roofy

324 Devoe Street

Brooklyn, NY 11211BBL 3-02921-0016Map

Owner of record: Msgr Vetro Associates LP

324 Devoe Street is an elevator apartment building built in 1992 in Brooklyn, 11211. It has 45 residential units across 5 floors. The owner of record is Msgr Vetro Associates LP. HPD has recorded 59 housing violations here, most recently on August 7, 2026. 2 of the 50 most recent violations are still open.

HPD violations
59
DOB violations
25
ECB violations
2
HPD complaints
153

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Aug 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 59

  • C

    Properly secure the loose handrail at east wall in the shower/bathtub in the bathroom located at apt 5a, 5th story, 5th apartment from west at north

    Aug 7, 2026 · Apt 5A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at fire door leading to stair case ''a'' at public hall, 5th story

    Aug 7, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch set and assemblies at fire door leading to stair case ''a'' at public hall, 5th story

    Aug 7, 2026

    Open — Invalid certification
  • B

    Properly secure the loose loose hvac/a/c system at the north wall in the 2nd room from east located at apt 5a, 5th story, 5th apartment from west at north

    Aug 7, 2026 · Apt 5A

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 5th story

    Aug 7, 2026

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at east located at apt 5a, 5th story, 5th apartment from west at north

    May 28, 2026 · Apt 5A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at west located at apt 5a, 5th story, 5th apartment from west at north

    May 28, 2026 · Apt 5A

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5d, 5th story, 2nd apartment from west at north

    Feb 1, 2026 · Apt 5D

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at basement at boiler room

    Feb 1, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 2nd apartment from west at north

    Feb 1, 2026 · Apt 5D

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5d, 5th story, 2nd apartment from west at north

    Feb 1, 2026 · Apt 5D

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4b, 4th story, 4th apartment from west at north

    Dec 8, 2025 · Apt 4B

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door is locked at basement leading to boiler room at boiler room

    Dec 8, 2025

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5i, 5th story, 2nd apartment from east at south

    Mar 5, 2025 · Apt 5I

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4c, 4th story, 3rd apartment from west at north

    Jan 8, 2025 · Apt 4C

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 4c, 4th story, 3rd apartment from west at north

    Jan 8, 2025 · Apt 4C

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 5i, 5th story, 2nd apartment from east at south

    Dec 16, 2024 · Apt 5I

    Closed — Violation closed
  • B

    Replace the broken or defective water closet in the bathroom located at apt 3c, 3rd story, 3rd apartment from west at north

    Dec 12, 2024 · Apt 3C

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 2nd apartment from west at north

    Dec 11, 2024 · Apt 3D

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2024

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all ceilings and all walls in the entire apartment located at apt 5i, 5th story, 2nd apartment from east at south

    Nov 5, 2024 · Apt 5I

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 5i, 5th story, 2nd apartment from east at south

    Nov 5, 2024 · Apt 5I

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5i, 5th story, 2nd apartment from east at south

    Nov 5, 2024 · Apt 5I

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 2nd apartment from west at north

    Jan 21, 2024 · Apt 5D

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 2g, 2nd story, 2nd apartment from east at south

    May 5, 2023 · Apt 2G

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 4b, 4th story, 4th apartment from west at north

    Dec 16, 2022 · Apt 4B

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4b, 4th story, 4th apartment from west at north

    Dec 16, 2022 · Apt 4B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 2g, 2nd story, 4th apartment from east at south

    Sep 1, 2022 · Apt 2G

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 3 sq ft at ceiling, 3 sq ft at north wall and 2 sq ft at east wall inside closet at north wall in the 2nd room from north located at apt 2g, 2nd story, 4th apartment from east at south

    Sep 1, 2022 · Apt 2G

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approximately 3 sq ft at ceiling, 3 sq ft at north wall and 2 sq ft at east wall inside closet at north wall in the 2nd room from north located at apt 2g, 2nd story, 4th apartment from east at south original violation 15343948 issued 01-sep-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 1, 2022 · Apt 2G

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2021

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from west at north

    Oct 16, 2020 · Apt 2E

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 20, 2019

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 20, 2019

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic suspended drop ceiling at community room , 1st story

    Sep 18, 2019

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic suspended drop ceiling at laundry room, 1st story

    Sep 18, 2019

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic suspended drop ceiling at public hall, 1st story

    Sep 18, 2019

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 18, 2019

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 18, 2019

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 18, 2019

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective stopper at bath tub in the bathroom located at apt 2e, 2nd story, 1st apartment from west at north

    Sep 18, 2019 · Apt 2E

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective stopper at wash basin in the bathroom located at apt 2e, 2nd story, 1st apartment from west at north

    Sep 18, 2019 · Apt 2E

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 11, 2019

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 11, 2019

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 11, 2019

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in bathtub waste line in the bathroom located at apt 2e, 2nd story

    Sep 11, 2019 · Apt 2E

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in wash basin waste line in the bathroom located at apt 2e, 2nd story

    Sep 11, 2019 · Apt 2E

    Closed — Violation dismissed
  • B

    Replace or repair the self-closing doors that is missing or defective at front entrance located at apt 2e, 2nd story, 1st apartment from west at north

    May 7, 2019 · Apt 2E

    Closed — Violation closed
  • B

    Properly repair the broken or defective stopper assembly in washbasin in the bathroom located at apt 2e, 2nd story, 1st apartment from west at north

    Mar 12, 2019 · Apt 2E

    Closed — Violation closed

DOB building violations · 25

  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 26, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 14, 2020

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 11, 2015

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
Show 15 more ↓
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 13, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 17, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 13, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 2, 2004

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - active

ECB violations · 2

  • Class - 2

    99bb05,100m07,68m07.(99bb05)expired 1yr test tag.(100m07)provide fire extinguisher in motor room.

    Dec 23, 2010

    Resolve
  • Class - 2

    67x10/ 10m07/ 67-x-10 - in car emergence phone inoperative 10-m-07 missing car door gibb ( must be 2 per power)

    Apr 9, 2010

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Apr 22, 2026 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Apr 22, 2026 · Apt 5A

    Close
  • Paint/plaster

    Wall

    Apr 22, 2026 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Feb 6, 2026 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Feb 6, 2026 · Apt 5I

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 8, 2025 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2025 · Apt 4B

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Mar 5, 2025 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Mar 4, 2025 · Apt 5I

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2025 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Feb 22, 2025 · Apt BUILDI

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2025 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Jan 6, 2025 · Apt 5I

    Close
  • Heat/hot water

    Entire building

    Dec 24, 2024 · Apt 5I

    Close
  • Heat/hot water

    Apartment only

    Dec 23, 2024 · Apt 4C

    Close
  • Heat/hot water

    Entire building

    Dec 13, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 1, 2024 · Apt 3J

    Close
  • Plumbing

    Toilet

    Nov 5, 2024 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2024 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Aug 15, 2024 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2024 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Dec 28, 2023 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Oct 10, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 22, 2023 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Feb 7, 2023 · Apt 5D

    Close
  • Plumbing

    Bathtub/shower

    Feb 7, 2023 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Dec 14, 2022 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2022 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Aug 30, 2022 · Apt 2G

    Close
  • Plumbing

    Bathtub/shower

    Aug 30, 2022 · Apt 2G

    Close
  • Water leak

    Slow leak

    Aug 24, 2022 · Apt 2G

    Close
  • Unsanitary condition

    Mold

    Aug 24, 2022 · Apt 2G

    Close
  • Unsanitary condition

    Pests

    Jan 5, 2022 · Apt 3G

    Close
  • Unsanitary condition

    Pests

    Jan 5, 2022 · Apt 3G

    Close
  • Water leak

    Damp spot

    Jan 4, 2022 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Oct 22, 2019 · Apt 2E

    Close
  • Appliance

    Electric/gas range

    Sep 13, 2019 · Apt 2E

    Close
  • Paint/plaster

    Ceiling

    Sep 13, 2019 · Apt 3

    Close
  • General

    Bell/buzzer/intercom

    Sep 13, 2019 · Apt 3

    Close
  • Door/window

    Door

    Sep 13, 2019 · Apt 3

    Close
  • Outside building

    Roofing

    Sep 13, 2019 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Sep 13, 2019 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Sep 13, 2019 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Sep 13, 2019 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1992
Floors
5
Residential units
45
Building area
29,142 ft²
Lot area
12,440 ft²
Zoning
R6B
Community board
301
Council district
34
Block / lot
2921 / 16
Assessed value
$2,129,850
Landmark / historic district
No

HPD registration #376763, last renewed Sep 9, 2025.

Questions about 324 Devoe Street

Who owns 324 Devoe Street?

The owner of record in NYC Department of City Planning PLUTO data is Msgr Vetro Associates LP.

Does 324 Devoe Street have violations?

Yes. NYC HPD has recorded 59 housing violations at this property.

Is 324 Devoe Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 324 Devoe Street built?

City records list 1992 as the year it was built.

How many apartments are in 324 Devoe Street?

It has 45 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.