Violations at 156 North 4 Street
Brooklyn · BBL 3-02352-0009 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
The newest 50 of 84 DOB violations. The city keeps the complete history.
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Construction other optional
C-construction other optional
May 29, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2018
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 29, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 11, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 11, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 11, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 17, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 6, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 6, 2001
Dob violation - dismissed - Construction other optional
Ecb hazardous
Sep 6, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 19, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations
24 ECB violations, newest first.
- Class - 1
Sec. 1704.11 failure to file a special inspection statement of responsibility prior to permit issued & prior to start of work under special inspection requirement. at the time of inspection it was observed stru
Feb 28, 2018
Resolve - Class - 2
Sec. 3309.16 failureto monitor adjoining properties for movement at t he time of inspection no optical & crack monitoring observed while performinig demo & underpinning. remedy: monitor adjoining properties/bld
Feb 16, 2018 · Penalty $400
Resolve - Class - 2
Work does not conform to approved construction documents and or approved amendments.premises under alt.#320820000,exp.12/06/14.note at time of insp.found(1)stair 1st fl to cellar noted to remain,removed at site
Jun 4, 2015
Resolve - Class - 2
Expired permit. noted: construction fence in place at above address. fn permit: #302324232, 302219169 expired on 8.3.07 and 1.1.09 and #302219150 - expired on 1.1.09. remedy: renew permit.
Sep 11, 2012
Resolve - Class - 2
Failure to post permit for work at premises. noted: at time of inspection observed no fence permit #302219150 is posted at site fence at time of inspection. remedy: post permit as required per section:28-105.11
Oct 1, 2011
Resolve - Class - 2
Work w/o a perrmit. expired fence permit #302219150 on: 1.1.09. noted:at time of inspection at site observed. fence permit expired in (bic) system on 1.1.09. remedy: renew fence permit as required per code.
Oct 1, 2011 · Penalty $400
Resolve - Class - 2
Failure to provide approved/accepted plans @ jobsite @ the time ofinspection 455pm.found demolition & construction work in progress with no approved plans on site.
Aug 16, 2010 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations currently front exp wood gate swing across public sidewalk at n 4 st. front fence missing additional plywood to be made solid. at
Nov 12, 2008 · Penalty $1,200
Resolve - Non-hazardous
Failure to provide stamped approved plans at time of inspection. noted: plans for job #310047151 in progress @ ground floor space marked "241-c" not on site & available @ time of inspection. remedy: stop all
Jan 15, 2008 · Penalty $130
Resolve - Non-hazardous
Occupancy to that allowed by the bldg dept records. note: dept computer indicate " f9-factory". now full partition walls illegally erected on 1st fl at various locations illegally creating a bar with bathroom s
Oct 20, 2004
Resolve - Non-hazardous
Work without a permit. note. full partition walls illegally erected onfirst floor at various locations creating an illegal bar. also observed new construction work being done in bar such as wood and metal
Oct 20, 2004 · Penalty $500
Resolve - Non-hazardous
Failure to maintain exterior bldg wall. note. front brick facade is crack above roll down gate approx. 1/2" wide. also at south side are missing motar joints at various locations. remedy: maintian exterior bldg
Sep 10, 2004 · Penalty $2,500
Resolve - Hazardous
Failure to protect adjoining structure during excavation operations note excavation work being done approx 3' wide x 4' deep x 25' long nextto adjoining structure of 231 bedford avenue exposing brick foundatio
Aug 25, 2004
Resolve - Hazardous
Failure to post contractors sign note construction work being done under job#301791041 and no contractors sign posted remedy:provide contractor sign forthwith
Aug 25, 2004 · Penalty $250
Resolve - Non-hazardous
Unlawful continuance: note. illegal construction work done on 2nd fl & was stop on 8/06/04 with stop work # 080604c01ah05. on reinsp on 8/17/04 illegal construction work done such as removing full partition wal
Aug 17, 2004
Resolve - Non-hazardous
Failure to post permit. note. illegal construction work being done throughout second fl such as removing full partition walls, new framing, plumbing, electrical & sheetrocking. remedy: post permit.
Aug 6, 2004 · Penalty $130
Resolve - Non-hazardous
Dangerous places & things. note. illegal construction work being done throughout entire second fl such as removing full partition walls, new framing, plumbing, electrical & sheetrocking & no tenanat protection
Aug 6, 2004
Resolve - Hazardous
Work without a permit. hazardous. note. illegal construction work being done throughout entire second fl such as removing full partition walls, new framing, plumbing, electrical & sheetrocking remedy: stop all
Aug 6, 2004 · Penalty $800
Resolve - Hazardous
Altered bldg occupied without a valid cofo noted alt type 1 job application no 301022881 to convert existing factory on 2nd flr to artist in res js now being occupied as artist in residence air without obtainin
Jun 2, 2003 · Penalty $880
Resolve - Non-hazardous
Altered building occupied w/o a valid c / o for job # 301022881 second floor faction space has been subdivided in " artists is residence ' air loft / dwelling space more than 3 spaces noted remedy : obtian a va
Feb 19, 2003 · Penalty $350
Resolve - Non-hazardous
Exit door swing against the flow of egress note at south corridor 2nd floor level a right hunded exit door swings to public hallway
Sep 6, 2001 · Penalty $350
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o #115423 which indicate use as factory at 1st and 2nd fl. noted:2nd fl. is now converted to 4 apt. observed one "a"class apt. consist of 3 pcs. bathroom.bedrooms
Jun 19, 2000 · Penalty $400
Resolve - Non-hazardous
Failure to maintain. defect is: fire stop ceiling missing at various location at first floor. remedy: make all necessary repairs to the satisfaction of this department.
Dec 7, 1999 · Penalty $350
Resolve - Non-hazardous
Work withput permit: at 1st floor (ground level) 2 large frozen food walk-in boxes were installed. remedy: obtain permit if feasible or restore to prior legal condition
Dec 2, 1999 · Penalty $2,500
Resolve