roofy

Violations at 880 Lorimer Street

Brooklyn, NY 11222 · BBL 3-02679-0057 · Back to the property

HPD housing violations

38 HPD violations, newest first.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Remove device preventing door from being self-closing kickstand at vestibule door at 1st story , 1st story

    Nov 18, 2025

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2024

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 10, 2024

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 23, 2023

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 10, 2022

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 25, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 25, 2022

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 9, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2021

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 30, 2019

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 25, 2018

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 25, 2018

    Open — Nov sent out
  • BHazardous

    Arrange and make self-closing the doors at front entrance located at apt 1l, 1st story, 1st apartment from east at south

    Oct 25, 2018 · Apt 1L

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south

    Oct 25, 2018 · Apt 1L

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair the broken or defective shut off valves at the hot and cold water supply lines at the wash basin in the bathroom located at apt 1l, 1st story, 1st apartment from west at north

    Aug 14, 2015 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective the mechanical ventilator in the bathroom located at apt 1l, 1st story, 1st apartment from west at north

    Aug 14, 2015 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tiles on the east wall in the bathroom located at apt 1l, 1st story, 1st apartment from west at north

    Aug 14, 2015 · Apt 1L

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair the broken or defective counter balance of the lower sash at east 1 window in the kitchen located at apt 1l, 1st story, 1st apartment from west at north

    Aug 14, 2015 · Apt 1L

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the north and south walls in the kitchen located at apt 1l, 1st story, 1st apartment from west at north

    Aug 14, 2015 · Apt 1L

    Open — Nov sent out
  • ANon-hazardous

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the north wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north

    Aug 14, 2015 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from west at north

    Aug 14, 2015 · Apt 1L

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the kitchen located at apt 1l, 1st story, 1st apartment from west at north

    Oct 20, 2014 · Apt 1L

    Open — False certification
  • ANon-hazardous

    Properly repair with similar material the broken or defective porcelain glaze enamel finish at wash basin in the bathroom located at apt 1l, 1st story, 1st apartment from west at north

    Oct 20, 2014 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1l, 1st story, 1st apartment from west at north

    Apr 12, 2014 · Apt 1L

    Closed — Violation closed
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum watts required , light fixture present

    May 29, 2013

    Open — Nov certified late
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st base cabinet from south at west wall, ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    Feb 3, 2009 · Apt 1L

    Open — Nov certified late
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east, the 3rd room from east located at apt 1l, 1st story, 1st apartment from west at north

    Jun 6, 2007 · Apt 1L

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from west at north

    Jun 6, 2007 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective glass pane at upper sash of west-2 window in the 3rd room from east located at apt 1l, 1st story, 1st apartment from west at north

    Jun 6, 2007 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin bed bugs in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Jun 6, 2007 · Apt 1L

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from north at east wall, 1st door from east at south wall, 1st door frame from east at south wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north

    Jun 6, 2007 · Apt 1L

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jun 21, 2005

    Open — Nov sent out
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1l, 1st story, 2nd apartment from west at north

    Jun 21, 2005 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts minimum required

    May 13, 1999

    Open — Nov certified late
  • BHazardous

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination ceiling 1 sty vestibule public hall.

    Jan 6, 1992

    Open — Nov sent out
  • BHazardous

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination ceiling 1 sty public hall.

    Jan 6, 1992

    Open — Nov sent out

DOB building violations

1 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 14, 2016

    Dob violation - dismissed

ECB violations

4 ECB violations, newest first.

  • Class - 1

    3314.8.1/pswo failure to have built according to code specification.note:at time of inspection i observed supported scaffold at exposure #1 guard railsystem not in place.2)pins missing from out riggins.3)all pl

    Sep 13, 2016 · Penalty $1,630

    Resolve
  • Hazardous

    Plumbing work without a permit found a washing machine installed in cellar without a permit being issued remedy: obtain a permit if feasible or restore to prior legal condition

    May 16, 2003 · Penalty $800

    Active
  • Hazardous

    Work without permit. noted: at cellar level, partitions erected to create 1 bed room & 3 piece bathroom. full electrical & plumbing services noted. remedy: obtain permit or restore to prior legal condition.

    Dec 27, 2002 · Penalty $800

    Active
  • Hazardous

    Occupancy contrary to building dept records. noted: cellar to be legally used for storage and boiler room. at time of inspection 1 bedroom observed also 3 piece bathroom, kitchen area, refrigerator, no cooking

    Dec 27, 2002 · Penalty $800

    Active