roofy

92 Conselyea Street

Brooklyn, NY 11211BBL 3-02758-7502Map

Owner of record: Unavailable Owner

92 Conselyea Street is a condominium built in 2004 in Brooklyn, 11211. It has 8 residential units across 3 floors. The owner of record is Unavailable Owner. HPD has recorded 30 housing violations here, most recently on September 28, 2021. 24 of the 30 most recent violations are still open.

HPD violations
30
DOB violations
3
ECB violations
11
HPD complaints
19

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Sep 28, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 30

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from east located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 28, 2021 · Apt 2B

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 28, 2021 · Apt 2B

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 28, 2021 · Apt 2B

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Sep 28, 2021

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Sep 28, 2021

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 28, 2021

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 28, 2021

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Sep 28, 2021

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Sep 28, 2021

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the 1st room from east at south located at apt 3d lower level, 3rd story, apartment at east

    Aug 11, 2021 · Apt 3D

    Closed — Violation dismissed
Show 20 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 3d lower level, 3rd story, apartment at east

    Aug 11, 2021 · Apt 3D

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... at the ceiling, appx. 4 sq ft in the 1st room from east at south located at apt 3d lower level, 3rd story, apartment at east

    Aug 11, 2021 · Apt 3D

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at north located at apt 3d lower level, 3rd story, apartment at east

    Aug 11, 2021 · Apt 3D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at north located at apt 3d lower level, 3rd story, apartment at east

    Aug 11, 2021 · Apt 3D

    Open — Nov sent out
  • C

    Code: arrange and make self-closing the doors .. in the entrance located at apt 3d lower level, 3rd story, apartment at east

    Aug 11, 2021 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). : missing in the entire apartment located at apt 3d lower level, 3rd story, apartment at east

    Aug 11, 2021 · Apt 3D

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at the ceiling, appx. 4 sq ft in the 1st room from east at south located at apt 3d lower level, 3rd story, apartment at east original violation 14495994 issued 11-aug-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 11, 2021 · Apt 3D

    Open — Defect letter issued
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from south at west

    Jul 26, 2013 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at north located at apt 2c, 2nd story, 2nd apartment from south at west

    Jul 26, 2013 · Apt 2C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at north located at apt 2c, 2nd story, 2nd apartment from south at west

    Jul 26, 2013 · Apt 2C

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from south at west

    Jul 26, 2013 · Apt 2C

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2c, 2nd story, 2nd apartment from south at west

    Jul 26, 2013 · Apt 2C

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing located at apt 2c, 2nd story, 2nd apartment from south at west

    Jul 26, 2013 · Apt 2C

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west

    Jul 26, 2013 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2c, 2nd story, 1st apartment from west at north

    May 28, 2013 · Apt 2C

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north

    May 28, 2013 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from east located at apt 2c, 2nd story, 1st apartment from west at north

    May 28, 2013 · Apt 2C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east located at apt 2c, 2nd story, 1st apartment from west at north

    May 28, 2013 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the terrace located at apt 3c, 4th story, 1st apartment from west at north

    Jul 31, 2009 · Apt 3C

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3c, 4th story, 1st apartment from west at north

    Jul 31, 2009 · Apt 3C

    Open — Not complied with

DOB building violations · 3

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 13, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - active

ECB violations · 11

  • Class - 2

    Failure to certify correction (agg 1). failure to comply with commissioner's order to file a certificate of correction with the department of buildings, contained in summons #39021946r issued 5/6/2020. noted, i

    Aug 25, 2025 · Penalty $10,000

    Active
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation #39021946r issued 5/6/20 and file certificate of correction pursuant to 28-201.1 and rcny 102-01.for:building or open lot occupied w/o

    Nov 13, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation #39021946r issued on 5/6/20 and to file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for:building or open lot occupi

    Sep 20, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#39021946r issued on 5/6/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for building on open lot

    Jul 24, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#39021946r issued on 05/06/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. dob application expired. remedy: comply w/comm's or

    May 26, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#39021946r issued on 5/6/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for b107:building or ope

    Feb 4, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#39021946r issued on 05/06/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c

    Sep 21, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Nb dob application# 301523402 expired on 12/31/2005. as of may, 6 ,2020 the application is still not signed off with the dob. no certificate of occupancy on file. observed apartments # 3d and 2b fully occupied.

    May 6, 2020 · Penalty $12,500

    Active
  • Class - 2

    Failure to comply w/the comm's order to file a cert. of correction w/ the dob.respondent failed to comply w/the comm's order to correct the violating conditions and file a cert. of correction pursuant to 28-204

    Dec 22, 2010 · Penalty $4,000

    Active
  • Class - 1

    New building or op0en lot occupied w/o a valid c of o. note: new building erected under revoked permit #301523402 is now occupied w/o 'sign off' & a valid c of o. remedy: discontinue illegal use or obtain c of

    Oct 9, 2010 · Penalty $10,000

    Active
Show 1 more ↓
  • Class - 1

    New building or open lot occupied w/o a valid c of o. entire bldg all dwelling units occupied w/o a c of o nb appl #301523402 approved on 6-3-03 has been revoked on 12-7-09 no final inspection conducted.

    Aug 3, 2010 · Penalty $5,000

    Active

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Oct 4, 2026 · Apt BLDG

    Open
  • Water leak

    Heavy flow

    Oct 4, 2023 · Apt 1D

    Close
  • Water leak

    Slow leak

    Oct 4, 2023 · Apt 1D

    Close
  • Unsanitary condition

    Mold

    Oct 4, 2023 · Apt 1D

    Close
  • Unsanitary condition

    Mold

    Sep 22, 2021 · Apt 2B

    Close
  • Water leak

    Slow leak

    Aug 4, 2021 · Apt 3D

    Close
  • Water leak

    Damp spot

    Aug 4, 2021 · Apt 3D

    Close
  • Plumbing

    Water-leaks

    Jul 22, 2013 · Apt 2C

    Close
  • Plumbing

    Water-leaks

    Jul 22, 2013 · Apt 2C

    Close
  • Paint/plaster

    Ceiling

    Jul 22, 2013 · Apt 2C

    Close
Show 9 more ↓
  • Paint/plaster

    Ceiling

    Jul 22, 2013 · Apt 2C

    Close
  • Paint/plaster

    Ceiling

    Jul 22, 2013 · Apt 2C

    Close
  • Plumbing

    Water-leaks

    May 22, 2013 · Apt 2C

    Close
  • Plumbing

    Water-leaks

    May 22, 2013 · Apt 2C

    Close
  • Plumbing

    Water-leaks

    Oct 11, 2010 · Apt 2C

    Close
  • Plumbing

    Water-leaks

    Oct 28, 2009 · Apt 3D

    Close
  • Plumbing

    Water-leaks

    Oct 28, 2009 · Apt 3D

    Close
  • Construction

    Pavement

    Jul 28, 2009 · Apt 3C

    Close
  • Plumbing

    Water-leaks

    Jul 28, 2009 · Apt 3C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
2004
Floors
3
Residential units
8
Building area
8,426 ft²
Lot area
2,454 ft²
Zoning
R6B
Community board
301
Council district
34
Block / lot
2758 / 7502
Assessed value
$1,466,998
Landmark / historic district
No

Questions about 92 Conselyea Street

Who owns 92 Conselyea Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 92 Conselyea Street have violations?

Yes. NYC HPD has recorded 30 housing violations at this property.

Is 92 Conselyea Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 92 Conselyea Street built?

City records list 2004 as the year it was built.

How many apartments are in 92 Conselyea Street?

It has 8 residential units and 17 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.