roofy

11 Stagg Street

Brooklyn, NY 11206BBL 3-03022-0049Map

Owner of record: Townhouse Rental, L.l.c.

11 Stagg Street is a walk-up apartment building built in 1930 in Brooklyn, 11206. It has 4 residential units across 3 floors. The owner of record is Townhouse Rental, L.l.c.. HPD has recorded 45 housing violations here, most recently on September 9, 2026. 8 of the 45 most recent violations are still open.

HPD violations
45
DOB violations
3
ECB violations
9
HPD complaints
57

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Sep 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 45

  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rubbish at building front yard

    Sep 9, 2026

    Open — Nov certified on time
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 9, 2026

    Open — Nov certified on time
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Sep 9, 2026

    Open — Nov certified on time
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Sep 9, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 9, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 9, 2026

    Open — Nov certified on time
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Sep 9, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 9, 2026

    Open — Nov certified on time
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 13, 2021

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 16, 2019

    Closed — Violation dismissed
Show 35 more ↓
  • C

    Remove the illegal fastening consisting of a double cylinder key operated lock at the entry door to the building at public hall, 1st story

    Jan 8, 2018

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Dec 11, 2017

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Dec 11, 2017

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cylinder lock entrance door to building

    Dec 11, 2017

    Closed — Violation dismissed
  • B

    Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing at public hall, 1st story

    Dec 11, 2017

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 11, 2017

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Dec 11, 2017

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Dec 11, 2017

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 11, 2017

    Closed — Violation dismissed
  • B

    Replace or repair the self-closing doors that is missing or defective at entrance to building

    Dec 11, 2017

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of base cabinet blocking egress to fire escape window. in the kitchen located at apt 3r, 3rd story, 2nd apartment from west at north

    Dec 13, 2016 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair the broken or defective counter balance at lower sash window . in the kitchen located at apt 3r, 3rd story, 2nd apartment from west at north

    Dec 13, 2016 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling. in the kitchen located at apt 3r, 3rd story, 2nd apartment from west at north

    Dec 13, 2016 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling. in the bathroom located at apt 3r, 3rd story, 2nd apartment from west at north

    Dec 13, 2016 · Apt 3R

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective. located at apt 3r, 3rd story, 2nd apartment from west at north

    Dec 13, 2016 · Apt 3R

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum of 130 degrees found hot water to be 148 degrees . in the entire apartment located at apt 3r, 3rd story, 2nd apartment from west at north

    Dec 13, 2016 · Apt 3R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective. located at apt 3r, 3rd story, 2nd apartment from west at north

    Dec 13, 2016 · Apt 3R

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 3r, 3rd story, 2nd apartment from west at north

    Dec 13, 2016 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood cornice at east corner roof front of building.

    Dec 13, 2016

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 14, 2015

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story

    Jan 7, 2006

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story

    Jan 7, 2006

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door at public hall, 1st story

    Jan 7, 2006

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story

    Jan 7, 2006

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jan 7, 2006

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jan 7, 2006

    Closed — Violation closed
  • C

    Abate the nuisance consisting of rodents rats in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Jan 7, 2006 · Apt 3R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Jan 7, 2006 · Apt 3R

    Closed — Violation closed
  • A

    Refit windows throughout upper and lower sashes in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Jan 7, 2006 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings throughout in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Jan 7, 2006 · Apt 3R

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Jan 7, 2006 · Apt 3R

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Jan 7, 2006 · Apt 3R

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Dec 20, 2004

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. at entire apartment, apartment

    Dec 20, 2004

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of rodents rats at rear yard

    Jul 7, 2004

    Closed — Violation closed

DOB building violations · 3

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 9

  • Class - 2

    Failure to maintain building in code-compliant manner; noted: observed debris consisting of garbage bags, toilet, cabinet, sheetrock, countertop & cardboard box is stored at the front yard area of the building.

    May 18, 2022

    Resolve
  • Class - 1

    Dwelling converted maintained or occupied with 3 or more additional dewlling units than legally authorized by c of o #300172603. illegal occupancy noted:(@apt#1 first floor apt converted to 5 sro units additon

    Aug 5, 2019 · Penalty $60,000

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner. lack of a system of automatic sprinkler where is required as per bc 903.2 &27-954 forsro units that apt#1a @first floor.rem: discontinue illegal occupancy

    Aug 5, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Dwelling converted, miantained or occupied with 3 or more additonal dwelling units than leaglly authroized by c of o #300172603. ilegal occupancy noted: first floor converted to 5 sro units additional violation

    Aug 5, 2019 · Penalty $60,000

    Resolve
  • Class - 1

    Dwelling converted, maintained or occupied with 3 or more additional dwelling units than legally authorized by c of o #300172603. illegal ocucpancy noted:(apt#1a first floor apt converted to 5 sro units.

    Aug 5, 2019 · Penalty $60,000

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner lack of requirednumber of means of egress for every floor per bc 1018.1(2008 code; 27-366; bc 10214 (2014 code/ for sro units in apt#1a first floor.

    Aug 5, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Dwelling converted, maintained or occupied with 3 or more additonal dwelling units than legally authorized by c of o #300172603. illegal occupancy noted:(apt# @fist floor apat converted to 5 srp units.additiona

    Aug 5, 2019 · Penalty $60,000

    Resolve
  • Class - 1

    907.2.8 failure to provide fire alarm system for sro units in apt#1a first floor. rem: discontinue illegal occupancy.

    Aug 5, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Dwelling converted maintain or occupied with 3 more additonal dwellingunits than leggally authorized by c of o #300172603 illegal occupancuynoted: apt#1a @first floor converted to 5 sro units. additional viola

    Aug 5, 2019 · Penalty $60,000

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Sep 6, 2026 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Sep 6, 2026 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Sep 6, 2026 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Sep 5, 2026 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 18, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 12, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 31, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 28, 2018 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 25, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 14, 2018 · Apt 2A

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Feb 11, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2018 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 11, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2016 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2016 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Mar 15, 2016 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Feb 4, 2015 · Apt 1B

    Close
  • Door/window

    Window pane

    Feb 4, 2015 · Apt 1B

    Close
  • Plumbing

    Toilet

    Feb 4, 2015 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Feb 4, 2015 · Apt 1B

    Close
  • General

    Bell/buzzer/intercom

    Feb 4, 2015 · Apt 1B

    Close
  • Electric

    Outlet/switch

    Feb 4, 2015 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Feb 4, 2015 · Apt 1B

    Close
  • Plumbing

    Toilet

    Feb 4, 2015 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Feb 4, 2015 · Apt 1B

    Close
  • Electric

    Wiring

    Feb 4, 2015 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2015 · Apt 3L

    Close
  • General

    Bell/buzzer/intercom

    Jul 29, 2014 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Jul 29, 2014 · Apt 3L

    Close
  • Flooring/stairs

    Floor

    Jul 29, 2014 · Apt 3L

    Close
  • Water leak

    Slow leak

    Jul 29, 2014 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Jul 29, 2014 · Apt 3L

    Close
  • Heating

    Heat related

    Apr 24, 2012 · Apt 1A

    Close
  • Heating

    Heat related

    Dec 20, 2008 · Apt 2R

    Close
  • Heating

    Heat related

    Mar 17, 2008 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 8, 2008 · Apt 1B

    Close
  • Heating

    Heat related

    Jan 4, 2006 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 4, 2006 · Apt 3R

    Close
  • Electric

    Wiring

    Aug 12, 2005 · Apt 3L

    Close
  • Nonconst

    Carbon monoxide

    Aug 12, 2005 · Apt 3L

    Close
  • Plumbing

    Water supply

    Aug 12, 2005 · Apt 3L

    Close
  • General

    Windows

    Aug 12, 2005 · Apt 3L

    Close
  • Electric

    Lighting

    Aug 12, 2005 · Apt 3L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1930
Floors
3
Residential units
4
Building area
3,750 ft²
Lot area
2,500 ft²
Zoning
R6B
Community board
301
Council district
34
Block / lot
3022 / 49
Assessed value
$737,550
Landmark / historic district
No

HPD registration #319751, last renewed Feb 6, 2026.

Questions about 11 Stagg Street

Who owns 11 Stagg Street?

The owner of record in NYC Department of City Planning PLUTO data is Townhouse Rental, L.l.c..

Does 11 Stagg Street have violations?

Yes. NYC HPD has recorded 45 housing violations at this property.

Is 11 Stagg Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 11 Stagg Street built?

City records list 1930 as the year it was built.

How many apartments are in 11 Stagg Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.