390 Leonard Street
Brooklyn, NY 11211BBL 3-02733-0006Map
Owner of record: Leonard Flats LLC
390 Leonard Street is an elevator apartment building built in 2020 in Brooklyn, 11211. It has 10 residential units across 6 floors. The owner of record is Leonard Flats LLC. HPD has recorded 25 housing violations here, most recently on June 16, 2025.
- HPD violations
- 25
- DOB violations
- 7
- ECB violations
- 39
- HPD complaints
- 11
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at the ceiling and walls in the entire apartment located at apt 1, 1st story
Aug 24, 2017 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Aug 24, 2017 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 1st story
Aug 24, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all walls and ceilings in the entire apartment located at apt 2, 1st story
Aug 24, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at the ceiling at public hall
Aug 24, 2017
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 21, 2017
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls in the entire apartment located at apt 1a, 1st story, apartment at north
Aug 18, 2017 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, apartment at north
Aug 18, 2017 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1a, 1st story, apartment at north
Aug 18, 2017 · Apt 1A
Closed — Violation closed
Show 15 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, apartment at north
Aug 18, 2017 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls in the entire apartment located at apt 2b, 2nd story, apartment at north
Aug 18, 2017 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 2b, 2nd story, apartment at north
Aug 18, 2017 · Apt 2B
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2b, 2nd story, apartment at north
Aug 18, 2017 · Apt 2B
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2b, 2nd story, apartment at north
Aug 18, 2017 · Apt 2B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 2b, 2nd story, apartment at north
Aug 18, 2017 · Apt 2B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 2b, 2nd story, apartment at north
Aug 18, 2017 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2b, 2nd story, apartment at north
Aug 18, 2017 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all storys at public hall
Aug 18, 2017
Closed — Violation closed - BHazardous
Replace with new the missing handrail at public hall stairs, 1st story
Aug 18, 2017
Closed — Violation closed - BHazardous
Properly repair the broken or defective electric wall outlets , in the entire apartment located at apt 1, 1st story
Oct 25, 2008 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling , in the kitchen located at apt 1, 1st story
Oct 25, 2008 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective electric ceiling light fixtures , in the entire apartment located at apt 1, 1st story
Oct 25, 2008 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1, 1st story
Oct 25, 2008 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of no electric supply all stories , at public hall
Oct 25, 2008
Closed — Violation closed
DOB building violations · 7
- Construction other optional
Work without permit noted: at time of inspection observed balconies at exp#1 and #3 fully enclosed illegally, increasing the habitable use adding dead/live loads on all floors without a permit.
Oct 13, 2026
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed
ECB violations · 39
- Class - 1
Work without permit noted: at time of inspection observed balconies at exp#1 and #3 fully enclosed illegally, increasing the habitable use adding dead/live loads on all floors without a permit., obtain permit
Oct 13, 2026 · Penalty $2,500
Active - Class - 2
Work does not conform to approved construction documents and/or approved amendments.at time of inspection i observed all operable windows installed to have a v-factor rating of .29.approved plans call for opera
May 31, 2023 · Penalty $1,250
Resolve - Class - 2
No en drawing, com/check and architectural drawing approved from dob provided on job site at the time of inspection., provide approved /accepted construction documents; please go to https://www1.nyc.gov/site/bu
Mar 21, 2023
Resolve - Class - 1
Failure to institute safety equipment measures or temporary construction no guardrails.as noted:at time of inspection at an active jobsite for a proposed 6 story building at bulkhead level observed a missing gu
Mar 14, 2023
Resolve - Class - 1
Inadequate guardrails missing toeboards.as noted:at time of inspectionat an active jobsite for a proposed 6 story building at bulkhead levelobserved inadequate guardrail missing toeboards at floor 5th garbage t
Mar 14, 2023
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments.at time of inspection i observed active site with cp present upon inspection was noted sws has been erected contrary to approv
Feb 20, 2023
Resolve - Class - 1
Bc 3303.16 contractors sheds and offices.at time of inspection of 6 story nb observed at exp#3 contractors sheds offices within 30 ft of newconstruction not as per code.observed that the two sheds/offices built
Feb 1, 2022 · Penalty $625
Resolve - Class - 2
Failure to comply with manufacture specifications at time of inspection of 6 story nb,observed plastic barriers on roadway at exp#1 not as manufacture specifications.barriers not locked in place allowing cars t
Feb 1, 2022
Resolve - Class - 2
Bc 3301.6 design,size and capacity of materials,structures,temporary construction and equipment.at time of inspection of 6 story nb active jobsite observed at exp#1 temporary staircase to access from ground flo
Feb 1, 2022
Resolve - Class - 1
Ac 28-104.7.1,bc 107,bc 1603,bc 1704.1.1 inadequate design documents/drawings. per ceu engineering audit,upon review of structural drawings prepared and signed&sealed by vachagan grigoryan,p.e. the construction
Aug 28, 2020
Resolve
Show 29 more ↓
- Class - 1
Bc 1704.1.3,bc 3301.7 based on ceu inspection and ceu audit findings,the respondent failed to perform permit holder responsibilities/duties.non-compliance items include but not limited to the following:construc
Aug 28, 2020
Resolve - Class - 1
Bc 1704.1.2,1-rcny 101-06 based on ceu audit and ceu site inspection,the respondent failed to perform tr-1 special inspection duties. special inspection non-compliant items include but not limited to the follow
Aug 28, 2020 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments:as noted at time of my inspection of a 6 stories bldgs observed work does not conform (1)(3)column in place at exposure 3 not sho
Aug 5, 2020 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments.as noted:at time of inspection on an active construction site,metal c-joint work at fl #3.observed at ground level layout for col
Aug 3, 2020 · Penalty $1,250
Resolve - Class - 2
Bc3303.14/drainage-at time of inspeciton an a proposed 6 story building currently at excavation phase observed at exposure #2 front of side accumulation of water adjacent to existing foundation wall and at expo
Dec 16, 2019
Resolve - Class - 1
Bc3301.13.1/inadequate site safety plan.at time of inspection on a proposed 6 story new building currently at excavation phase observed in adequate egress on site for entry to exposure#3 upon request for site s
Dec 16, 2019
Resolve - Class - 1
Inadequate housekeeping/at time of inspection on a proposed 6 story new building currently t excavation phase observd rebar,rocks material bricks,cardboard & rubbish scattered throughout the site causing a seve
Dec 16, 2019
Resolve - Class - 1
Bc3301.2/inadequate egress.at time of inspection on a proposed 6-storybuilding currently at excavation phase observed inadequate egress at exposures #2 and #4 to get to exposure#3 of the site.at exposure #2 obs
Dec 16, 2019
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in notice of violation # 3448613yn issued on 07/19/05 ( work w/o permit ) remedy : comply w/ the commissioner's order
Sep 24, 2011 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/ the comm order contained in nov#34486131y issued on 7/19/05 work w/o permit at 1st & 2nd fl rem: comply w/ the comms order
Sep 17, 2011 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34908409r issued on 7/19/05,for work w/o permit - flr 1 & 2. remedy: comply w/the commissioner's order.
Jul 21, 2011 · Penalty $25,000
Resolve - Class - 1
Unlawful acts failure to comply w/an order of the comm's noted:respondent failed to correct the conditions cited in the prior nov#34486131y for work w/o a permit creating illegal sro's @ 1st & 2nd flrs.rem:comp
May 6, 2011 · Penalty $12,000
Resolve - Class - 1
Failure to correct ecb #34486131y for illegal work in bldg respondent has a history of non-compliance w/ dob rem: obtain permit
Mar 24, 2011 · Penalty $25,000
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. respondent failed to correct the violating condition cited in nov #34486131y no record of compliance note in the dob records. remedy: comply with
Oct 9, 2010 · Penalty $24,000
Resolve - Class - 1
Unlawful acts. fail to comply w.comm order. noted: respondent failed to correct the violating condition cited in nov 344861314. erected partitions & installed 3 pc bathroom along with a kitchen with gas stove
Aug 14, 2010 · Penalty $24,000
Resolve - Class - 1
Unlawful acts. fail to comply w/comm order. respondent failed to correct the condition cited in the nov 34486131y- partitions erected on the1st & 2nd fl along with the installation of 3 pc bathroom & kitchen w/
Mar 27, 2010 · Penalty $24,000
Resolve - Class - 2
Failure to comply w/an order of the commisisoner to file a cert. of correction w/the dept.of bldgs.note:resp'd failed to comply w/the comm'sorder to correct the violating conditions & file a cert. of correction
Oct 10, 2009 · Penalty $4,000
Resolve - Class - 1
Unlawful acts:failure to comply w/an order of the commisioner.note:resp'd failed to correct the conditions cited in nov#44860131y.partitions erected on the 1st & 2nd flrs along w/the installation of 3pc bathroo
Oct 10, 2009 · Penalty $12,000
Resolve - Class - 1
Sec 28-201.1 misc viol: fail to comply w/comm order to obtain a permitper violation # 3446131y. partitions erected on the 1st & 2nd floors along w/the installation of a 3pc bathroom & a kitchen w/gas stove in
May 14, 2009 · Penalty $8,000
Resolve - Class - 1
Sec. 28-201.1 failure to comply with the commissioner's order to obtain a permit per violation #34486131y in that partitions have been erected on the 1st & 2nd flrs along with the installation of a 3pc bathroom
Oct 25, 2008 · Penalty $8,000
Resolve - Hazardous
Failure to comply with an order of the commissioner correct the violating condition of nov # 34486131y.erected partitions on the fist andsecond flor along along with 3 piece bathroom and kitchen with gas st
May 8, 2008 · Penalty $5,000
Resolve - Hazardous
Failure to w/ an order of the commissioner to correct the condition innov #34486131y. work w/o a permit hazardous full partition walls erected on 1st & 2nd story in various locations. creating for sros on each
Dec 19, 2007 · Penalty $5,000
Resolve - Hazardous
Failure to comply w/ an order of the comm to correct vio #34486131y for work w/o permit. no cert of correction. remedy: comply w/ comms order & obtain permit.
Aug 15, 2007 · Penalty $5,000
Resolve - Hazardous
Failure to comply w/commissioner's order to correct #34516175k for work w/o a permit.all conditions noted on violation.remedy:comply w/orderobtain all dob permits.
Apr 3, 2007 · Penalty $5,000
Resolve - Hazardous
Failure to comply w/an order of the dept to correct vio#34486131y for work w/o permit(partitions & plumbing & gas line fls 1 & 2) remedy:comply w/dept order & obtain permit.
Nov 1, 2006 · Penalty $5,000
Resolve - Hazardous
Violation written based upon no records of correction for ecb #34486131y issued 7/9/05 for work w/o a permit for partitions, gas line & plumbing on 1st & 2nd flr. remedy;comply with commissioners orders.
Jun 3, 2006 · Penalty $5,000
Resolve - Hazardous
Failure to maintain adequate housekeeping.note.at front of building pile of wood with protruding nails being stored in an unsafe condition.remedy:maintain adequate housekeping forthwith.
Jul 19, 2005 · Penalty $1,000
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families.note:department property profile overview records indicate 'b2-2 family dwelling".now full partition walls ill
Jul 19, 2005 · Penalty $38,500
Resolve - Hazardous
Work without a permit.hazardous.note:full partition walls illegally erected in first and second story at various locations illegally creating four sro's on each floor.three piece bathroom and kitchen with gas
Jul 19, 2005 · Penalty $2,500
Resolve
Complaints
- Electric
Power outage
Aug 18, 2017 · Apt 1
Close - Electric
No lighting
Aug 14, 2017 · Apt 1A
Close - Heating
Heat related
Oct 28, 2008 · Apt 2
Close - Heating
Heat related
Oct 25, 2008 · Apt 1
Close - Electric
Electric-supply
Oct 25, 2008 · Apt 1
Close - Electric
Wiring
Oct 25, 2008 · Apt 1
Close - Electric
Electric-supply
Oct 25, 2008 · Apt 1
Close - General
Mold
Mar 20, 2006 · Apt 2
Close - Electric
Bell-buzzer/intercom
Mar 20, 2006 · Apt 2
Close - Nonconst
Vermin
Mar 20, 2006 · Apt 2
Close
Show 1 more ↓
- Heating
Heat related
Apr 26, 2005 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2020
- Floors
- 6
- Residential units
- 10
- Building area
- 7,082 ft²
- Lot area
- 2,500 ft²
- Zoning
- M1-2/R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2733 / 6
- Assessed value
- $690,300
- Landmark / historic district
- No
HPD registration #391466, last renewed Jul 23, 2025.
Questions about 390 Leonard Street
Who owns 390 Leonard Street?
The owner of record in NYC Department of City Planning PLUTO data is Leonard Flats LLC.
Does 390 Leonard Street have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 390 Leonard Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 390 Leonard Street built?
City records list 2020 as the year it was built.
How many apartments are in 390 Leonard Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.