74 South 2nd Street
Brooklyn, NY 11249BBL 3-02416-0008Map
Owner of record: 74-76 South 2nd St LLC
74 South 2nd Street is an one-family home built in 2019 in Brooklyn, 11249. It has 1 residential unit across 4 floors. The owner of record is 74-76 South 2nd St LLC. HPD has recorded 4 housing violations here, most recently on December 4, 2012.
- HPD violations
- 4
- DOB violations
- 2
- ECB violations
- 24
- HPD complaints
- 20
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the kitchen located at apt 1fl, 1st story
Dec 4, 2012 · Apt 1FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls throughout in the 2nd room from north at east located at apt 1fl, 1st story
Dec 4, 2012 · Apt 1FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1fl, 1st story
Dec 4, 2012 · Apt 1FL
Closed — Violation closed - BHazardous
Replace with new the missing ceiling light fixture at public hall, 1st story
Dec 4, 2012
Closed — Violation closed
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2020
Dob violation - dismissed
ECB violations · 24
- Class - 1
Unlawfully contd work while on notice of swo atoi on proposed 4stynb site w/aprx10workers onsite.upon rev in bis i observed partial swo under complaint3820555 stating no use of storage [email protected] reviewing
Jan 24, 2022 · Penalty $2,500
Resolve - Class - 2
Bc3303.1 failure to maintain storage zone as per code.at time of inspection on nb site with aprox 5 workers on site observed debris containeer at exp #1 storage zone not covered and debris was filled past top(r
Nov 3, 2021
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp const-no guardrails.atoi nb site w/aprx5workers onsite,i observed missing guardrails@several locations thruout site.guardrails missing entirely ar
Nov 3, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to designate and or have a construction superintendent at jobssite.at time of inspection of 4 stories new building active job site cp on site upon request superintendent logs observed no superintendent
Apr 20, 2021
Resolve - Class - 1
Bc3301.2 failure to maintain adequate safety strap insp log&installation log.noted:atoi of active const site observed embedded safety strapsin flslab3,4,5/roof on enquiring of installation logs of embedded safe
Mar 30, 2021
Resolve - Class - 2
28-105.12 condition of new building permit.noted at time of inspectionfor an active construction site at bulk head level,observed building constructed up to bulk head level as concrete casting in place.not conf
Mar 30, 2021
Resolve - Class - 2
28-105.12 condition of new building permit.noted at time of inspectionfor an active construction site at bulk head level,observed building constructed up to bulk head as concrete cast in place.not conform to ne
Mar 30, 2021
Resolve - Class - 1
3301.7 failure to provide approved pe details for steel staircase.noted at time of inspection for an active construction site 4 story building observed steel staircase constructed up to roof level.however no de
Mar 30, 2021 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction drawing.noted at time of inspection on active construction site 4 story building at bulk headlevel,observed post steel at roof level constructed to support bulk he
Mar 30, 2021
Resolve - Class - 2
Work does not conform to approved construction drawing.noted at time of inspection for an active construction site 4 story at bulk head level,observed steel post columns support the concrete roof slab.however,
Mar 30, 2021
Resolve
Show 14 more ↓
- Class - 1
3301.7 failure to provide approved pe details for steel staircase.noted at time of inspection for an active construction site 4 story building,observed steel staircase constructed up to roof level.however,no de
Mar 30, 2021 · Penalty $625
Resolve - Class - 1
Bc3301.2 failure to maintain adequate safety strap installation log.noted:atoi of active const site observed embedded safety straps in flslab3,4,5/roof.on enquiring of installation logs of embedded safety strap
Mar 30, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specifications at time of inspection on a proposed 4 story new building with a height of 55ft observed a missing sidewalk shed because it was temporary removed due to se
Jan 28, 2021 · Penalty $2,400
Resolve - Class - 2
Sec. 3307.1 failure to comply w/dot stipulations. at the time of inspection of 4 sty new bldg construction site observed 2 workers on site as well as 2 workers outside. at exp#1 w/roadway construction & waterma
Jan 28, 2021 · Penalty $620
Resolve - Class - 1
Housekeeping. at the time of inspection of 4 sty bldg construction site w/2 workers inside observed construction debri around perimeter of the site & inside. the bldg including tools,materials,foams,rebars expo
Jan 28, 2021 · Penalty $625
Resolve - Class - 1
Housekeeping. at the time of inspection of 4 sty new bldg constructionsite w/2 workers inside observed construction debri around the perimeter & inside the bldg,tools,materials,exposed rebar,chipped concrete,sh
Jan 28, 2021 · Penalty $625
Resolve - Class - 2
Sec. 3307.1 failure to comply w/dot stipulations. at the time of inspection of 4 sty new bldg construction site. observed 2 workers on site & 2 workers outside at exp#1 w/roadway construction & watermain/utilit
Jan 28, 2021 · Penalty $620
Resolve - Class - 2
3301.6.1-no drawing for the platform used as ohp at exp #1 at the time of inspection of a 4 story nb i observed a temporary platform exp #1 used as ohp for workers or anyone authorized to come into the site upo
Nov 12, 2020 · Penalty $620
Resolve - Class - 2
Failure to maintain display on site documents required by chapter 33 no sws or scaffold plan on site at the time of my inspection of a 4 story nb i observed sidewalk shed at exp #1 and scaffold at exp #4 the he
Nov 12, 2020 · Penalty $625
Resolve - Class - 2
Work not conforming to site safety plan at the time of my inspection of a 4 story nb observed scaffold at exp # 4 and material storage at exp #1 infront of adjacent property 317 whythe ave and no indication or
Nov 12, 2020 · Penalty $620
Resolve - Class - 1
Failure to safeguard public and property. in response to accident under complaint #3730163 where i observed damage to adjacent property at exp #2 rubble foundation wall. contractor has failed to maintain safety
Nov 15, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to notity the department prior to the commencement of earthwork. at time of inspection of a 4 story nb currently at excavation stage upon review of the department records respondent has failed to notify
Nov 15, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to immediately notify department of an accident or damage to adjoing property. in response to accident under complaint #3730163 where i observed damage to adjacent property at exp #2 rubble foundation w
Nov 15, 2019 · Penalty $5,000
Resolve - Class - 1
Work does not meet conform to approved const documents and/or approvedamendments. note:@the time of inspection const work in progress, i observed that pile foundations were not drilled/intalled @exp2 rear as
Sep 26, 2019 · Penalty $1,250
Resolve
Complaints
- Heating
Heat related
Nov 30, 2012 · Apt NA
Close - Heating
Heat related
Nov 29, 2012 · Apt NA
Close - General
Mold
Nov 26, 2012 · Apt 1FL
Close - General
Mold
Nov 26, 2012 · Apt 1FL
Close - General
Floor
Nov 26, 2012 · Apt 1FL
Close - Paint/plaster
Wall
Nov 26, 2012 · Apt 1FL
Close - Paint/plaster
Wall
Nov 26, 2012 · Apt 1FL
Close - Paint/plaster
Wall
Nov 26, 2012 · Apt 1FL
Close - Nonconst
Vermin
Nov 26, 2012 · Apt 1FL
Close - Paint/plaster
Wall
Nov 26, 2012 · Apt 1FL
Close
Show 10 more ↓
- General
Mold
Nov 26, 2012 · Apt 1FL
Close - General
Mold
Nov 26, 2012 · Apt 1FL
Close - Plumbing
Water-leaks
Nov 26, 2012 · Apt 1FL
Close - Electric
Lighting
Nov 26, 2012 · Apt 1FL
Close - General
Mold
Nov 26, 2012 · Apt 1FL
Close - Paint/plaster
Wall
Nov 26, 2012 · Apt 1FL
Close - Heating
Heat related
Nov 26, 2012 · Apt 1FL
Close - Heating
Heat related
Apr 3, 2008 · Apt 2
Close - Heating
Heat related
Apr 2, 2008 · Apt 2
Close - Heating
Heat related
Mar 4, 2008 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A5)
- Year built
- 2019
- Floors
- 4
- Residential units
- 1
- Building area
- 2,939 ft²
- Lot area
- 1,264 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2416 / 8
- Assessed value
- $106,560
- Landmark / historic district
- No
Questions about 74 South 2nd Street
Who owns 74 South 2nd Street?
The owner of record in NYC Department of City Planning PLUTO data is 74-76 South 2nd St LLC.
Does 74 South 2nd Street have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 74 South 2nd Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 74 South 2nd Street built?
City records list 2019 as the year it was built.
How many apartments are in 74 South 2nd Street?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.