roofy

95 South 2 Street

Brooklyn, NY 11249BBL 3-02404-0035Map

Owner of record: South 2nd Residence LLC

95 South 2 Street is a walk-up apartment building built in 1910 in Brooklyn, 11249. It has 8 residential units across 4 floors. The owner of record is South 2nd Residence LLC. HPD has recorded 44 housing violations here, most recently on June 30, 2025. 4 of the 44 most recent violations are still open.

HPD violations
44
DOB violations
8
ECB violations
4
HPD complaints
102

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jun 30, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 44

  • A

    Paint or post a sign indicating floors ..... at public hall

    Jun 30, 2025

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at building front , 1st story

    Jun 6, 2025

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing kick down door stop at building entrance door , 1st story

    Jun 6, 2025

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jun 6, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 6, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    May 12, 2025 · Apt 1R

    Closed — Violation closed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall

    Apr 17, 2025

    Closed — Violation closed
  • C

    Provide a safe and adequate supply of electric service to the fixtures electrical fixtures at ceiling at all stories at public hall

    Apr 16, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Feb 21, 2025

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Feb 21, 2025

    Closed — Violation closed
Show 34 more ↓
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Feb 21, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Feb 21, 2025

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Feb 21, 2025

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 11, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 24, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 2, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 13, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 13, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 31, 2019

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of rodents rats at front yard

    Mar 25, 2019

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 19, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2017

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, apartment at west

    Jun 10, 2017 · Apt 1L

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 10, 2017

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 10, 2017

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures no cooking gas to gas range in kitchen in the kitchen located at apt 1l, 1st story, apartment at west

    Jun 10, 2017 · Apt 1L

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 14, 2015

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 24, 2015

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the 3rd room from north located at apt 3r, 3rd story, apartment at east

    Jan 15, 2013 · Apt 3R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north located at apt 3r, 3rd story, apartment at east

    Jan 15, 2013 · Apt 3R

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from north located at apt 3r, 3rd story, apartment at east

    Jan 15, 2013 · Apt 3R

    Closed — Violation dismissed
  • A

    Refit the window in the kitchen located at apt 3r, 3rd story, apartment at east

    Jan 15, 2013 · Apt 3R

    Closed — Violation dismissed
  • B

    Replace with new the missing upper and lower window sashes in the 3rd room from north located at apt 4r, 4th story, 1st apartment from north at east

    Aug 15, 2009 · Apt 4R

    Closed — Violation dismissed
  • B

    Replace with new the missing upper and lower window sashes in the 4th room from north located at apt 4r, 4th story, 1st apartment from north at east

    Aug 15, 2009 · Apt 4R

    Closed — Violation dismissed
  • B

    Replace with new the missing window sashes upper and lower in the 4th room from east at south located at apt 4r, 4th story, apartment at east

    Jul 14, 2009 · Apt 4R

    Closed — Violation dismissed
  • B

    Replace with new the missing window sashes upper and lower in the 2nd room from east at south located at apt 4r, 4th story, apartment at east

    Jul 14, 2009 · Apt 4R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceilings and walls in the entire apartment located at apt 4l, 4th story, 1st apartment from south at west

    Oct 16, 2006 · Apt 4L

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective ceiling light fixture in the 2nd room from north located at apt 4l, 4th story, 1st apartment from south at west

    Oct 16, 2006 · Apt 4L

    Closed — Violation dismissed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint ceiling 1 sty west apt 1c kitchen rodriguez 782 6164 er1. , section '' ''

    Jan 23, 1990 · Apt 1C

    Open — Defect letter issued
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall & on boiler room door.

    Jun 20, 1989

    Open — False certification
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling 2 sty west apt 2l front room. , section '' ''

    Jan 13, 1987 · Apt 2L

    Closed — Violation dismissed
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department wall and ceilings thru out 2 sty west apt 2l. located at apt 2l

    Jan 24, 1984 · Apt 2L

    Closed — Violation dismissed
  • B

    D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls front room 2 sty west apt 2l. located at apt 2l

    Jan 24, 1984 · Apt 2L

    Closed — Violation dismissed

DOB building violations · 8

  • Construction other optional

    Stop all work immediately,make site safe,provide approved plans

    Apr 27, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Nov 17, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 18, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 27, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed

ECB violations · 4

  • Class - 3

    Work w/o a permit. work noted: 2 windows installed on the east wall at 4th fl level w/o 1st obtaining a permit. remedy: obtain permit & approvals if feasible or restore premises to prior legal condition.

    Jun 17, 2010

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. noted: at time of inspection the entire rear yard is full w/constructiondebris & dust observed on the adjacent bldg. also at the front of the

    Mar 6, 2009

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by construction operations. noted: work done under appl #310164265 with windows being removed at each flr at east exterior wall and broken pc of glass and

    Aug 7, 2008

    Resolve
  • Non-hazardous

    Boiler not registered. manual reset missing. wiring not up to code.

    Sep 14, 1989 · Penalty $150

    Resolve

Complaints

  • Water leak

    Heavy flow

    Aug 10, 2026 · Apt 1R

    Close
  • Electric

    Power outage

    Apr 17, 2025 · Apt 3L

    Close
  • Electric

    Power outage

    Apr 16, 2025 · Apt 3L

    Close
  • Electric

    No lighting

    Apr 16, 2025 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Sep 5, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 28, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Sep 2, 2021 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Mar 20, 2019 · Apt FRONT

    Close
  • Water leak

    Heavy flow

    Nov 17, 2018 · Apt 3R

    Close
  • General

    Cooking gas

    Jun 8, 2017 · Apt 1L

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jun 8, 2017 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    May 31, 2017 · Apt 3L

    Close
  • General

    Cooking gas

    May 31, 2017 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    May 31, 2017 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Jan 23, 2017 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jan 23, 2017 · Apt BLDG

    Close
  • General

    Ventilation system

    Jan 23, 2017 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jan 23, 2017 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jun 16, 2014 · Apt 1R

    Close
  • Nonconst

    Vermin

    Nov 18, 2013 · Apt 1LHH

    Close
  • Nonconst

    Vermin

    Nov 18, 2013 · Apt 1LHH

    Close
  • Nonconst

    Vermin

    Nov 18, 2013 · Apt 1LHH

    Close
  • Electric

    Wiring

    Aug 6, 2013 · Apt 1LHH

    Close
  • Nonconst

    Vermin

    Aug 6, 2013 · Apt 1LHH

    Close
  • Nonconst

    Rubbish

    Jun 25, 2013 · Apt 1LHH

    Close
  • Nonconst

    Rubbish

    Jun 25, 2013 · Apt 1LHH

    Close
  • Electric

    Wiring

    Jun 25, 2013 · Apt 1LHH

    Close
  • Nonconst

    Vermin

    Jun 25, 2013 · Apt 1LHH

    Close
  • General

    Mold

    Jan 14, 2013 · Apt 3R

    Close
  • General

    Mold

    Jan 14, 2013 · Apt 3R

    Close
  • Plumbing

    Water-leaks

    Jan 14, 2013 · Apt 3R

    Close
  • General

    Mold

    Jan 14, 2013 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jan 11, 2013 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Jan 11, 2013 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Jan 11, 2013 · Apt 3R

    Close
  • Plumbing

    Water-leaks

    Jan 11, 2013 · Apt 3R

    Close
  • General

    Mold

    Jan 11, 2013 · Apt 3R

    Close
  • General

    Mold

    Jan 11, 2013 · Apt 3R

    Close
  • General

    Windows

    Aug 6, 2009 · Apt 4R

    Close
  • General

    Windows

    Aug 6, 2009 · Apt 4R

    Close
  • Nonconst

    Smoke detector

    Aug 6, 2009 · Apt 4R

    Close
  • Plumbing

    Water-leaks

    Jul 27, 2009 · Apt 4R

    Close
  • General

    Windows

    Jul 11, 2009 · Apt 4R

    Close
  • Nonconst

    Vermin

    Jul 11, 2009 · Apt 4R

    Close
  • Nonconst

    Vermin

    Jul 11, 2009 · Apt 4R

    Close
  • Nonconst

    Vermin

    Jun 24, 2009 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Jun 24, 2009 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Jun 24, 2009 · Apt 3L

    Close
  • Heating

    Heat related

    Nov 18, 2008 · Apt BLDG

    Close
  • Plumbing

    Water-leaks

    Nov 3, 2008 · Apt 2L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C4)
Year built
1910
Floors
4
Residential units
8
Building area
6,760 ft²
Lot area
2,600 ft²
Zoning
R6
Community board
301
Council district
34
Block / lot
2404 / 35
Assessed value
$1,791,900
Landmark / historic district
No

HPD registration #339645, last renewed Oct 1, 2025.

Questions about 95 South 2 Street

Who owns 95 South 2 Street?

The owner of record in NYC Department of City Planning PLUTO data is South 2nd Residence LLC.

Does 95 South 2 Street have violations?

Yes. NYC HPD has recorded 44 housing violations at this property.

Is 95 South 2 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 95 South 2 Street built?

City records list 1910 as the year it was built.

How many apartments are in 95 South 2 Street?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.