905 Lorimer Street
Brooklyn, NY 11222BBL 3-02644-0041Map
Owner of record: Willmington Propertyassoc
905 Lorimer Street is a mixed residential and retail building built in 1931 in Brooklyn, 11222. It has 2 residential units across 2 floors. The owner of record is Willmington Propertyassoc. HPD has recorded 11 housing violations here, most recently on June 1, 2010. 11 of the 11 most recent violations are still open.
- HPD violations
- 11
- DOB violations
- 8
- ECB violations
- 6
- HPD complaints
- 27
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- BHazardous
Repair or replace the smoke detector missing located at apt 2, 2nd story, 1st apartment from east at south
Jun 1, 2010 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story, 11th apartment from east at south
Jun 1, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jun 1, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Jun 1, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jun 1, 2010 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story, 1st apartment from east at south
Jun 1, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyer located at apt 2, 2nd story, 1st apartment from east at south
Jun 1, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Jun 1, 2010 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings, at 2nd story front apt #1f.
Sep 28, 2004
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at kitchen sink, 2nd story front apt #1f.
Sep 28, 2004
Open — Nov sent out
Show 1 more ↓
- BHazardous
Abate the nuisance consisting of east room stairs noted on north wall, 2nd story front apt #1f.
Sep 28, 2004
Open — Nov sent out
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
ECB violations · 6
- Class - 2
Corroded flue pipe, no chimney clean out, manual reset low water cut off missing, wrong piping support. weil-mclain oil burner mod# p-sgo-5, ser#3, 174000 btus,
Sep 20, 2023
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances. noted: at time of inspection, observed at exp#2 above 2nd floor windows mortar has deteriorated and dislodged at parapet level decorative stone has deteriorated.
Mar 9, 2017
Resolve - Non-hazardous
Failure to maintain exterior bldg wall:defects are between 1st + 2nd floor on nassau ave cracked cement work and defective mortar joints.remedy:make all necessary repairs forthwith.
Jan 11, 1996
Resolve - Non-hazardous
Failure to maintain exterior building wall defect is: spalling concrete at various locations. eroded mortar joints at varios locations. remedy: repair defective exterior building wall.
Jun 17, 1994 · Penalty $435
Resolve - Non-hazardous
Failure to maintain exterior building wall. defect is: all along 2nd floor form top of windows to parapet wall brick work is cracked and unkeyed. remedy:repair all defects to the satisfactory of this departmen
Apr 30, 1993 · Penalty $350
Resolve - Non-hazardous
Wiring exposed at oil burner.
May 3, 1989
Resolve
Complaints
- Heat/hot water
Entire building
Mar 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 2F
Close - Electric
Power outage
Dec 22, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 13, 2015 · Apt 1FRONT
Close - Plumbing
Water-leaks
Apr 28, 2010 · Apt 2
Close - Plumbing
Water-leaks
Apr 28, 2010 · Apt 2
Close
Show 17 more ↓
- Plumbing
Water-leaks
Apr 28, 2010 · Apt 2
Close - General
Mold
Apr 28, 2010 · Apt 2
Close - General
Mold
Apr 28, 2010 · Apt 2
Close - Plumbing
Water-leaks
Apr 28, 2010 · Apt 2
Close - Nonconst
Smoke detector
Apr 28, 2010 · Apt 2
Close - General
Locks
Apr 28, 2010 · Apt 2
Close - Nonconst
Vermin
Apr 28, 2010 · Apt 2
Close - Nonconst
Vermin
Apr 28, 2010 · Apt 2
Close - General
Floor
Apr 28, 2010 · Apt 2
Close - Plumbing
Bathtub/shower
Apr 28, 2010 · Apt 2
Close - Heating
Heat related
Apr 28, 2010 · Apt 2
Close - Heating
Heat related
Mar 14, 2010 · Apt 2
Close - General
Locks
Mar 14, 2010 · Apt 2
Close - Heating
Heat related
Sep 20, 2009 · Apt 2
Close - Heating
Heat related
Mar 8, 2007 · Apt 2
Close - Heating
Heat related
Mar 7, 2006 · Apt 2
Close - Heating
Heat related
Feb 14, 2005 · Apt 02
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1931
- Floors
- 2
- Residential units
- 2
- Building area
- 3,000 ft²
- Lot area
- 1,500 ft²
- Zoning
- M1-2/R6
- Community board
- 301
- Council district
- 33
- Block / lot
- 2644 / 41
- Assessed value
- $167,160
- Landmark / historic district
- No
Questions about 905 Lorimer Street
Who owns 905 Lorimer Street?
The owner of record in NYC Department of City Planning PLUTO data is Willmington Propertyassoc.
Does 905 Lorimer Street have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 905 Lorimer Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 905 Lorimer Street built?
City records list 1931 as the year it was built.
How many apartments are in 905 Lorimer Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.