Violations at 188 Marcy Avenue
Brooklyn, NY 11211 · BBL 3-02141-0019 · Back to the property
HPD housing violations
The newest 50 of 80 HPD violations. The city keeps the complete history.
- BHazardous
Properly repair or replace the broken or defective latch set and its assemblies at fire door leading to public hall stair case ''a'' at public hall, 1st story
Aug 4, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door leading to public hall stair case ''a'' at public hall, 1st story
Aug 4, 2026
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2a, 2nd story, 3rd apartment from east at south
Aug 4, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Dec 29, 2025 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6h, 6th story, 2nd apartment from south at west
Nov 19, 2025 · Apt 6H
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6h, 6th story, 2nd apartment from south at west
Nov 19, 2025 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6h, 6th story, 2nd apartment from south at west
Nov 19, 2025 · Apt 6H
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt a2, 2nd story, 3rd apartment from east at south original violation 18083867 issued 11-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jul 11, 2025 · Apt A2
Open — Defect letter issued - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt a2, 2nd story, 3rd apartment from east at south
Jul 11, 2025 · Apt A2
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt a2, 2nd story, 3rd apartment from east at south
Jul 11, 2025 · Apt A2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt a2, 2nd story, 3rd apartment from east at south
Jul 11, 2025 · Apt A2
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls, all ceilings thoughtout in the entire apartment located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing glass pane at upper and lower sash windows/cut hazard in the kitchen located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the kitchen located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Closed — Violation dismissed - ANon-hazardous
Properly secure the loose electrical outlet at closet at south wall in the private hallway located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective vinyle floor tiles/cut hazard in the private hallway located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west and south walls in the private hallway located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at electrical fixtures at ceiling in the private hallway located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective bathtub/cut hazard in the bathroom located at apt 21d, 21st story, 2nd apartment from east at south
Jun 23, 2025 · Apt 21D
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at boiler room
Dec 12, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 21c, 21st story, 1st apartment from north at east
Dec 12, 2024 · Apt 21C
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing wooden door in the bathroom located at apt 9e, 9th story, 1st apartment from east at south
Jul 22, 2024 · Apt 9E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 9e, 9th story, 1st apartment from east at south
Jul 22, 2024 · Apt 9E
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective gasket seal at lower refrigerator door. in the kitchen located at apt 9e, 9th story, 1st apartment from east at south
Jul 22, 2024 · Apt 9E
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 9e, 9th story, 1st apartment from east at south
Jul 22, 2024 · Apt 9E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer , the bathroom , the 2nd room from north, the 3rd room from north located at apt 15e, 15th story, 1st apartment from west at north
Oct 6, 2022 · Apt 15E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall in the kitchen located at apt 15e, 15th story, 1st apartment from west at north
Oct 6, 2022 · Apt 15E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the 2nd room from north located at apt 15e, 15th story, 1st apartment from west at north
Oct 6, 2022 · Apt 15E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 15e, 15th story, 1st apartment from west at north
Oct 6, 2022 · Apt 15E
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 15e, 15th story, 1st apartment from north at east
Oct 6, 2022 · Apt 15E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 15e, 15th story, 1st apartment from north at east
Oct 6, 2022 · Apt 15E
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective locking device at door at north wall leading to fire stairs at public hall, 1st story
Sep 28, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective firedoor at north wall leading to fire stairs at public hall, 1st story
Sep 28, 2022
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at wall at public hall, 1st story
Apr 20, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the foyer , the kitchen , the private hallway , the bathroom located at apt 5b, 5th story, 1st apartment from east at south
Feb 4, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 5b, 5th story, 1st apartment from east at south
Feb 4, 2022 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... (approx. 1 sq ft) at east wall in the kitchen located at apt 5b, 5th story, 1st apartment from east at south
Feb 4, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from east located at apt 5b, 5th story, 1st apartment from east at south
Feb 4, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt 5b, 5th story, 1st apartment from east at south
Feb 2, 2022 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 5b, 5th story, 1st apartment from west at north
Nov 29, 2021 · Apt 5B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall and north wall in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Nov 29, 2021 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Nov 29, 2021 · Apt 5B
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Nov 29, 2021 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring at east exterior wall at north , 1st story
Nov 28, 2021
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen located at apt 7b, 7th story, 1st apartment from north at east
Oct 18, 2021 · Apt 7B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the recesses of the window at west in the 1st room from north located at apt 9c, 9th story, 1st apartment from south at west
Sep 5, 2021 · Apt 9C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd bathroom from north at west located at apt 9c, 9th story, 1st apartment from south at west
Sep 5, 2021 · Apt 9C
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Aug 6, 2021
Closed — Violation closed
DOB building violations
The newest 50 of 51 DOB violations. The city keeps the complete history.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - active - Construction other optional
Emergency work order due to unsafe conditions at all exposures as per fisp filing # unsafe 909570-9c-001 remedy: immediately provide adequate safety measures at all facade exposures as per protection plan recommended by the qewi
Feb 29, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 23, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 23, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 23, 2016
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Dec 4, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 16, 2004
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Jan 27, 2004
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Jan 27, 2004
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Jan 27, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations
21 ECB violations, newest first.
- Class - 1
Failure to take/provide required action to secure public safety at a designated unsafe building facade as per technical report(unsafe-909570-9c-001). note: at the time of inspection observed no any safety measu
Feb 29, 2024 · Penalty $10,000
Resolve - Class - 2
Failure to file acceptable amended cycle 9c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#909573.rem:file acceptable report.
Jan 16, 2024 · Penalty $1,250
Resolve - Class - 2
Observed the approved plans under alt 2 application # 340702724 does not have a detail section plus a descriptive material information section for the framing & sheet rocking work done in the hallways from the
Nov 3, 2021 · Penalty $625
Resolve - Class - 2
Sidewalk shed parapet panel.note:at time of inspection on an alt 2 forbuilding renovation i observed no ongoing construction work.also observed heavy duty sidewalk shed at exposure # 1 has been erected no infor
Apr 10, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. note: exposure #1 south elevation: i observed damaged mortar joints on 14th floor spandrel right of main entrance; spalling roof deck slab; exposu
Apr 9, 2018
Resolve - Class - 2
Failure to maintain exterior bldg walls and appurtenances. note: exp1 south elevation i observed spalled bricks on 2nd and 12 floors eroding bricks on 12 floor, cracked mortar joins on 13 flr. damaged sealanet
Feb 26, 2018
Resolve - Class - 2
19n7,10h11. 19m7-provide missing eccentric on the 8th floor.
Jun 2, 2017
Resolve - Class - 1
Failure to take required measures to secure public safety-unsafe facade.noted:the qewi submitted a fisp3:notification of unsafe conditions document to the department prior to this inspection and safety measures
Dec 5, 2015
Resolve - Class - 1
Failure to take required measures to secure public safety-unsafe facade.noted:the qewi submitted a fisp3:notification of unsafe conditions document to the department prior to this inspection and safety measures
Dec 5, 2015
Resolve - Class - 1
Failure to take required measures to secure public safety-unsafe facade.noted:the qewi submitted a fisp3:notification of unsafe conditions document to the department prior to this inspection and safety measures
Dec 5, 2015
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules & regulations
Jan 23, 2009
Resolve - Hazardous
Failure to file an amended fifth round report accpetable to this department indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedia
May 26, 2004
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy:file an amended report following remedi
May 26, 2004
Resolve - Hazardous
Failure to file an amended fifth round report acceptable this department indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedial
May 26, 2004
Resolve - Hazardous
Sidewalk shed does not meet building code specifications. noted: approx. 1000 ft of sidewalk shed almost entirely without inside enclosure panels. remedy: provide all required enclosure panels and conform shed
Apr 21, 2004 · Penalty $5,000
Resolve - Hazardous
Failure to maintain exterior building wall. noted: several unsupportedor improperly supported window mounted a/c units located on facades ofall elevations. remedy: provided manufacterers' brackets or other
Apr 21, 2004
Resolve - Hazardous
Failure to file an amended fifth round report accetable to this department indicating correction of unsafe condiitons described in initial local law 11/98 report.remedy:file an amended report following rmedial
Mar 26, 2004
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedia
Mar 26, 2004
Resolve - Hazardous
Failure to file an amended fifth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedia
Mar 26, 2004
Resolve - Hazardous
Failure to carry out construction opeations in a safe manner, excessive removal of brickwork on all 13 floors at top of window level height, undermining brick facade throughout structure. remedy: make safe imme
Sep 14, 2003 · Penalty $1,000
Resolve - Hazardous
Failure to provide adequate protection for sidewalks & walkways duringcontructuin operation insufficent protection during facade constructi on loose unprotcted bricks fell to sidewalk & walkway.remedy:provide
Sep 14, 2003 · Penalty $2,000
Resolve