92 Conselyea Street
Brooklyn, NY 11211BBL 3-02758-7502Map
Owner of record: Unavailable Owner
92 Conselyea Street is a condominium built in 2004 in Brooklyn, 11211. It has 8 residential units across 3 floors. The owner of record is Unavailable Owner. HPD has recorded 30 housing violations here, most recently on September 28, 2021. 24 of the 30 most recent violations are still open.
- HPD violations
- 30
- DOB violations
- 3
- ECB violations
- 11
- HPD complaints
- 19
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from east located at apt 2b, 2nd story, 1st apartment from south at west
Sep 28, 2021 · Apt 2B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Sep 28, 2021 · Apt 2B
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Sep 28, 2021 · Apt 2B
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 28, 2021
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Sep 28, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 28, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 28, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Sep 28, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Sep 28, 2021
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from east at south located at apt 3d lower level, 3rd story, apartment at east
Aug 11, 2021 · Apt 3D
Closed — Violation dismissed
Show 20 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 3d lower level, 3rd story, apartment at east
Aug 11, 2021 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at the ceiling, appx. 4 sq ft in the 1st room from east at south located at apt 3d lower level, 3rd story, apartment at east
Aug 11, 2021 · Apt 3D
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at north located at apt 3d lower level, 3rd story, apartment at east
Aug 11, 2021 · Apt 3D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at north located at apt 3d lower level, 3rd story, apartment at east
Aug 11, 2021 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors .. in the entrance located at apt 3d lower level, 3rd story, apartment at east
Aug 11, 2021 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). : missing in the entire apartment located at apt 3d lower level, 3rd story, apartment at east
Aug 11, 2021 · Apt 3D
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at the ceiling, appx. 4 sq ft in the 1st room from east at south located at apt 3d lower level, 3rd story, apartment at east original violation 14495994 issued 11-aug-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 11, 2021 · Apt 3D
Open — Defect letter issued - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from south at west
Jul 26, 2013 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at north located at apt 2c, 2nd story, 2nd apartment from south at west
Jul 26, 2013 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at north located at apt 2c, 2nd story, 2nd apartment from south at west
Jul 26, 2013 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from south at west
Jul 26, 2013 · Apt 2C
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2c, 2nd story, 2nd apartment from south at west
Jul 26, 2013 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 2c, 2nd story, 2nd apartment from south at west
Jul 26, 2013 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Jul 26, 2013 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2c, 2nd story, 1st apartment from west at north
May 28, 2013 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north
May 28, 2013 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from east located at apt 2c, 2nd story, 1st apartment from west at north
May 28, 2013 · Apt 2C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east located at apt 2c, 2nd story, 1st apartment from west at north
May 28, 2013 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the terrace located at apt 3c, 4th story, 1st apartment from west at north
Jul 31, 2009 · Apt 3C
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3c, 4th story, 1st apartment from west at north
Jul 31, 2009 · Apt 3C
Open — Not complied with
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - active
ECB violations · 11
- Class - 2
Failure to certify correction (agg 1). failure to comply with commissioner's order to file a certificate of correction with the department of buildings, contained in summons #39021946r issued 5/6/2020. noted, i
Aug 25, 2025 · Penalty $10,000
Active - Class - 2
Failure to comply with commissioner's order contained in summons/violation #39021946r issued 5/6/20 and file certificate of correction pursuant to 28-201.1 and rcny 102-01.for:building or open lot occupied w/o
Nov 13, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #39021946r issued on 5/6/20 and to file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for:building or open lot occupi
Sep 20, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39021946r issued on 5/6/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for building on open lot
Jul 24, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39021946r issued on 05/06/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. dob application expired. remedy: comply w/comm's or
May 26, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39021946r issued on 5/6/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for b107:building or ope
Feb 4, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39021946r issued on 05/06/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c
Sep 21, 2020 · Penalty $5,000
Resolve - Class - 1
Nb dob application# 301523402 expired on 12/31/2005. as of may, 6 ,2020 the application is still not signed off with the dob. no certificate of occupancy on file. observed apartments # 3d and 2b fully occupied.
May 6, 2020 · Penalty $12,500
Active - Class - 2
Failure to comply w/the comm's order to file a cert. of correction w/ the dob.respondent failed to comply w/the comm's order to correct the violating conditions and file a cert. of correction pursuant to 28-204
Dec 22, 2010 · Penalty $4,000
Active - Class - 1
New building or op0en lot occupied w/o a valid c of o. note: new building erected under revoked permit #301523402 is now occupied w/o 'sign off' & a valid c of o. remedy: discontinue illegal use or obtain c of
Oct 9, 2010 · Penalty $10,000
Active
Show 1 more ↓
- Class - 1
New building or open lot occupied w/o a valid c of o. entire bldg all dwelling units occupied w/o a c of o nb appl #301523402 approved on 6-3-03 has been revoked on 12-7-09 no final inspection conducted.
Aug 3, 2010 · Penalty $5,000
Active
Complaints
- Unsanitary condition
Garbage/recycling storage
Oct 4, 2026 · Apt BLDG
Open - Water leak
Heavy flow
Oct 4, 2023 · Apt 1D
Close - Water leak
Slow leak
Oct 4, 2023 · Apt 1D
Close - Unsanitary condition
Mold
Oct 4, 2023 · Apt 1D
Close - Unsanitary condition
Mold
Sep 22, 2021 · Apt 2B
Close - Water leak
Slow leak
Aug 4, 2021 · Apt 3D
Close - Water leak
Damp spot
Aug 4, 2021 · Apt 3D
Close - Plumbing
Water-leaks
Jul 22, 2013 · Apt 2C
Close - Plumbing
Water-leaks
Jul 22, 2013 · Apt 2C
Close - Paint/plaster
Ceiling
Jul 22, 2013 · Apt 2C
Close
Show 9 more ↓
- Paint/plaster
Ceiling
Jul 22, 2013 · Apt 2C
Close - Paint/plaster
Ceiling
Jul 22, 2013 · Apt 2C
Close - Plumbing
Water-leaks
May 22, 2013 · Apt 2C
Close - Plumbing
Water-leaks
May 22, 2013 · Apt 2C
Close - Plumbing
Water-leaks
Oct 11, 2010 · Apt 2C
Close - Plumbing
Water-leaks
Oct 28, 2009 · Apt 3D
Close - Plumbing
Water-leaks
Oct 28, 2009 · Apt 3D
Close - Construction
Pavement
Jul 28, 2009 · Apt 3C
Close - Plumbing
Water-leaks
Jul 28, 2009 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2004
- Floors
- 3
- Residential units
- 8
- Building area
- 8,426 ft²
- Lot area
- 2,454 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 34
- Block / lot
- 2758 / 7502
- Assessed value
- $1,466,998
- Landmark / historic district
- No
Questions about 92 Conselyea Street
Who owns 92 Conselyea Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 92 Conselyea Street have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 92 Conselyea Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 92 Conselyea Street built?
City records list 2004 as the year it was built.
How many apartments are in 92 Conselyea Street?
It has 8 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.