Violations at 563 Manhattan Avenue
Brooklyn, NY 11222 · BBL 3-02679-0032 · Back to the property
HPD housing violations
The newest 50 of 60 HPD violations. The city keeps the complete history.
- BHazardous
Properly repair the source and abate the evidence of a water leak at the south wall in the 1st room from east at north located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, south, east, and north walls in the 1st room from east at north located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, south, east,and north walls in the 1st room from east at south located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at south located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south and west walls in the 2nd room from east located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the south wall in the bathroom located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective formica counter top at the sink in the kitchen located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 3l, 3rd story, 2nd apartment from east at south
Jul 28, 2026 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective rusted metal sink cabinet in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Jan 31, 2020 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glaze sink by way of re-glazing in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Jan 31, 2020 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective glass panel at vestibule door at public hall, 1st story
Jan 31, 2020
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass pane at entrance door to building at public hall, 1st story
Jan 31, 2020
Open — Nov certified late - BHazardous
Remove all encumbrances consisting of house-hold articles at public hall, 4th story
Jan 31, 2020
Open — Nov certified late - BHazardous
Remove the illegal fastening padlockable device at scutle cover at public hall, 4th story
Jan 31, 2020
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of rodents rats at cellar
Jan 31, 2020
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors in the entrance located at apt 1e, 1st story, 1st apartment from east at south
Oct 15, 2018 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 1e, 1st story, 1st apartment from east at south
Oct 15, 2018 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 1e, 1st story, 1st apartment from east at south
Oct 15, 2018 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east and south wall in the 1st room from east located at apt 1e, 1st story, 1st apartment from east at south
Oct 15, 2018 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1e, 1st story, 1st apartment from east at south
Oct 15, 2018 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north and west wall in the kitchen located at apt 1e, 1st story, 1st apartment from east at south
Oct 15, 2018 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline at washbasin in the bathroom located at apt 1e, 1st story, 1st apartment from east at south
Oct 15, 2018 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 15, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 15, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 15, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 15, 2018
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective light fixture at ceiling in the bathroom located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the entire apartment located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north and east walls in the kitchen located at apt 2l, 2nd story, apartment at north
Apr 3, 2014 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3l, 3rd story, apartment at south
Jan 2, 2014 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3l, 3rd story, apartment at south
Dec 5, 2013 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures ..... in the kitchen located at apt 3l, 3rd story, 1st apartment from east at south
Nov 20, 2013 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Nov 20, 2013 · Apt 3L
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2r, 2nd story, 1st apartment from south at west
Nov 13, 2013 · Apt 2R
Closed — Violation dismissed
DOB building violations
3 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations
4 ECB violations, newest first.
- Class - 2
Sidewalk shed does not meet code specifications-inoperatiave lights.note:lights for sidewalk shed was not working/inoperative.the wiring for lights was not connected to power source,just hanging out of end of c
Aug 6, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no guardrails - noted for pipe scaffold erected or top of sidewalk shed that is under job #32075835j expires 3/28/14 consists
Jun 30, 2013 · Penalty $1,200
Resolve - Class - 1
Erected or installed supported scaffold 40 feet or higher w/o a permitnoted: at exposure 3 of property c-hook suspended scaffold erected at roof level of 40ft ht multiple dwelling. suspended however no permit
Jun 30, 2013
Resolve - Class - 1
Work w/o a permit: noted on 2nd flr apt 3 (2l) the following work has been done: removal of partitions, plumbing fixtures (bowl,sink,tub) kitchen water/waste line and gas line has been removed. dob's records
Jan 23, 2013 · Penalty $1,600
Resolve