roofy

590 Bushwick Avenue

Brooklyn, NY 11206BBL 3-03150-0031Map

Owner of record: Bushwick Manor LLC

590 Bushwick Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11206. It has 10 residential units across 4 floors. The owner of record is Bushwick Manor LLC. HPD has recorded 207 housing violations here, most recently on May 4, 2026.

HPD violations
207
DOB violations
1
ECB violations
24
HPD complaints
110

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 207

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2023

    Closed — Violation dismissed
  • C

    Code: arrange and make self-closing the doors (leading to cellar) at public hall, 1st story

    Jun 15, 2021

    Closed — Violation dismissed
  • C

    Code: arrange and make self-closing the doors at boiler room at cellar

    Jun 15, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 16, 2018

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department around window at west wall in the 1st room from north at west located at apt 2l, 2nd story, 1st apartment from west at north

    Jul 22, 2018 · Apt 2L

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak around window at west wall in the 1st room from north at west located at apt 2l, 2nd story, 1st apartment from west at north

    Jul 22, 2018 · Apt 2L

    Closed — Violation closed
Show 40 more ↓
  • B

    M/d law abate the nuisance consisting of ac unit from the fire escape window in 1st room from east at south. located at apt 2l, 2nd story

    Jun 19, 2018 · Apt 2L

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors .. in the entrance located at apt 2l, 2nd story

    Jun 19, 2018 · Apt 2L

    Closed — Violation closed
  • B

    Properly secure the loose aluminum capping on south exterior wall , 3rd story

    May 23, 2018

    Closed — Violation closed
  • A

    Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.

    May 23, 2018

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall, 2nd story

    Apr 2, 2018

    Closed — Violation closed
  • B

    Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 3rd story

    Apr 2, 2018

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system - boiler room inaccessible, door to cellar at 1st story public hall locked

    Apr 2, 2018

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at the ceiling at public hall, 1st story

    Apr 2, 2018

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system (no apt number, non-working phone number) at public hall, 1st story

    Apr 2, 2018

    Closed — Violation dismissed
  • C

    Replace with new the missing glass pane at the window on the south wall at public hall, 1st story

    Apr 2, 2018

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of construction and household materials obstructing the drop ladder at the south yard

    Apr 2, 2018

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes - wires, flower pots, and household items on the 2nd and 3rd story balconies and stairs of the stack on the south exterior wall

    Apr 2, 2018

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors in the entrance located at apt 3r, 3rd story, apartment at east

    Apr 2, 2018 · Apt 3R

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective counterbalances of the lower sash of the 2nd window from east on the south wall in the 5th room from north located at apt 3r, 3rd story, apartment at east

    Apr 2, 2018 · Apt 3R

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, apartment at east

    Apr 2, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors entrance door to building at public hall, 1st story

    Feb 25, 2018

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at cellar

    Feb 25, 2018

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of 141 degrees of hot water temperature-exceeding the maxiumum temperature of 130 degrees located at apt 2l, 2nd story, apartment at north

    Feb 25, 2018 · Apt 2L

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Feb 25, 2018 · Apt 2L

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of free standing radiator at public hall, 2nd story

    Aug 28, 2017

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing on wall at public hall, 1st story

    Aug 28, 2017

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 28, 2017

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jun 12, 2017

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jun 12, 2017

    Closed — Violation closed
  • B

    § 185, 240 m/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling ... at cellar

    May 19, 2016

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective missing fire stopping material at ceiling at boiler room

    May 19, 2016

    Closed — Violation closed
  • C

    Replace with new the broken or defective wood tread 6th and 7th from bottom stairs leading to cellar from 1st sty public hall

    Nov 22, 2015

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of uncapped steam pipe at public hall, 1st story

    Nov 22, 2015

    Closed — Violation closed
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at .. at public hall, 1st story

    Nov 17, 2015

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Nov 17, 2015

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 3rd story

    Apr 8, 2015

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Mar 14, 2015

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 3; located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 14, 2015 · Apt 3L

    Closed — Violation dismissed
  • B

    Remove the illegal fastening consisting of double cylinder key operated lock at front gate.

    Mar 14, 2015

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 6, 2015 · Apt 3L

    Closed — Violation closed
  • A

    Properly repair the broken or defective lower sash counter spring balance south 1 window in the 2nd room from east located at apt 3l, 3rd story, 1st apartment from south at west

    Mar 6, 2015 · Apt 3L

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Mar 5, 2015

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Feb 28, 2015

    Closed — Violation closed
  • B

    Properly repair the broken or defective mortise lock at building entrance door , 1st story

    Feb 28, 2015

    Closed — Violation closed
  • B

    Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof ,,, at public hall, 3rd story

    Feb 28, 2015

    Closed — Violation closed

DOB building violations · 1

  • Construction other optional

    C-construction other optional

    Oct 4, 1989

    Dob violation - dismissed

ECB violations · 24

  • Class - 1

    At the time of inspection of a proposed five-story building, sidewalk shed at exps. 1 and 2 and overhead protection at exp. 4 did not conform to approved drawings. shed was ~3 ft from facade, not tied, posts le

    Nov 21, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    Observation: 9 workers on site framing & welding without fall protection. on 2nd floor aproximately 20 ft of guardrails missing @ exposure#4. pswo for inad guardrail missing @ expo#2 w/o fall protection. stop

    Nov 19, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    Observation: yodocks not filled with water/sand nor interlocked by manufacturer specs at exposure#2. vio for failure to comply with manufactures specification.comply with manufacture specs

    Nov 19, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Observation: @ exposure#2 fence with graffiti and advertisement throughout fence. vio for fence inadequately maintain.construct/maintain construction

    Nov 19, 2025 · Penalty $1,000

    Resolve
  • Class - 2

    Observation: inadequate housekeeping on sws with debri(woodpieces,metal,fire extinguisher,cans,bottles). vio for inadequate housekeeping. provide adequate housekeeping

    Nov 19, 2025

    Resolve
  • Class - 2

    3314.4.8 maintenance. at time of inspection observed: supported scaffold contrary to code installed at exposure# 1-2. loose planks, untie netting debris, creating unsafe condition for public and property. stop

    Oct 1, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Backflow prevention. a time of inspection i observed fire hydrant being use house connected going into construction site without a backflow preventer contrary to bc 15 rcny 20-04. failure to provide and maintai

    Oct 1, 2025

    Resolve
  • Class - 2

    At time of inspection observed: at exposure# 1 inadequate storage zone ay expo# 2, plastic barriers system contrary to manufacturer specifications bc 3301.1.3 missing interlocking couplers, not water filled, cr

    Oct 1, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Observed active site w/out any numbering signs posted. no active numbering signs was not provided or installed throughout floors 1,2, & 3 must provide signage per 28-301.1 so emergency officials, active constru

    Aug 28, 2025

    Resolve
  • Class - 1

    Observed active site failed to provide upon request approve construction documents: no design drawings for shoring @ cellar level, no support of excavation drawings @ rear yard, no structural drawings provided

    Aug 28, 2025 · Penalty $2,500

    Resolve
Show 14 more ↓
  • Class - 1

    Observed active site failed to institute safety measures for floors 1,2,& 3. open holes in floors, unprotected & unsured while ongoing construction operations in progress 3301.2 . stop all construction operatio

    Aug 28, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    Observed active with on going construction operations construction superintendent failed to provide adequate logs: no design drawings for shoring @ cellar level, no soe drawings, no structural drawings for floo

    Aug 28, 2025 · Penalty $5,030

    Resolve
  • Class - 2

    Work w/o a permit.noted:@ 2nd & 3rd fl.installed mechanical ventilation systems in bathrooms & kitchens for apt 2r,2l,3r & 3l.rem:stop all work,make site safe,contact dob for insp.obtain permit.

    Sep 9, 2015

    Resolve
  • Class - 1

    Misc violation. observed on 9/9/14 @3:20 in basement location gas met ers-improper pipe supports and pipe hanging-hazardous condition.photostaken. rmdy: comply w/nov.

    Sep 9, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Overscope of work- work does not conform to apprved construction docu ments or apprv amendments observed on 9/9/15 at 3pm on flrs 2nd and 3rd 1st comm space - apts 2l-3r&l new waste,vents water, gas piping inst

    Sep 9, 2015 · Penalty $1,000

    Resolve
  • Class - 2

    Work w/o a permit.noted;@ 3rd fl level apt 3l has been completely renovated w/ new partions walls,plumbing & electrical fixtures.no permit on file.rem:obtain permit.

    Sep 9, 2015

    Resolve
  • Non-hazardous

    Failure to maintain building walls. noted defects crack in brick wall approx 1/4 wide approx 5' from grade at the south wall center shingles are missing throughout entire building open holes in walls around win

    Jul 19, 2002 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintian : hazardous defect are : rotten floor joists at cellar n/w corner.(2) wood joist supported by wood timber at cellar west: (3) fire stop missing at ceiling at various location. (4) hard rail

    Mar 22, 2002 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to maintian : defect are : hozizontal crack in brick wall approx 1/4" wide, at approx 5ft form grade at south exterior brick wall center.(2) shingles at exterior wall throughout 15 loose, part missing,

    Mar 22, 2002 · Penalty $800

    Resolve
  • Non-hazardous

    Work without a permit inthat partitions has been erected in commercial store creating an office and storage area erecting suspended ceiling at same commercilal area entire contrary to rs5-16 1st floor only rem

    Feb 25, 1993

    Resolve
  • Non-hazardous

    Work without a permit. remedy: obtain a permit.

    Oct 4, 1989

    Resolve
  • Non-hazardous

    Work without a permit. remedy: obtain necessary permits or restore premises to prior legal condition.

    Oct 4, 1989

    Resolve
  • Non-hazardous

    Failrue to provide provide ventilation for bathroom first floor right side. remedy: provide proper ventilation.

    Oct 4, 1989

    Resolve
  • Non-hazardous

    Illegal use in a residential district. operation of dispatch car service in an r-6 zone.

    Oct 4, 1989

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Dec 1, 2019 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Nov 25, 2019 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2019 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2019 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2019 · Apt 2L

    Close
  • Door/window

    Door

    Nov 17, 2019 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 17, 2019 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2019 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Nov 13, 2019 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2019 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Nov 7, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 7, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 6, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2019 · Apt 3L

    Close
  • Water leak

    Slow leak

    Jul 17, 2018 · Apt 2L

    Close
  • Electric

    Outlet/switch

    Jun 8, 2018 · Apt 2L

    Close
  • Water leak

    Slow leak

    May 29, 2018 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Apr 4, 2018 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Apr 3, 2018 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Apr 1, 2018 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Mar 27, 2018 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2018 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2018 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2018 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 3, 2018 · Apt 2L

    Close
  • Water leak

    Slow leak

    Jan 2, 2018 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Dec 13, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 8, 2017 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Aug 24, 2017 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Aug 18, 2017 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Jun 11, 2017 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2017 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Mar 18, 2017 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Mar 17, 2017 · Apt 3R

    Close
  • Water leak

    Heavy flow

    Mar 11, 2017 · Apt 2L

    Close
  • Water leak

    Slow leak

    Feb 5, 2017 · Apt 2L

    Close
  • Appliance

    Electric/gas range

    Jan 17, 2017 · Apt 2L

    Close
  • Plumbing

    Water supply

    Jun 21, 2016 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Mar 25, 2015 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    Mar 25, 2015 · Apt 2L

    Close
  • Plumbing

    Bathtub/shower

    Mar 25, 2015 · Apt 2L

    Close
  • Water leak

    Slow leak

    Mar 25, 2015 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Mar 25, 2015 · Apt 2L

    Close
  • Door/window

    Window frame

    Mar 25, 2015 · Apt 2L

    Close
  • Safety

    Window guard broken/missing

    Mar 10, 2015 · Apt 3L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1931
Floors
4
Residential units
10
Building area
11,190 ft²
Lot area
2,625 ft²
Zoning
R6
Community board
304
Council district
34
Block / lot
3150 / 31
Assessed value
$340,200
Landmark / historic district
No

HPD registration #360433, last renewed Jul 22, 2026.

Questions about 590 Bushwick Avenue

Who owns 590 Bushwick Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Bushwick Manor LLC.

Does 590 Bushwick Avenue have violations?

Yes. NYC HPD has recorded 207 housing violations at this property.

Is 590 Bushwick Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 590 Bushwick Avenue built?

City records list 1931 as the year it was built.

How many apartments are in 590 Bushwick Avenue?

It has 10 residential units and 11 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.