415 Manhattan Avenue
Brooklyn, NY 11222BBL 3-02723-0030Map
Owner of record: Manhattan Ave Units LLC
415 Manhattan Avenue is an elevator apartment building built in 2020 in Brooklyn, 11222. It has 9 residential units across 6 floors. The owner of record is Manhattan Ave Units LLC. HPD has recorded 3 housing violations here, most recently on June 7, 2018.
- HPD violations
- 3
- DOB violations
- 1
- ECB violations
- 17
- HPD complaints
- 5
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1f, 1st story, 1st apartment from north at east
Jun 7, 2018 · Apt 1F
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the trash at basement
Jun 7, 2018
Closed — Violation closed - ANon-hazardous
Refit front entrance door located at apt 1f, 1st story, 1st apartment from north at east
Jun 7, 2018 · Apt 1F
Closed — Violation closed
DOB building violations · 1
- Unsafe buildings none
Ub-unsafe buildings none
Sep 29, 2018
Dob violation - dismissed
ECB violations · 17
- Class - 2
Permanent dwelling used/converted for other than permanent residentialpurposes. department of buildings records indicate building to be legally approved as a class 'a' multiple dwelling now apartment 6a, 6th fl
Aug 6, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in a code-compliant manner, failure to provide number of means of egress for every floor as per bc 1008.1(2008 code); 27-366; bc 1021.1(2014 code); bc 1006.3(2022 code) for transien
Aug 6, 2025 · Penalty $2,500
Resolve - Class - 1
Bc 907.2.8. failure to maintain building in a code-compliant manner. failure to provide "class j: fire alarm system for transient use at 6thfloor level; apt 6a. remedy: discontinue illegal occupancy.
Aug 6, 2025 · Penalty $2,500
Resolve - Class - 2
Permanent dwelling used/converted for other than permanent residentialpurposes.department of buildings records indicate building to be legally approved as a class a multiple dwelling,now apartment 6a,6th floor
Aug 6, 2025
Resolve - Class - 1
Failure to maintain building in a code compliant manner.failure to provide required number of means of egress for every floor as per bc 1008.1(2008 code),27-366,bc 1021.1(2014 code);bc 1006.3(2022 code)for tran
Aug 6, 2025
Resolve - Class - 1
Bc 907.2.8 failure to maintain building in a code compliant manner.failure to provide class j fire alaram system for transient use at 6th floor level apt 6a.rem:discontinue illegal occupancy.
Aug 6, 2025
Resolve - Class - 2
Pedestrian protection does not meet code specifications and manufacturer specs.at the time of inspection of a 6 story nb observed jersey barriers on sidewalk that were not as per manufacturer specs being connec
Feb 15, 2022 · Penalty $625
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order complaint #3819233 "no exterior work allowed at exp.#1".at time of inspectionon an active permit 6 story new bldg w/partial stop work order in effe
Nov 22, 2021
Resolve - Class - 1
Work does not conform to approved documents and or amendments(sidewalk shed)at time of inspection observed proposed 6 story new building with work activity present observed contractor failed to install sws at e
Oct 26, 2021
Resolve - Class - 1
Bc3314.4.3.5 pre-shift inspection for supported scaffold.at time of inspection of proposed 6 story new building with work activity present observed contractor failed to truthfully record field conditions in ins
Oct 26, 2021 · Penalty $312
Resolve
Show 7 more ↓
- Class - 1
Work does not conform to approved documents and/or approved amendments(pipe scafold)at time of inspection of proposed 6 story new building with work activity present observed contractor failed to install saffol
Oct 26, 2021
Resolve - Class - 2
Failure to maintain pipe scaffold as per code. at time of inspection on an active 6 story nb construction site, notice at exposure #1 of the construction site pipe scaffolding. the scaffold was not maintain as
Sep 16, 2021
Resolve - Class - 1
Bc3307.2.6 pathway,failure to maintain required temp walkway.note:atoiof 6flnb currently@6fl level,work in progress.i observed instructed sws@exp1&since pathway <5'w that walkway under sws contrary w/code¬ p
Jun 10, 2021
Resolve - Class - 1
3308.5 vert netting system.note:atoi of 6stynb currently26fl level,work in progress.i observed vert netting system&guardrails inadequate forheights (60")&had gaps&missing bottom rails.as per secs vert netting s
Jun 10, 2021
Resolve - Class - 1
3314.1 failure to maintain scaffold as per code.note at time of inspection of 6 story new building currently at 6th floor level work in progress,i observed scaffold on exp1 & 3 with loose planks,missing guardra
Jun 10, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons&property affected by const operations.note:atoi of 6flnb currently@6fl level,work in progress.i observed adj bldgs on exp2&4 had doors for pple to access but no overhead protect
Jun 10, 2021 · Penalty $5,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.note at time of inspection of 6 story new building currently at 6th floorlevel work in progress,i observed that the contractor did not maintain
Jun 10, 2021 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Pests
May 21, 2018 · Apt 1F
Close - Heat/hot water
Entire building
Feb 7, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2018 · Apt 1
Close - Heat/hot water
Entire building
Jan 2, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 9, 2017 · Apt 1STFL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2020
- Floors
- 6
- Residential units
- 9
- Building area
- 8,138 ft²
- Lot area
- 2,500 ft²
- Zoning
- M1-2/R6A
- Community board
- 301
- Council district
- 33
- Block / lot
- 2723 / 30
- Assessed value
- $1,053,000
- Landmark / historic district
- No
HPD registration #391248, last renewed Jul 23, 2025.
Questions about 415 Manhattan Avenue
Who owns 415 Manhattan Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Manhattan Ave Units LLC.
Does 415 Manhattan Avenue have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 415 Manhattan Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 415 Manhattan Avenue built?
City records list 2020 as the year it was built.
How many apartments are in 415 Manhattan Avenue?
It has 9 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.