262 Nassau Avenue
Brooklyn, NY 11222BBL 3-02690-0001Map
Owner of record: Kim, Yun Jung
262 Nassau Avenue is a mixed residential and retail building built in 1923 in Brooklyn, 11222. It has 4 residential units across 3 floors. The owner of record is Kim, Yun Jung. HPD has recorded 66 housing violations here, most recently on May 7, 2026. 12 of the 50 most recent violations are still open.
- HPD violations
- 66
- DOB violations
- 13
- ECB violations
- 1
- HPD complaints
- 49
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 66
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Sep 16, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from south at west
Sep 16, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 16, 2025
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening slide bolt lock at hatch leading to roof , 3rd story
Sep 16, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 16, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 16, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 16, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Sep 16, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Sep 16, 2025
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2023
Closed — Violation dismissed - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof ... at public hall, 3rd story
Sep 5, 2023
Open — Not complied with - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at east exterior wall. at fire escape
Sep 5, 2023
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 23, 2016
Closed — Violation dismissed - BHazardous
Replace with new the missing electric outlet cover at east wall in the 3rd room from north located at apt 2r, 2nd story, 1st apartment from south at west
May 13, 2015 · Apt 2R
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective lower sash glass pane at window in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
May 13, 2015 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceilings in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
May 13, 2015 · Apt 2R
Closed — Violation dismissed - BHazardous
Replace with new the missing electric outlet cover at west wall in the 3rd room from north located at apt 2r, 2nd story, 1st apartment from south at west
May 13, 2015 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall and ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
May 13, 2015 · Apt 2R
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 2 sq. ft in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
May 13, 2015 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of improperly installed electric outlet at east wall in the 3rd room from north located at apt 2r, 2nd story, 1st apartment from south at west
May 13, 2015 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden floor in the kitchen located at apt 3l, 3rd story
Aug 8, 2008 · Apt 3L
Open — First no access to re- inspect violation - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east
Aug 8, 2008 · Apt 3L
Open — First no access to re- inspect violation - ANon-hazardous
Refit window sashes in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Aug 8, 2008 · Apt 3L
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings throughout in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 21, 2008 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 21, 2008 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective wood cabinet at west wall in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
May 21, 2008 · Apt 1A
Closed — Violation dismissed - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing drop-ladder shoe yard
May 21, 2008
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 21, 2008 · Apt 1A
Closed — Violation dismissed - BHazardous
Replace with new the missing stove in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
May 21, 2008 · Apt 1A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south
Dec 19, 2007 · Apt 1FL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling throughout in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south
Dec 19, 2007 · Apt 1FL
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story, apartment at south
Nov 5, 2007 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the bathroom located at apt 2r, 2nd story, apartment at south
Nov 5, 2007 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 2r, 2nd story, apartment at south
Nov 5, 2007 · Apt 2R
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of evidence of water leak at ceiling in the 1st room from north located at apt 2r, 2nd story, apartment at south
Nov 5, 2007 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at east wall in the bathroom located at apt 2r, 2nd story, apartment at south
Nov 5, 2007 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at door in the entrance located at apt 2r, 2nd story, apartment at south
Nov 5, 2007 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ceiling light fixture at public hall, 3rd story
Nov 5, 2007
Closed — Violation dismissed - ANon-hazardous
File with this department a registration statement for building.
Apr 11, 1997
Closed — Violation dismissed - BHazardous
D26-13.03 adm code abate the nuisance consisting of vermin mice & roaches 2 sty west apt 2. , section '' ''
Mar 21, 1985 · Apt 2
Closed — Violation closed - BHazardous
D26-16.01 adm code repair the leaky and/or defective faucets sink 2 sty west apt 1 kitchen. located at apt 1
Jan 8, 1985 · Apt 1
Closed — Violation closed
DOB building violations · 13
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 3 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active
ECB violations · 1
- Hazardous
No riggers license.no prior danger signs. no toc board center board.
Aug 27, 1995 · Penalty $6,000
Active
Complaints
- Safety
Sprinkler
Aug 30, 2023 · Apt 3L
Close - Heat/hot water
Apartment only
Feb 11, 2023 · Apt 3L
Close - Heat/hot water
Entire building
Feb 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2021 · Apt BLDG
Close - Door/window
Door
Apr 29, 2015 · Apt 2R
Close - Paint/plaster
Ceiling
Apr 29, 2015 · Apt 2R
Close - Unsanitary condition
Mold
Apr 29, 2015 · Apt 2R
Close - Door/window
Window pane
Apr 29, 2015 · Apt 2R
Close - Safety
Carbon monoxide detector
Apr 29, 2015 · Apt 2R
Close - Paint/plaster
Wall
Apr 29, 2015 · Apt 2R
Close
Show 39 more ↓
- Paint/plaster
Wall
Apr 29, 2015 · Apt 2R
Close - Electric
Outlet/switch
Apr 29, 2015 · Apt 2R
Close - Unsanitary condition
Mold
Apr 29, 2015 · Apt 2R
Close - General
Floor
May 16, 2008 · Apt 1A
Close - Paint/plaster
Ceiling
May 16, 2008 · Apt 1A
Close - General
Mold
May 16, 2008 · Apt 1A
Close - Paint/plaster
Wall
May 16, 2008 · Apt 1A
Close - Appliance
Electric/gas range
May 16, 2008 · Apt 1A
Close - General
Windows
Apr 10, 2008 · Apt 3L
Close - General
Floor
Apr 10, 2008 · Apt 3L
Close - Electric
Electric-supply
Mar 15, 2008 · Apt 1A
Close - Plumbing
Water supply
Mar 6, 2008 · Apt 1A
Close - Plumbing
Water supply
Mar 6, 2008 · Apt 1A
Close - Heating
Heat related
Feb 7, 2008 · Apt 3L
Close - Electric
Lighting
Feb 7, 2008 · Apt 3L
Close - Plumbing
Water supply
Dec 19, 2007 · Apt 1FL
Close - Plumbing
Water supply
Dec 19, 2007 · Apt 1FL
Close - Heating
Heat related
Dec 17, 2007 · Apt 1A
Close - Heating
Heat related
Dec 13, 2007 · Apt 1FL
Close - Plumbing
Water-leaks
Oct 29, 2007 · Apt 2R
Close - General
Ceramic-tile
Oct 29, 2007 · Apt 2R
Close - Paint/plaster
Wall
Oct 29, 2007 · Apt 2R
Close - Paint/plaster
Ceiling
Oct 29, 2007 · Apt 2R
Close - Heating
Heat related
Oct 29, 2007 · Apt 2R
Close - Plumbing
Water supply
Apr 26, 2007 · Apt 1A
Close - Plumbing
Water supply
Apr 26, 2007 · Apt 1A
Close - Plumbing
Water supply
Jan 15, 2007 · Apt 1A
Close - Electric
Electric-supply
Jan 15, 2007 · Apt 1A
Close - Heating
Heat related
Jan 15, 2007 · Apt 1A
Close - Heating
Heat related
Jan 13, 2007 · Apt 1A
Close - Heating
Heat related
Jan 11, 2007 · Apt 1A
Close - Heating
Heat related
Jan 8, 2007 · Apt 1A
Close - Appliance
Electric/gas range
Jan 8, 2007 · Apt 1A
Close - Electric
Electric-supply
Jan 8, 2007 · Apt 1A
Close - Plumbing
Water supply
Jan 3, 2007 · Apt 1A
Close - Electric
Electric-supply
Jan 3, 2007 · Apt 1A
Close - General
Cooking gas
Jan 3, 2007 · Apt 1A
Close - Heating
Heat related
Jan 3, 2007 · Apt 1A
Close - Heating
Heat related
Oct 28, 2005 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1923
- Floors
- 3
- Residential units
- 4
- Building area
- 4,500 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 33
- Block / lot
- 2690 / 1
- Assessed value
- $527,850
- Landmark / historic district
- No
HPD registration #361074, last renewed Aug 22, 2025.
Questions about 262 Nassau Avenue
Who owns 262 Nassau Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Kim, Yun Jung.
Does 262 Nassau Avenue have violations?
Yes. NYC HPD has recorded 66 housing violations at this property.
Is 262 Nassau Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 262 Nassau Avenue built?
City records list 1923 as the year it was built.
How many apartments are in 262 Nassau Avenue?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.