Violations at 888 Lorimer Street
Brooklyn, NY 11222 · BBL 3-02679-0060 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
17 DOB violations, newest first.
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 19, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 19, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 3, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 2, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 6, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Aug 6, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Apr 26, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Mar 29, 2018
Vp*-violation unserved ecb- dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations
28 ECB violations, newest first.
- Class - 2
Bc330161-design drawing-platform in elevator shaft.at time of inspection on a 6 story building observed at cellar level,an elevator pit under construction with a temporary platform in place made out of planks(w
Dec 10, 2019 · Penalty $620
Resolve - Class - 1
Permit holder failed to ensure that workers received pre-shift safety meeting prior to commecement of work.at time of inspection on a 6 story new building observed construction operations in progress such as gr
Dec 10, 2019 · Penalty $5,000
Resolve - Class - 1
Bc33012-failure to institute safety measures-fall protection.at time of inspeciton on a 6 story new building observed at exposure#1 6th floor balcony a worker working on a ladder using a grinder on a post on th
Dec 10, 2019 · Penalty $2,500
Resolve - Class - 2
Bc33012-failure to maintain/institute safety measures-at time of inspection on a 6 story new building observed at cellar a temporary platform/scaffold in place in place to construct proposed elevator pit from c
Dec 10, 2019 · Penalty $620
Resolve - Class - 2
Failure to provide approved/accepted construction documents at jobsiteat time of inspection.at time of inspection on a 6 story new building at cellar level observed a elevator put under construction with cmu.up
Dec 10, 2019 · Penalty $625
Resolve - Class - 2
28-105.12 conditions of new bldg permit.as noted:@ time of insp on an active const,observed under new bldg permit job# 321192794,doc 1 line #13 bldg characteristics primary structural system listed as concrete
Jan 24, 2019 · Penalty $620
Resolve - Class - 1
Work w/o a permit. observed installation of sprinkler piping and headsthroughout new building construction in progress. no permit on record for noted work at dob. new building permit#321192794 expires 9/12/19.
Dec 28, 2018 · Penalty $625
Resolve - Class - 1
Missing toeboards.at time of inspection i observed toeboards on teh terrace evels 2,3,4 at exposure 1,failure to provide toeboards as part of thr guardrail system creates a hazard to worker in person from falli
Dec 18, 2018 · Penalty $2,500
Resolve - Class - 1
Expired insurance.at time of inspection of an active 6 story construciton site,i observed workers throughout site conducting electrical work ,safety work,material handling and other misc construction tasks.upon
Dec 18, 2018 · Penalty $625
Resolve - Class - 2
Failure to safeguard all public and property affected by construction operation. note:at the time of my inspection of a 6 story building at roof level construction work in progress i observed that there were no
Oct 2, 2018 · Penalty $5,000
Resolve - Class - 1
Bc-3305.2.2 structural steel assembly/fabrication. at time of inspection on an active jobsite of a 6 story building, observed that steel wasassembled/modified/connected/perfurated and installed on site, holes c
Sep 7, 2018 · Penalty $625
Resolve - Class - 1
Work does not conform to approved plans/drawings(sidewalk shed) at time of inspection on an active jobsite of a 6 story building, observed that sidewalk shed at exposure#1 not built as per approved drawings, mi
Sep 7, 2018 · Penalty $250
Resolve - Class - 1
3314.3 failure to inspect scaffold before each use. (10) story new building under construction at 6th fl level, active job site. i observed scaffold was not being maintained. there was loose planks w/ debris on
Sep 7, 2018 · Penalty $2,500
Resolve - Class - 1
Bc-3309.1 failure to provide overhead protection. 6 story new buildingunder construction at 6th fl level, active job site. i observed there was no overhead protection, in exposure 1, between the fence and the b
Sep 7, 2018
Resolve - Class - 1
Work contrary to approved plans/design drawings(needle beams) at time of inspection on an active jobsite of a 6 story building, observed needle beams installed on the 4 fl expanding approx 8ft at each side of t
Sep 7, 2018 · Penalty $625
Resolve - Class - 1
Work does not conform to approved plans/design drawings(steel) at timeof inspection on an active jobsite of a 6 story building, observed that steel connections throughout jobsite do not match approved drawings
Sep 7, 2018 · Penalty $625
Resolve - Class - 1
Construction super daily inspection log book. at time of inspection onan active jobsite of a 6 story building, upon request to see daily logbook, observed that construction super umut uyar#0027023 was not prese
Sep 7, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to post no smoking signs at const sites as per fire code. at the time of my inspection an active proposed 6 sty nb 6th sty work in progress. observed posted no no smoking signs any where at site as per
Aug 6, 2018
Resolve - Class - 1
Sec. 3303.9 failure to maintain required means of egress during construction. at the time of my inspection an active,proposed 6 sty nb 6 floor work in progress. observed approx 10 workers working 5th fl where
Aug 6, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures-no guardrails. at the time of my inspection on active,proposed 6 sty nb 6th fl work in progress. observed guardrails are missing at various location at 6
Aug 6, 2018 · Penalty $2,500
Resolve - Class - 1
Sec: 1905.6.3.3.2, 1905.6.3.2. failure to comply w/ astm c31 standards for concrete cylinder test samples. as noted: @ time of insp on an active construction site. observed 2 cylinders dates 4/12/18 & 4/13/18 @
Jul 3, 2018
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary constructor-no handrails. as noted: at time of inspection,active site 3rd fl level i observed the staircase from 2nd to 3rd fl & 2 staircases
Jun 6, 2018 · Penalty $2,500
Resolve - Class - 2
Sec. 3301.7 failure to provide pe aproved design drawings. as noted: at time of inspection,active site reached 3rd fl i observed(puley) system installed at exp#1,3rd fl & attached to steel beam at 3rd fl level
Jun 6, 2018 · Penalty $625
Resolve - Class - 1
Bc3301.13.1/failure to provide site safety plans by local law of 2017 as required.at time of inspection of a new 6 story building under constrution at 2nf flr level,active jobsite,upon request for the sites,sit
Apr 26, 2018 · Penalty $625
Resolve - Class - 1
Construction superintendent failed to perform duties per rule:the following hazardous,conditions and swo was observed on this date(1)inadequate housekeeping 2)failure to safeguard all persons and property affec
Mar 29, 2018 · Penalty $2,500
Resolve - Class - 1
Bc3314.4.5.2.:scaffold user cards:at time of my inspectio in response to 311 complaint #3643976.i observed 3 masonary workers performing masonary operations on pipe scaffolding at exp4-scaffold was approx 6ft h
Mar 29, 2018 · Penalty $625
Resolve - Class - 1
Failure to safeguard all persons and property.at time of inspection in response to complaint #3643976 that was submitted by the public for workers working unsafe and could fall.i observed 2 masonary workers on
Mar 29, 2018 · Penalty $10,000
Resolve - Class - 1
Housekeeping:at time of inspection of a 6 sty new bldg currently at first sty level w/construction operations in progress,i observed garbage cans overfilled,piled up brick debris,at bsmt level and 1st fl and st
Mar 29, 2018 · Penalty $625
Resolve