75 North 11 Street
Brooklyn, NY 11249BBL 3-02288-0024Map
Owner of record: Wythehotel LLC
75 North 11 Street is a hotel built in 1901 in Brooklyn, 11249. The owner of record is Wythehotel LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 71
- ECB violations
- 26
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 71
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2018
Mar 18, 2019
Dob violation - dismissed
Show 40 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 17, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 5, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 5, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2018
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2016
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2015
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 1, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
3f2400
Mar 31, 2000
Dob violation - resolved
ECB violations · 26
- Class - 2
Failure to file annual certification that cooling tower 1000003184 hasbeen inspected,tested,and disinfected,and that maintenance plan has been developed and implemented,by november 1,2016.rem:file annual certif
Jun 20, 2017 · Penalty $1,000
Resolve - Class - 1
Bc1004.1.2 failure to comply w/maximum floor area requirements per occupant load.noted:6th floor two hotel rooms:bunk room#601 and bunk room#602 occupied as transient hotel and being occupeid by up to 6 occupan
Jan 15, 2013
Resolve - Class - 1
Bc714.2 failure to provide protection of structural members.noted: on first flr cast iron columns (structural members) do not have fire resistance rating in various location and steel lintels over.wall openings
Jan 15, 2013
Resolve - Class - 1
Bc508.3 failure to provide required fire separation.noted:on first flrplace of assembly at front of bldg open into hotel lobby and into hotel exit discharge from staircase"b".rmdy: provide fire separation to co
Jan 15, 2013
Resolve - Class - 1
Bc1005.1 failure to provide minimum required egress width.noted:on 1stfloor 1 fire exit door approx 3'-2"width at corner of bldg wythe avenue/n11 st. providing exit discharge into the street from bldg staircase
Jan 15, 2013
Resolve - Class - 1
Failure to provide unobstructed exit passageway.noted:cellar fire exitcorridor partially obstructed by placed4wheeled containers with trash cardboards and linen.rmdy:remove obstruction forthwith.
Jan 10, 2013
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner:use of prohibited door hardware.noted: fire exit metal gate from side yard exit passagewayon property line fence leading into wythe ave street one side of gate
Jan 10, 2013
Resolve - Class - 2
Work w/o a permit. illegal work noted:erected on sidewalk on front of hotel and restaurants entrance/exit door metal frame and fabric,plastic glass walls anchored to bldg/sidewalk storm enclosure approx 8'x8'
Jan 10, 2013
Resolve - Class - 1
Failure to maintain building in code-compliant manner:illumination forexits,exit discharges and public corridors per bc1006.1;27-381.noted: no illumination/emergency lights provided for side yard exit passagewa
Jan 10, 2013
Resolve - Class - 1
Bc1023.1 failure to comply w/exit discharge to exterior.exits shall discharge directly to the exterior of the bldg.the exit discharge shall not reenter a bldg.noted:1-exit dischage from hotel floors 2-8 and pa
Jan 10, 2013
Resolve
Show 16 more ↓
- Class - 1
Failure to provide exist sign ehre required for exists/exit doors.noted: missing exit sign at 1-exit door on staircase "a" at ground level leading into side yard 1 exit passageway 2-at side yard exit passageway
Jan 10, 2013
Resolve - Class - 2
Approved place of assembly plans not available for inspection.noted:for place of assembly on 6th flr #320406761 and on 1st flr #320406814.plans showing seating not provided for inspection.rmdy:provide approved
Jan 10, 2013
Resolve - Class - 2
Work w/o a permit.illegal work noted:on 6th flr erected frame built into the walls bunk bed:3 bunk bed(total 6 beds in room #601 and 2 bunk beds (total 4 beds in room #602.all work completed w/o first obtaining
Jan 10, 2013
Resolve - Class - 2
Failed to notify dept. prior to use/installation of c-hook in connection w/suspended scaffolds, notede:notification was made at time of inspection.remedy:comply w/dob code requirements.
Oct 18, 2011 · Penalty $400
Resolve - Class - 1
Stirrups location on suspended c-hook erected scaffolds not in compliance w/dob code requirements.noted:c-hook scaffoldings at exp.#2 lift stirrups located approx. 36" from the end of the scaffold.remedy:comply
Oct 18, 2011 · Penalty $1,600
Resolve - Class - 2
Sidewalk shed built not in accordance to dob approved plans.noted:missing sidewalk shed at exp.#2 about 40 linear ft.remedy:comply w/dob approved plans.
Oct 18, 2011
Resolve - Class - 1
Use of rigging equipment w/o a rigger's license noted:material hoist installed at exp.#2 w/o notification by license rigger of the bldg dept.remedy;obtain licensed rigger.
Oct 18, 2011 · Penalty $800
Resolve - Class - 1
Failure to institute maintain safety equipment measures or temporary construction noted at time of insp on an active construction site trades working throughout bldg permanent stair installed at north & south e
Aug 24, 2011
Resolve - Class - 1
Bc1906.6.1.2 restores in proximity of facade noted at time of insp on an active construction site reshores are installed at west elevations floors 6&7 w/in 10ft of edge of slab are not secured at top to prevent
Aug 24, 2011
Resolve - Class - 1
Failure to institute maintain safety equipment measures or temporary construction no guardrails noted at time of insp on an active construction site trades working rough out site all elevations 2 to 7 flrs no g
Aug 24, 2011
Resolve - Class - 1
Bc3308.1.1 vertical netting noted at time of insp on an active construction site at all exposures from flrs 2 to 9 no or inadequate vertical netting installed at openings for windows or where permanent walls no
Aug 24, 2011
Resolve - Class - 1
Sec. 3308.3 vertical safety netting requirements. as noted: at time of inspection on a section construction site,building up to roof level,concrete placement at floor #8,there is no vertical safety netting at
Aug 4, 2011 · Penalty $1,600
Resolve - Class - 2
Failure to provide special inspection of concrete placement. as noted: at time of inspection at an active construction site,i observed fresh concrete being place at floor #84000 (psi) lt wt concrete w/o a speci
Aug 4, 2011 · Penalty $1,600
Resolve - Class - 1
Sec. 3308.1.3 failure to provide horizontal netting during new construction & structural addition. as noted: at time of inspection on a action concrete site,roof level is 9 stories in height,concrete placement
Aug 4, 2011 · Penalty $1,600
Resolve - Class - 2
Failed to notify the department obtain permits prior to use/inst out "c" hooks in connection with suspended scaffold. noted: no "c" hook notification for suspended scaffolds at exposures # 1, #4. remedy: not
Jul 12, 2011 · Penalty $800
Resolve - Class - 1
Erected or installed supported scaffold 40ft or higher without a permit. noted at exposure #4, supported scaffold over 40ft in height has been erected without a permit. remedy: obtain permit. partial swo (suppo
Jul 12, 2011 · Penalty $1,200
Resolve
Complaints
- Heating
Heat related
Nov 23, 2007 · Apt 4E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (HB)
- Year built
- 1901
- Floors
- 8
- Residential units
- —
- Building area
- 72,500 ft²
- Lot area
- 11,105 ft²
- Zoning
- M1-2
- Community board
- 301
- Council district
- 33
- Block / lot
- 2288 / 24
- Assessed value
- $32,073,750
- Landmark / historic district
- No
Questions about 75 North 11 Street
Who owns 75 North 11 Street?
The owner of record in NYC Department of City Planning PLUTO data is Wythehotel LLC.
Does 75 North 11 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 75 North 11 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 75 North 11 Street built?
City records list 1901 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.