191 Meserole Street
Brooklyn, NY 11206BBL 3-03045-0031Map
Owner of record: 191 Meserole LLC
191 Meserole Street is a walk-up apartment building built in 1930 in Brooklyn, 11206. It has 5 residential units across 3 floors. The owner of record is 191 Meserole LLC. HPD has recorded 44 housing violations here, most recently on July 1, 2025. 4 of the 44 most recent violations are still open.
- HPD violations
- 44
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 88
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front
Jul 1, 2025
Open — Nov sent out - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front
Jun 5, 2025
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at building front yard
Jun 5, 2025
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Sep 25, 2023 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Sep 25, 2023 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from east at south
Sep 25, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from east at south
Sep 25, 2023 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall at upper level in the 4th room from north located at apt 3l, 3rd story, 1st apartment from south at west
Sep 16, 2023 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 4th room from north located at apt 3l, 3rd story, 1st apartment from south at west
Sep 16, 2023 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective , in the entrance located at apt 3l, 3rd story, 1st apartment from south at west
Sep 16, 2023 · Apt 3L
Closed — Violation closed
Show 34 more ↓
- BHazardous
Remove all encumbrances consisting of bicycle at public hall, 3rd story
Sep 16, 2023
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 2nd room from north located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from north located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling (approx. 2 sq. ft.) in the 2nd room from north located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lockable door knob installed on entrance door to room with the fire escape window in the 2nd room from north located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lockable door knob installed on entrance door to room with the fire escape window in the 1st room from north located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north at west located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective ... in the entrance located at apt 2f, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2F
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 10, 2022
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 4th room from north located at apt 3r, 3rd story, apartment at east
Jul 13, 2021 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 3r, 3rd story, apartment at east
Jul 13, 2021 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective in the entrance located at apt 3r, 3rd story, apartment at east
Jul 13, 2021 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Jul 13, 2021
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Jul 13, 2021
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Jul 13, 2021
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Jun 16, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 3rd story
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 3rd story
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 16, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 28, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling, north and west walls at public hall, 3rd story
May 28, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ..the ceiling, north and west walls at public hall, 3rd story
May 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 15, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 15, 2018
Closed — Violation closed - CImmediately hazardous
Properly secure the loose wood tread 2nd from bottom up, at public hall stairs, 1st story
Jan 18, 2018
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of household item tired on scuttle ladder at public hall stairs, 1st story
Jan 18, 2018
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of bicycle chained at scuttle ladder and obstructing egress to roof, at public hall, 3rd story
Jan 18, 2018
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts required
Dec 26, 2003
Closed — Violation dismissed - BHazardous
D26-10.01 adm code properly repair the broken or defective lock vestibule door 1 sty pub hall.
Mar 2, 1983
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Class - 1
Failure to safeguard all persons & property affected by construction/demolition operations.note:work in progress under appl.310204828 exp.06/12/09 w/1st fl front & rear windows open and no construction activity
Oct 22, 2008 · Penalty $2,400
Resolve - Class - 1
Work does not conform to approved const doc and/or approved amendmentsentire interior partitions of 3 story wood frame structure removed/demo. bldg exists w/only exterior walls & interior staircase at 1st fl. w
Sep 29, 2008
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Feb 15, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 8, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 22, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 15, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 15, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 10, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 10, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 7, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 5, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 5, 2026 · Apt BLDG
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Dec 15, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt 1R
Close - Unsanitary condition
Mold
Nov 12, 2025 · Apt 1R
Close - Flooring/stairs
Floor
Nov 12, 2025 · Apt 1R
Close - Plumbing
Toilet
Nov 12, 2025 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Nov 8, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 8, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 20, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 16, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 5, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 13, 2024 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Oct 7, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 30, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 24, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 14, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 12, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 28, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 1, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 22, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 22, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 14, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 1, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 27, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 9, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 27, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 6, 2023 · Apt BLDG
Close - Door/window
Window pane
Sep 6, 2023 · Apt 3L
Close - Unsanitary condition
Mold
Sep 6, 2023 · Apt 3L
Close - Door/window
Window frame
Sep 6, 2023 · Apt 3L
Close - Door/window
Window frame
Sep 6, 2023 · Apt 3L
Close - Water leak
Slow leak
Sep 5, 2023 · Apt 2F
Close - Paint/plaster
Ceiling
Sep 5, 2023 · Apt 2F
Close - Paint/plaster
Wall
Sep 5, 2023 · Apt 2F
Close - Door/window
Window frame
Sep 2, 2023 · Apt 2F
Close - Unsanitary condition
Mold
Sep 2, 2023 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Aug 19, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2023 · Apt BLDG
Close - Door/window
Door
Feb 26, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1930
- Floors
- 3
- Residential units
- 5
- Building area
- 3,600 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 3045 / 31
- Assessed value
- $772,200
- Landmark / historic district
- No
HPD registration #319512, last renewed Jun 30, 2026.
Questions about 191 Meserole Street
Who owns 191 Meserole Street?
The owner of record in NYC Department of City Planning PLUTO data is 191 Meserole LLC.
Does 191 Meserole Street have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is 191 Meserole Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 191 Meserole Street built?
City records list 1930 as the year it was built.
How many apartments are in 191 Meserole Street?
It has 5 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.