 12, 2025 · Apt 112
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door (north 2 door) at 2nd party wall balcony from north, 1st story
May 12, 2025
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of unacceptable electromagnetic locking device installed at front building entrance door to building at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - BHazardous
Provide in the event of a power outage by means of an acceptable mechanical heavy duty latch set at building front entrance door at public hall, 1st story
Oct 25, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to south at north section at public hall stairs, 1st story
Oct 25, 2024
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in exposed electrical wires at south, north section at public hall stairs, 1st story
Oct 25, 2024
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 2nd room from east located at apt 111, 1st story, 1st apartment from north at east
Aug 6, 2024 · Apt 111
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from east located at apt 111, 1st story, 1st apartment from north at east
Aug 6, 2024 · Apt 111
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 111, 1st story, 9th apartment from west at north
Jun 26, 2024 · Apt 111
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and east wall in the 2nd room from north located at apt 111, 1st story, 9th apartment from west at north
Jun 26, 2024 · Apt 111
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at apt 111, 1st story, 9th apartment from west at north
Jun 26, 2024 · Apt 111
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective east wall light fixtures in the 1st room from north located at apt 111, 1st story, 9th apartment from west at north
Jun 26, 2024 · Apt 111
Open — Nov sent out
DOB building violations · 73
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 4, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 11, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2016
Dob violation - active - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 28, 2015
Vw*-violation - work w/o permit dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 8, 2012
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Construction other optional
Remedy; stop all work provide approved plans
Nov 9, 2011
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Dec 18, 2010
V%*-dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active
ECB violations · 19
- Class - 1
Top portion of brick pier at exposure#1 is disintegrated and leaning towards adjacent property (961 willoughby ave.). portion of plywood fencing at exposure#4 appears unsupported and leaning towards adjacent pr
Dec 26, 2019 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction documents and or approved amendments.insp.dwg jul.20 2012 premises under alt.1 320412120.note at time of insp.found(1)plot plan 2.001.00 indicates a 30' rear yard
May 29, 2015 · Penalty $500
Active - Class - 2
Altered/changed bldg occupied w/o a valid certificate of occupancy expired t.c.o. noted: bldg altered under 320412120alt i. occupied building w/expired temp certificate of occupancy.sequence 003 expired 12/21/
Apr 14, 2015
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35014731z issued on 5/6/13 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Jul 16, 2013 · Penalty $4,000
Resolve - Class - 1
Altered/changed bldg occupied w/o a valid c/o. noted: bldg under alt #320412120 has tenant occupying apt #308. dob records indicate no c/o has been issued. remedy: obtain valid c/o or discontinue illegal
May 6, 2013 · Penalty $5,000
Resolve - Class - 2
Work w/o a permit: expired permit. noted: on active job site work on all levels. permit #320412120 has expired on 5.4.13. remedy: renew permit.
May 6, 2013
Resolve - Class - 1
Work w/o permit. noted an active job site under alt #320412120 tenantsoccupy bldg. plans do not show tenant protection plan on documents. tenant noted in apt #308 also doors marked occupied at apt #209,212,214
May 6, 2013 · Penalty $400
Resolve - Class - 2
97p16 - failure to maintain elevator. respondent failed to provide proper access in order that this department could perform a periodic inspection as per 28-304.6 and appendix k of the building code.respondent
Apr 10, 2013 · Penalty $500
Resolve - Class - 2
97p16failure to maintain elevator respondent failed to provide proper access in order that this dept can perform a periodic inspectionas per 28-304.6 and appendix k of the building code. respondent failed
Apr 10, 2013 · Penalty $500
Active - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34930233n issued on 11/9/11 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Jan 25, 2012
Resolve
Show 9 more ↓
- Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: workers are working thru-out premises without proper egress. all doors & gates are chained & padlocked while work is in pr
Nov 9, 2011 · Penalty $1,000
Active - Non-hazardous
41-l-10, 41a-g-10, 39-z-10, 39a-l-10, 83-x-10, 41b-l-10 41-repair all relays not dropping-no paper allowed in front of coils 39a-machine room must be kept at a temperature that does not overheat the equipment
Jul 5, 2006 · Penalty $350
Resolve - Non-hazardous
01l10/56l10/55y10 #01-l-10- fix alarm to ring. #56-l-10- machine is making a grinding sound repair it.
Jan 20, 2006 · Penalty $350
Resolve - Non-hazardous
41n07 #41-n-07- remove yellow jumer.
Jan 20, 2006 · Penalty $350
Active - Non-hazardous
75u-perform 5 year test and file elevator 3 form.
Jul 5, 1997 · Penalty $100
Resolve - Non-hazardous
75u22d36m 75-perform 5yr. test and file elevator 3 form with this office. 22-secure emg exit cover form top, provide new machine room door.
May 19, 1997
Resolve - Non-hazardous
06q,10m,15m,22d,16h,47h,50y,50y,57o,34i,62i, 15-10m-floor #'s 62i-sheet metal.
Feb 11, 1993
Resolve - Non-hazardous
02x,14m,09h,16h,18m,24l,25l,37l,50y,50y, 18m-dust covers.
Feb 11, 1993
Resolve - Non-hazardous
Work in progress. remove asbestos properly. post warning sign at entrance of boiler room.
Mar 10, 1989
Resolve
Complaints
- Unsanitary condition
Mold
Oct 21, 2026 · Apt 305
Open - Door/window
Door
Aug 26, 2026 · Apt 115
Close - Door/window
Door
Aug 26, 2026 · Apt LOBBY
Open - Water leak
Heavy flow
May 6, 2026 · Apt 206
Close - Water leak
Heavy flow
Apr 25, 2026 · Apt 206
Close - Paint/plaster
Ceiling
Apr 25, 2026 · Apt 206
Close - Water leak
Heavy flow
Mar 18, 2026 · Apt 206
Close - Paint/plaster
Ceiling
Mar 18, 2026 · Apt 206
Close - Paint/plaster
Ceiling
Mar 18, 2026 · Apt 206
Close - Unsanitary condition
Mold
Mar 18, 2026 · Apt 206
Close
Show 40 more ↓
- Water leak
Slow leak
Mar 18, 2026 · Apt 206
Close - Water leak
Heavy flow
Mar 18, 2026 · Apt 206
Close - Paint/plaster
Ceiling
Mar 18, 2026 · Apt 206
Close - Unsanitary condition
Mold
Mar 18, 2026 · Apt 206
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 105
Close - Appliance
Electric/gas range
Jan 21, 2026 · Apt 113
Close - General
Signage missing
Aug 8, 2025 · Apt 112
Close - General
Janitor/super
Aug 8, 2025 · Apt 112
Close - Unsanitary condition
Sewage
Jul 14, 2025 · Apt 102
Close - Unsanitary condition
Sewage
Jul 14, 2025 · Apt 102
Close - Water leak
Damp spot
Jul 7, 2025 · Apt 210
Close - Unsanitary condition
Pests
Jul 7, 2025 · Apt 210
Close - Unsanitary condition
Mold
Jul 7, 2025 · Apt 210
Close - Unsanitary condition
Mold
Jun 19, 2025 · Apt 305
Close - Water leak
Damp spot
Apr 7, 2025 · Apt 112
Close - Door/window
Door
Apr 7, 2025 · Apt 112
Close - Heat/hot water
Apartment only
Feb 23, 2025 · Apt 108
Close - Heat/hot water
Apartment only
Jan 30, 2025 · Apt 120
Close - Unsanitary condition
Pests
Jan 25, 2025 · Apt 111
Close - Electric
No lighting
Jan 25, 2025 · Apt 111
Close - Flooring/stairs
Floor
Jan 25, 2025 · Apt 111
Close - Unsanitary condition
Sewage
Oct 17, 2024 · Apt 105
Close - Unsanitary condition
Pests
Aug 8, 2024 · Apt 112
Close - Water leak
Heavy flow
Jul 31, 2024 · Apt 111
Close - Water leak
Heavy flow
Jul 4, 2024 · Apt 111
Close - Water leak
Heavy flow
Jun 19, 2024 · Apt 111
Close - Flooring/stairs
Floor
Jun 19, 2024 · Apt 111
Close - Unsanitary condition
Mold
Jun 19, 2024 · Apt 111
Close - Unsanitary condition
Pests
Jun 19, 2024 · Apt 111
Close - Electric
No lighting
Jun 19, 2024 · Apt 111
Close - Water leak
Heavy flow
Jun 7, 2024 · Apt 111
Close - Unsanitary condition
Pests
Jun 7, 2024 · Apt 111
Close - Electric
No lighting
Jun 7, 2024 · Apt 111
Close - Flooring/stairs
Floor
Jun 7, 2024 · Apt 111
Close - Water leak
Heavy flow
Jun 1, 2024 · Apt 111
Close - Water leak
Slow leak
Mar 12, 2024 · Apt 305
Close - Paint/plaster
Ceiling
Mar 12, 2024 · Apt 305
Close - Flooring/stairs
Floor
Mar 7, 2024 · Apt 113
Close - Unsanitary condition
Pests
Mar 7, 2024 · Apt 113
Close - Water leak
Heavy flow
Feb 17, 2024 · Apt 113
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1901
- Floors
- 3
- Residential units
- 45
- Building area
- 43,900 ft²
- Lot area
- 18,494 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 34
- Block / lot
- 3183 / 55
- Assessed value
- $2,966,400
- Landmark / historic district
- No
HPD registration #384465, last renewed Dec 3, 2025.
Questions about 949 Willoughby Avenue
Who owns 949 Willoughby Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 949 Willoughby Lyceum LLC.
Does 949 Willoughby Avenue have violations?
Yes. NYC HPD has recorded 97 housing violations at this property.
Is 949 Willoughby Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 949 Willoughby Avenue built?
City records list 1901 as the year it was built.
How many apartments are in 949 Willoughby Avenue?
It has 45 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.