86 Eagle Street
Brooklyn, NY 11222BBL 3-02504-0014Map
Owner of record: 86 Egale Street LLC
86 Eagle Street is a walk-up apartment building built in 1930 in Brooklyn, 11222. It has 3 residential units across 3 floors. The owner of record is 86 Egale Street LLC. HPD has recorded 59 housing violations here, most recently on April 9, 2024. 45 of the 50 most recent violations are still open.
- HPD violations
- 59
- DOB violations
- 0
- ECB violations
- 10
- HPD complaints
- 89
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 59
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective 8th tread from bottom up at public hall stairs, 1st story
Aug 28, 2022
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Aug 28, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Aug 28, 2022 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Aug 28, 2022 · Apt 2
Open — Nov sent out - ANon-hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Aug 28, 2022 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective window counterbalance lower sash at south wall in the 4th room from north at east located at apt 2, 2nd story, 1st apartment from south at west
Aug 28, 2022 · Apt 2
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall stairs, 1st story
Aug 28, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall stairs, 1st story
Aug 28, 2022
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall stairs, 1st story
Aug 28, 2022
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall stairs, 1st story
Aug 28, 2022
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 28, 2022
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors at entrance at public hall, 1st story
Mar 25, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missed at public hall, 1st story
Mar 25, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 29, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Mar 29, 2018
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at west wall at public hall, 1st story
Mar 29, 2018
Open — Invalid certification - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 8, 2015
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles , cabinets, ac's & household articles, blocking floor and 3rd story apartment exit door at public hall, 3rd story
May 21, 2014
Open — Nov sent out - BHazardous
Provide fire retardant cement seal around flue pipes at chimney breaching at cellar
Mar 26, 2014
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycle chained to newel post at public hall stairs, 1st story
Mar 26, 2014
Open — Not complied with - BHazardous
Remove all encumbrances consisting of bicycles , cabinets, ac's & household articles, blocking scuttle ladder and hanging over stairs from balustrade at public hall, 3rd story
Mar 26, 2014
Closed — Violation dismissed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor of rubbish and discarded pipes and boiler sections from previous boiler removal at cellar
Mar 26, 2014
Open — First no access to re- inspect violation - BHazardous
Arrange and make self-closing the doors at building entrance , 1st story
Oct 7, 2011
Open — Nov sent out - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building rear at fire escape
Oct 7, 2011
Open — Nov sent out - BHazardous
Properly secure the loose hinges at street entrance door , 1st story
Sep 14, 2011
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 4, 2011 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 1st room from north located at apt 1, 1st story, 1st apartment from north at east
Aug 4, 2011 · Apt 1
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of house hold items, blocking scuttle ladder at public hall, 3rd story
Aug 4, 2011
Open — Nov sent out - BHazardous
Properly repair the broken or defective mortise lock and strike plate at vestibule door , 1st story
Aug 4, 2011
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass at lower sash west window at public hall, 3rd story
Jan 24, 2011
Open — Nov certified late - ANon-hazardous
Refit entrance door at lobby, 1st story
Jan 24, 2011
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household items at cellar
Jan 24, 2011
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin termites yard
Aug 30, 2010
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Feb 10, 2005
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 3, 3rd story
Aug 6, 2003 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sheetrock ceiling in the kitchen located at apt 3, 3rd story
Aug 6, 2003 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 3, 3rd story
Aug 6, 2003 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plaster board ceiling bathroom 3 sty apt 3 , section '' ''
Mar 30, 1992 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal ceiling kitchen 3 sty apt 3 , section '' ''
Mar 30, 1992 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over 3 sty apt 3 , section '' ''
Mar 30, 1992 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling front room and 2nd room from front 3 sty apt 3 , section '' ''
Mar 30, 1992 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain washbasin bathroom 3 sty apt 3 , section '' ''
Mar 30, 1992 · Apt 3
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the drain kitchen sink 3 sty apt 3 , section '' ''
Mar 30, 1992 · Apt 3
Open — Nov sent out - BHazardous
D26-10.01 adm code replace with new the broken or defective marble saddle entrance street to vestibule 1 sty pub hall.
May 5, 1987
Open — Nov sent out - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling 3 sty apt bathroom.
Aug 19, 1986
Open — Nov sent out - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls & ceilings 3 sty apt southeast room & center east room.
Aug 19, 1986
Open — Nov sent out - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective metal ceiling 3 sty apt kitchen.
Aug 19, 1986
Open — Nov sent out - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective floor tile base of water closet 3 sty apt bathroom.
Aug 19, 1986
Open — Nov sent out - BHazardous
D26-10.01 adm code properly repair the broken or defective door bell & buzzer to 3 sty apt.
Aug 19, 1986
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 10
- Hazardous
Exit passageway total obstruction. note: gate/door at the front of thepassageway leading to/from the rear of the building is chained and padlocked blocking the exit from the building in case of an emergency
Apr 26, 2008 · Penalty $480
Active - Hazardous
Exit passageway or corridor total obstruction noted: passageway at side of bldg leading from the front to the rear & means of egress in the event of an emergency is blocked. metal door at the front of entrance
Apr 10, 2008 · Penalty $1,200
Active - Hazardous
Exit passageway total obstruction noted: gate on the right side at thefront of the property is chained and padlocked blocking the flow of e gress in case of an emergency. a dangerous condition now exists in tha
Mar 22, 2008
Resolve - Hazardous
Exit passageway total obstruction noted: the passageway on the right side of the property that allows exit from the rear is totally obstucted through the chaining and padlocking of the gate/door at the front of
Mar 22, 2008 · Penalty $400
Active - Non-hazardous
Exit passageway or corridor total obstruction noted:gate door of bldg is chained & padlocked blocking occupants egress from rear of bldg to saftey exit through front gate in case of fire emergency thus putting
Nov 21, 2007 · Penalty $480
Active - Hazardous
Exit passageway total obstruction. noted: the right of main entrance to dwelling passageway from rear yard is totally obstructed by door w/ chain & padlock, stopping entrance from rear yard. remedy: remove
Oct 13, 2007 · Penalty $480
Active - Hazardous
Exit passageway:total obstruction.noted:fence at right side yard is changed & padlocked blocking flow of egress in case of fire creating dangerous condition for bldg occupants.remedy:remove obstruction.
Oct 10, 2007 · Penalty $1,200
Active - Non-hazardous
Exit passageway: total obstruction. accumulation of rubbish approx 3'wx 10'l x 3'h including pvc pipes, wood boads & household trash being stored at side yard of bldg. premises creating dangerous condition for
Jul 25, 2007 · Penalty $480
Active - Hazardous
Exit passageway or corridor total obstruction: noted 3 story brick/frame bldg fire escape at rear of bldg obstructed with clothes hanging on drop ladder shoe.fire exit passageway on left side leading to street
Jul 3, 2007 · Penalty $350
Active - Non-hazardous
Bq950/21b bq9-no permit for oil burner (16a approval)new burner 50-missing shut off value on the oil line at the oil burner
Jun 11, 2005 · Penalty $500
Active
Complaints
- Plumbing
Bathtub/shower
Jun 20, 2025 · Apt 2
Close - Plumbing
Basin/sink
Jun 20, 2025 · Apt 2
Close - Electric
Power outage
Dec 20, 2022 · Apt 2
Close - Door/window
Door
Aug 24, 2022 · Apt BLDG
Close - Safety
Smoke detector
Aug 24, 2022 · Apt 2
Close - Safety
Carbon monoxide detector
Aug 24, 2022 · Apt 2
Close - Heat/hot water
Apartment only
Aug 24, 2022 · Apt 2
Close - Electric
No lighting
May 11, 2022 · Apt 2
Close - Paint/plaster
Wall
May 11, 2022 · Apt 2
Close - Door/window
Door
May 11, 2022 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Mold
May 11, 2022 · Apt 2
Close - Flooring/stairs
Stairs
May 11, 2022 · Apt 2
Close - Flooring/stairs
Stairs
May 11, 2022 · Apt 2
Close - Flooring/stairs
Stairs
May 11, 2022 · Apt 2
Close - Door/window
Door
Dec 22, 2021 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 16, 2018 · Apt 1
Close - Door/window
Window frame
Nov 22, 2016 · Apt 3
Close - Safety
Carbon monoxide detector
Nov 22, 2016 · Apt 3
Close - Heat/hot water
Apartment only
Nov 22, 2016 · Apt 3
Close - Door/window
Window pane
Oct 31, 2014 · Apt 2
Close - Unsanitary condition
Pests
Oct 31, 2014 · Apt 2
Close - Water leak
Heavy flow
Sep 2, 2014 · Apt 1
Close - Paint/plaster
Ceiling
Sep 2, 2014 · Apt 1
Close - Unsanitary condition
Pests
Mar 21, 2014 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Mar 21, 2014 · Apt BLDG
Close - Safety
Carbon monoxide detector
Mar 21, 2014 · Apt 3R
Close - Paint/plaster
Wall
Mar 21, 2014 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Mar 21, 2014 · Apt BLDG
Close - Heating
Heat related
Oct 6, 2011 · Apt 1
Close - General
Locks
Oct 5, 2011 · Apt 1
Close - General
Doors
Oct 5, 2011 · Apt 1
Close - Heating
Heat related
Oct 5, 2011 · Apt 1
Close - General
Doors
Sep 11, 2011 · Apt 1
Close - General
Doors
Sep 11, 2011 · Apt 1
Close - Plumbing
Water-leaks
Sep 11, 2011 · Apt 1
Close - General
Doors
Jul 28, 2011 · Apt 3
Close - Nonconst
Rubbish
Jul 28, 2011 · Apt 3
Close - General
Doors
Jul 28, 2011 · Apt 3
Close - Construction
Rain leader
Jul 28, 2011 · Apt 3
Close - Nonconst
Vermin
Jul 28, 2011 · Apt 3
Close - Nonconst
Vermin
Jul 28, 2011 · Apt 3
Close - Paint/plaster
Ceiling
Jul 28, 2011 · Apt 1
Close - Paint/plaster
Ceiling
Jul 28, 2011 · Apt 1
Close - Plumbing
Water-leaks
Jul 28, 2011 · Apt 1
Close - Plumbing
Shower-stall
Jul 28, 2011 · Apt 1
Close - General
Locks
Jul 28, 2011 · Apt 3
Close - Plumbing
Basin/sink
Jul 28, 2011 · Apt 1
Close - Plumbing
Basin/sink
Jul 28, 2011 · Apt 1
Close - General
Windows
Jan 3, 2011 · Apt 2
Close - Nonconst
Vermin
Jan 3, 2011 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1930
- Floors
- 3
- Residential units
- 3
- Building area
- 3,200 ft²
- Lot area
- 2,395 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 33
- Block / lot
- 2504 / 14
- Assessed value
- $235,980
- Landmark / historic district
- No
HPD registration #310535, last renewed Jul 18, 2025.
Questions about 86 Eagle Street
Who owns 86 Eagle Street?
The owner of record in NYC Department of City Planning PLUTO data is 86 Egale Street LLC.
Does 86 Eagle Street have violations?
Yes. NYC HPD has recorded 59 housing violations at this property.
Is 86 Eagle Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 86 Eagle Street built?
City records list 1930 as the year it was built.
How many apartments are in 86 Eagle Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.