290 Powers Street
Brooklyn, NY 11211BBL 3-02922-7502Map
Owner of record: The 290 Powers Street Condominium
290 Powers Street is a condominium built in 2017 in Brooklyn, 11211. It has 4 residential units across 4 floors. The owner of record is The 290 Powers Street Condominium. HPD has recorded 1 housing violation here, most recently on April 20, 2021.
- HPD violations
- 1
- DOB violations
- 1
- ECB violations
- 26
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 1
- Construction other optional
Failure to maintain building in code manner. ref to dob records, job file # 320056498 nb application approved on 08/05/2015 for 4 floors which two floors higher than att building #288. observed old chimney of # 288 not extended to proper height of building #290 (exhaust discharge must be not closer than 10' from building opening) as per
Mar 3, 2020
Dob violation - dismissed
ECB violations · 26
- Class - 1
New building or open lot occupied without a valid certificate of occupancy.observed 1st floor apartment occupied as class a apt. permit #32 0056498-01-nb has temporary certificate of occupancy expired on 09-24
Oct 15, 2018 · Penalty $625
Resolve - Class - 1
3301.2 overhead protection.noted:active construction site pipe sccaffold at exposure 1-exterior work not complete-no overhead protection in place between sidewalk shed and building to protect workers and/or vis
Dec 8, 2016 · Penalty $1,600
Resolve - Class - 1
Housekeeping.noted:active construction site workers onsite.big pile ofcombustible garage @exp #1 and #3 ground level.mommy inspection no oneis doing housekeeping @time of inspection some workers just walking in
Dec 8, 2016 · Penalty $2,400
Resolve - Class - 1
Sec. 3301.7;3301.2 failure to provide design for interior & exterior wooden platforms: on the date noted above i performed on inspection of the new bldg under construction. at the time of inspection i observed
Apr 28, 2016 · Penalty $1,600
Resolve - Class - 1
Sec. 3301.2 inadequate guardrails. at the time of my inspection i observed missing guardrails at the elevator shaft & along the edge of the stairwell where a makeshift platform was installed additionally the
Apr 28, 2016 · Penalty $1,200
Resolve - Class - 1
Failure to maintain adequate housekeeping: tripping hazards. at the time of my inspection while walking down & up the stairs i tripped w/debris & materail left on the stairs that are used to access the working
Apr 28, 2016 · Penalty $2,400
Resolve - Class - 1
Sec. 3307.6;3307.3 failure to provide pedestrian protection: shed on the date noted above,1 performed on inspection of the new bldg under construction. at the time of my inspection & review of documents i obser
Apr 28, 2016 · Penalty $1,600
Resolve - Class - 1
Sec. 3301.2 failure to safeguard all persons affected by construction:no overhead protection ingress/egress from & to bldg on the date noted above i performed an inspection of the new bldg under construction,at
Apr 28, 2016 · Penalty $400
Resolve - Class - 1
Sec. 3301.2 failure to institute/maintain safety equipment & measures or temporary construction for workers. on the date noted above i performed an inspection of the new bldg under construction. at the time of
Apr 28, 2016 · Penalty $1,600
Resolve - Class - 1
Sec. 3314 failure to erect,maintain,modify,safeguard & (2)e supported scaffold per section requirements. on the date noted above i performedan inspection of the new bldg under construction. at the time of inspe
Apr 28, 2016 · Penalty $1,600
Resolve
Show 16 more ↓
- Class - 1
Sec. 3309.1 inadequate roof protection of adjoining property on the date noted above i performed an inspection of the new bldg under construction. at the time of my inspection i observed that the adjacent bldg
Apr 28, 2016 · Penalty $1,600
Resolve - Class - 1
Work does not conform to approved construction documents.the contractor failed to install the (solmou) piles and lagging for the support of excavation (soe) at exposure #4.section of this foundation wall was co
Sep 25, 2015 · Penalty $250
Resolve - Class - 1
3303.4.1 maintenace : tripping hazards. note : demolition job site bldg down to grade. fence erected @ expsoure #1 sidewalk in front of job site has been damaged. section of sidewalk approx. 6 feet long by 4 fe
Aug 21, 2014 · Penalty $8,000
Resolve - Class - 2
Work w/o a permit. expired permit : fence note : demolition job site bldg down to grade level. fence erected @ exposure # 1 a long power st.approx 30 feet in lenght & 8 feet high. dob records shown fence # 3200
Aug 21, 2014 · Penalty $4,000
Resolve - Class - 2
Fence does not meet code const. specifications. note : demolition job site, bldg down to grade level. fence erected along power st. approx. 30 ft in lenght and 8 feet high. fence not painted " hunter green" in
Aug 21, 2014 · Penalty $4,000
Resolve - Class - 2
Sec. 3307.6.4.6 sidewalk shed does not meet bldg code specifications. noted: at time of inspection sidewalk shed emeded on exp #1 parapet on left side of sidewalk shed in danger of falling 5ft extension is
Aug 13, 2014 · Penalty $10,000
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. noted: during demolition under permit #32076593535-01-dm. wood beam approx 6"w x 18"h was removed, causing damage at adjoining
Nov 14, 2013 · Penalty $6,000
Resolve - Class - 1
Work does not conform to approved construction documents and or appro ved amendments. note:at the time of my inspection on demolition site work in progress taking down building plans call for sidewalk shed at
Sep 23, 2013 · Penalty $5,000
Resolve - Class - 2
3303.2.4 sanitary facilities shall be provided during construction,re=modeling or demolition activities in accordance w/the new york city plumbing codes.note: at the time of my inspection on demolition site wor
Sep 23, 2013 · Penalty $4,000
Resolve - Class - 3
Failure to maintain. job #320759363 exp 3-1-14 shed erected: note all lighting at underside of shed missing (no lights evident) remedy: immidately restore lighting to shed as required.
Jun 24, 2013 · Penalty $500
Resolve - Class - 2
Failure to post "no smoking" sign at job site.upon inspection demolition work in progress. at time of inspection noted "no smoking" signs not provided at this active demolition site as required by nyc fire code
May 20, 2013 · Penalty $400
Resolve - Class - 1
Failure to provide sidewalk shed - upon inspection demolition work of the bldg in progress approx 7-8 workers are working.as noted,sidewalk shed required in front of the building as per code but not provided.
May 20, 2013 · Penalty $4,800
Resolve - Class - 1
Failure to provide job site fence upon inspection demolition of the bldg in progress,approx 7-8 workers working. at time of inspection,noted at this active demolition site no job site fence provided.rmdy:stop
May 20, 2013 · Penalty $1,600
Resolve - Class - 1
Bc3306.8.8 failure to remove hazardous materials before commencement of actual demolition upon inspection demolition of the bldg commenced,about 7-8 workers working,debris at site. at time of inspection noted,
May 20, 2013 · Penalty $1,600
Resolve - Class - 1
Bc3303.7.2 no fire extinguishers upon inspection demolition work of the building in progress.at time of inspection noted no fire extinguishers provided at this active demolition site as required by code.rmdy:co
May 20, 2013 · Penalty $1,600
Resolve - Class - 1
Work wo a permit - upon inspection noted demolition of the building inprogress using power tools as portable generator,electric saw etc w/o obtaining mechanical demoliton permit.rmdy: stop all demolition,obtain
May 20, 2013 · Penalty $1,600
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R1)
- Year built
- 2017
- Floors
- 4
- Residential units
- 4
- Building area
- 4,752 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 34
- Block / lot
- 2922 / 7502
- Assessed value
- $1,075,501
- Landmark / historic district
- No
HPD registration #388975, last renewed Mar 26, 2026.
Questions about 290 Powers Street
Who owns 290 Powers Street?
The owner of record in NYC Department of City Planning PLUTO data is The 290 Powers Street Condominium.
Does 290 Powers Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 290 Powers Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 290 Powers Street built?
City records list 2017 as the year it was built.
How many apartments are in 290 Powers Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.