270 Manhattan Avenue
Brooklyn, NY 11211BBL 3-02776-0006Map
Owner of record: Canton 270, LLC
270 Manhattan Avenue is a walk-up apartment building built in 2017 in Brooklyn, 11211. It has 11 residential units across 4 floors. The owner of record is Canton 270, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 5
- ECB violations
- 22
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 5
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 3, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 6, 2018
Vp*-violation unserved ecb- dismissed
ECB violations · 22
- Class - 1
Class 2: provide missing in-car mirror., perform brake maintenance and provide brake tag with date entered in full mm/dd/year., service and tag fire extiguisher (expired 10/22)., properly secure top of car elec
Sep 28, 2023 · Penalty $3,125
Resolve - Class - 2
Expired permit. note at time of inspection,i observed construction fence in place w/o valid permit. remedy: comply w/code-renew permit.
Jun 20, 2021 · Penalty $3,125
Resolve - Class - 2
Temporary construction equipment in place with expired permit - construction fence.at time of inspection of 4 story nb job site was closed observed temporary construction equipment construction fence in place a
May 24, 2021 · Penalty $625
Resolve - Class - 1
Lighting outlets installed at entry points outside of new building without requisite electrical permit., obtain permit
Dec 3, 2020
Resolve - Class - 1
Electrical panel, cables, lights, receptacles installed on construction site at new building. no required permit on file for temporary electrical light and power on file. installation appears very unworkmanlike
Dec 3, 2020 · Penalty $800
Resolve - Class - 1
No design drawings for elevator shaft platform. at time of inspection observed platform erected at 1st fl over elevator shaft. when i requested design drawings for platform none were provided or on site. elevat
Jun 9, 2020 · Penalty $1,250
Resolve - Class - 1
Guardrails. at time of inspection observed balconies at exp#3 w/no guardrails & doors to balconies were unlocked & no controlled access zonewas established at exp#1 observed balconies which did not have midrail
Jun 9, 2020 · Penalty $2,500
Resolve - Class - 1
Housekeeping. observed construction debris at balconies at exp#1&3 which creates a condition of where debris can be kick off or blown off topublic or workers below. no sidewalk shed at front or rear of bldg.
Jun 9, 2020 · Penalty $6,250
Resolve - Class - 1
Sec. 3301.5 unsafe conditions-egress/ingress/equipment observed 2 men on bulkhead that wasnt secured & did not extend 3 feet past bulkhead which is required per osha 1926. the 2 men on bulkhead which is require
Jun 9, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to provide adequate housekeeping.at time of inspection i observed at an active jobsite inadequate housekeeping.there is const debris and materials throughout floors that make for an unsafe work environm
Aug 1, 2019
Resolve
Show 12 more ↓
- Class - 2
Failure to provide approved/accepted construction documents at jobsiteat time of inspection.at time of inspection i observed ongoing const.activity at a proposed 4 story nb,to review protection i asked to see
Aug 1, 2019
Resolve - Class - 1
Failure to maintain safety measures(ohp)at time of inspection i observed const activity at a proposed 4 story nb,at exp#2 rear of building the adj property has no ohp.the building has been built to 3rd floor an
Aug 1, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain safety measures(roof protection)at time of inspection i observed const.activity at a proposed 4 story nb.at expo#4 rear of building the adj property needs adequate roof protecting installed
Aug 1, 2019 · Penalty $625
Resolve - Class - 2
Bc 28-116.2.3 failure to provide an adequate inspection program tr3 for l.w.c mix design. as noted,at time of inspection,active site,2nd fl working deck-failure to provide tr3 mix design for l.w.c. remedy:stop
May 1, 2019
Resolve - Class - 2
Failure to safeguard all person or property affected by construction operations. as noted at time of my inspection active site,2nd fl working deck i observed no o.h.p at the entrance(approximately 4.5-5ft) gap
May 1, 2019
Resolve - Class - 1
Failed to safeguard. at the time of inspection at an active four stor ies construction site, i observed the site had padlocked one (1) gate but there was one (1) other gate to that was opened. this is hazardous
Nov 8, 2018 · Penalty $5,000
Resolve - Class - 1
Inadequate guardrails system(missing)at time of inspection on a activejobsite,currently at foundation level,observed that guardrail system was missing at exp#1 & 4 leading into a drop approx 10 feet down. also
Sep 6, 2018 · Penalty $2,500
Resolve - Class - 1
Daily construction inspection log book. at time of inspection on a active jobsite,currently at foundation,observed workers cropping concrete at exp#4. upon request to see daily inspection log book construction
Sep 6, 2018 · Penalty $10,000
Resolve - Class - 1
Construction superintendent failed to perform his duties. at time of inspection on a active jobsite,currently at foundation level,construction superintendent not present on site,super absent from jobsite for mo
Sep 6, 2018 · Penalty $10,000
Resolve - Class - 1
Bc-3304.7 failure to maintain means of egress. at time of inspection on an active jobsite, currently at foundation level, observed that means of egress were inadequate throughout jobsite, wood steps broken, gan
Sep 6, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3301.13.12 no designated competent person on site. at time of inspection on a active jobsite currently at foundation level,observed workers chopping concrete at exp#4,upon request to see/speak to competent
Sep 6, 2018 · Penalty $10,000
Resolve - Class - 1
Work does not conform to approved design drawings/plans for construction. at time of inspection on a active jobsite currently at foundation,upon request to see approved plans,current foundation walls not build
Sep 6, 2018
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 11, 2026 · Apt 2C
Close - Electric
Outlet/switch
Jan 11, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 12, 2024 · Apt 1B
Close - Unsanitary condition
Sewage
Aug 12, 2023 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2017
- Floors
- 4
- Residential units
- 11
- Building area
- 10,290 ft²
- Lot area
- 5,000 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 34
- Block / lot
- 2776 / 6
- Assessed value
- $1,217,700
- Landmark / historic district
- No
Questions about 270 Manhattan Avenue
Who owns 270 Manhattan Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Canton 270, LLC.
Does 270 Manhattan Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 270 Manhattan Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 270 Manhattan Avenue built?
City records list 2017 as the year it was built.
How many apartments are in 270 Manhattan Avenue?
It has 11 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.