roofy

313 Cumberland Street

Brooklyn, NY 11238BBL 3-02119-0001Map

Owner of record: Bishop Francis J. Mugavero Senior

313 Cumberland Street is an elevator apartment building built in 1928 in Brooklyn, 11238. It has 86 residential units across 6 floors. The owner of record is Bishop Francis J. Mugavero Senior. HPD has recorded 139 housing violations here, most recently on October 5, 2026. 9 of the 50 most recent violations are still open.

HPD violations
139
DOB violations
43
ECB violations
21
HPD complaints
330

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 139

  • B

    Provide and maintain a pure and wholesome water supply that was found discolored at sink and wash basin in the bathroom located at apt apt1c, 1st story, 1st apartment from south at west

    Oct 5, 2026 · Apt APT1C

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt apt1c, 1st story, 1st apartment from south at west

    Oct 5, 2026 · Apt APT1C

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 4f, 5th story, 4th apartment from east at south

    Jul 22, 2026 · Apt 4F

    Open — Civ14 mailed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . in the entrance located at apt 4f, 4th story, 4th apartment from east at south

    Jun 2, 2026 · Apt 4F

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective counter balance of lower sash at south 1 window in the 1st room from east located at apt 4f, 4th story, 4th apartment from east at south

    Jun 2, 2026 · Apt 4F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4p, 4th story, 2nd apartment from west at north , section ''east''

    Feb 2, 2026 · Apt 4P

    Open — Not complied with
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6g, 6th story, 3rd apartment from east at south

    Jan 9, 2026 · Apt 6G

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective counterbalance at lower sash at 1st window from east at south in the 2nd room from east located at apt 1j, 1st story, 1st apartment from east at south

    Sep 4, 2025 · Apt 1J

    Open — First no access to re- inspect violation
  • B

    Properly repair or replace the broken or defective wood door at 1st closet from east at north in the private hallway located at apt 1j, 1st story, 1st apartment from east at south

    Aug 14, 2025 · Apt 1J

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1j, 1st story, 1st apartment from east at south

    Aug 14, 2025 · Apt 1J

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at east, north, and west walls in the bathroom located at apt 1j, 1st story, 1st apartment from east at south

    Aug 14, 2025 · Apt 1J

    Open — Violation will be reinspected
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1j, 1st story, 1st apartment from east at south

    Aug 14, 2025 · Apt 1J

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ unviewable mail area ] at public hall

    Aug 14, 2025

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing wood wedge door stopper at fire door leading to laundry room at west at public hall, 1st story

    Aug 14, 2025

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of lockable knob at door preventing entrance to fire escape window in the 1st room from east located at apt 1j, 1st story, 1st apartment from east at south

    Aug 14, 2025 · Apt 1J

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1j, 1st story, 1st apartment from east at south

    Aug 14, 2025 · Apt 1J

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective wood door at closet at east in the foyer located at apt 1j, 1st story, 1st apartment from east at south

    Aug 14, 2025 · Apt 1J

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective spring balance at 2nd lower sash window from east at south wall in the 2nd room from east located at apt 1j, 1st story, 1st apartment from east at south

    Aug 14, 2025 · Apt 1J

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective spring balance at 1st lower sash window from east at south wall in the 2nd room from east located at apt 1j, 1st story, 1st apartment from east at south

    Aug 14, 2025 · Apt 1J

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective lower sash window at east wall in the 1st room from east located at apt 1l, 1st story, 2nd apartment from north at east

    Jul 25, 2025 · Apt 1L

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to laundry room at west at public hall, 1st story, section ''eastnorth''

    Jul 22, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at 1st fire door from north at cellar at public hall

    Jul 22, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective spring balance at lower sash window in the kitchen located at apt 1j, 1st story

    Jun 12, 2025 · Apt 1J

    Open — First no access to re- inspect violation
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2e, 2nd story, 5th apartment from north at east

    Feb 12, 2025 · Apt 2E

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of scalding hot water exceeding allowable temp of 130 degrees at all hot water fixtures thermometer #7210 in the entire apartment located at apt 2e, 2nd story, 5th apartment from north at east

    Feb 12, 2025 · Apt 2E

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2g, 2nd story, 3rd apartment from east at south

    Feb 11, 2025 · Apt 2G

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2g, 2nd story, 3rd apartment from east at south

    Feb 11, 2025 · Apt 2G

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 4th apartment from east at south

    Jul 2, 2024 · Apt 4F

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4f, 4th story, 4th apartment from east at south

    Jul 2, 2024 · Apt 4F

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective spring ballance at lower sash window in the kitchen located at apt 1j, 1st story

    Jun 4, 2024 · Apt 1J

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4f, 4th story, 4th apartment from east at south

    May 24, 2024 · Apt 4F

    Closed — Violation closed
  • B

    Refit lower couner balance south window in the 2nd room from east located at apt 4f, 4th story, 4th apartment from east at south

    May 24, 2024 · Apt 4F

    Closed — Violation closed
  • B

    Refit lower counter balance south window in the 1st room from east located at apt 4f, 4th story, 4th apartment from east at south

    May 24, 2024 · Apt 4F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective (inoperative) lower sash at the 2nd window from east at south in the 2nd room from east located at apt 1j, 1st story, 1st apartment from east at south

    Apr 29, 2024 · Apt 1J

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective (inoperative) lower sash at the 1st window from east at south in the 2nd room from east located at apt 1j, 1st story, 1st apartment from east at south

    Apr 29, 2024 · Apt 1J

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1j, 1st story, 1st apartment from east at south

    Apr 29, 2024 · Apt 1J

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective (inoperative) the 2nd window from west at south, stuck in closed position in the 2nd room from east located at apt 1j, 1st story, 1st apartment from east at south

    Apr 15, 2024 · Apt 1J

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the visible black mold, off the caulking around the bathtub in the bathroom located at apt 1j, 1st story, 1st apartment from east at south

    Apr 15, 2024 · Apt 1J

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective (inoperative) lower sash at the 1st window from east at south in the 2nd room from east located at apt 1j, 1st story, 1st apartment from east at south

    Apr 15, 2024 · Apt 1J

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1j, 1st story, 1st apartment from east at south

    Apr 15, 2024 · Apt 1J

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the 1st room from east located at apt 8a, 8th story, 1st apartment from north at east

    Jan 24, 2024 · Apt 8A

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 8a, 8th story, 1st apartment from north at east

    Jan 24, 2024 · Apt 8A

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing permanent magnetic holder at 2nd door at east fire door at public hall 1st story

    Aug 28, 2023

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing permanent magnetic holder at 1st door at east fire door at public hall 1st story

    Aug 28, 2023

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx 2 sqf at south wall in the bathroom located at apt 6d, 6th story, 1st apartment from south at west

    Aug 28, 2023 · Apt 6D

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling at basemant ,public hall

    Aug 28, 2023

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling at 6th story public hall

    Aug 28, 2023

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling at 1st story public hall

    Aug 28, 2023

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approx 2 sqf at south wall in the bathroom located at apt 6d, 6th story, 1st apartment from south at west original violation 16202298 issued 28-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 28, 2023 · Apt 6D

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling at 5th story public hall

    Aug 28, 2023

    Closed — Violation dismissed

DOB building violations · 43

  • Construction other optional

    Failure to maintain building in code compliant manner. observed at exposure 1 2nd floor crack window pane above stand pipe valve, and damaged mortar joints at 7th floor under roof cornice at exposure 4 and exposure 3. remedy: repair and/or replace

    May 20, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 14, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2019

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
Show 33 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 28, 2018

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Sep 21, 2018

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2011 inspection/test

    Oct 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 1, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 1, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 25, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 25, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 27, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 27, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 25, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 25, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 21, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 21, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 29, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 29, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    3p7660

    Aug 20, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    3p7661

    Aug 20, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    3p7660

    Aug 20, 2002

    Dob violation - resolved
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    3p7660

    Aug 21, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    3p7661

    Aug 21, 2001

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Elevator elevatorrequired

    3p7660

    Apr 6, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    3p7661

    Apr 6, 2000

    Dob violation - resolved
  • Facade facade optional

    Ll1080-local law 10/80 - facade facade optional

    Jul 1, 1992

    Dob violation - dismissed
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    May 22, 1992

    Dob violation - dismissed
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    Mar 12, 1992

    Dob violation - dismissed
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    Jun 6, 1989

    Dob violation - dismissed

ECB violations · 21

  • Class - 2

    Failure to comply with commissioner's order contained in summons #35663917r issued on 08/08/2022, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert

    Jan 29, 2025 · Penalty $1,250

    Resolve
  • Class - 1

    Class 1: cease use: hoist ropes are severely worn. replace with new ropes. reinspection required with 125% weight test. all weight tests required to restore service (cu). to restore service contact nycdob at ei

    Jul 30, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Class2 items: replace worn gibs where needed. misaligned cab mirror. secure gibs where needed. maintenance log not up to date. remove wire tie from main line. adjust spring closures where needed. clutch scrapin

    Dec 6, 2023

    Resolve
  • Class - 1

    Cease use item: inoperative zone lock restrictor. class2 items: replace worn gibs where needed. misaligned cab mirror. secure gibs where needed. maintenance log not up to date. remove wire tie from main line.

    Dec 6, 2023 · Penalty $1,280

    Resolve
  • Class - 2

    Failure to post or distribute safe construction bill of rights. notes:at the time of my inspection of job #b00895269, i observed no safe construction bill of rights has been filled out and posted. residential s

    Oct 30, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    At the time of my inspection of a 8 story building, i observed sidewalk shed in place at exposure #1,2 and 4 with a valid permit date: 03-31-2024. light were on at places under the shed but at exposure #4 there

    Aug 7, 2023 · Penalty $625

    Resolve
  • Class - 2

    Car is bouncing on 1st floor. adjust. adjust floor stops.

    Mar 20, 2023

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #909565.remedy:submit acceptable required te

    Dec 9, 2022 · Penalty $1,280

    Resolve
  • Class - 2

    At the time of my inspection of a 8 story building, i observed sidewalk shed in place at exposure # 1, 2 and 3 with a valid permit and the following objection light bulbs were not working at exposure #1 and hal

    Nov 29, 2022 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain bldg exterior walls facade&appurtenances:view@exp1w el (cumberlandst) crack stone on top of balusters right below parapet railing&spalled terracotta unite nw parapet corner exp4s el (greenea

    Aug 8, 2022 · Penalty $1,250

    Resolve
Show 11 more ↓
  • Class - 1

    Failure to maintain building exterior walls or appurtenances.note:at time of inspection,observed at 1)exposure#1 west elevation;(cumberlaw cracked)stone on top of balusters right below parapet railing.(1)spalle

    Jun 7, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building exterior walls/facades and appurtenances.west elevation exp2: crack at 3rd floor water table, damaged mortar joints, step crack. crack window glass at 1st floor and crck at north

    Sep 7, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #809565.submit required technical report.

    May 18, 2018 · Penalty $625

    Resolve
  • Class - 2

    Fail to submit an acceptable sixth round technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances as required article 28.302 & dob rules & regulations. remedy: fil

    Jan 23, 2009 · Penalty $800

    Resolve
  • Hazardous

    Failure to lock together frames vertically by pins or equivalent means(osha) & 1926.452(c)(4). - missing pins. remedy: maintain safeguard

    Apr 26, 2008 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to provide notice to dob prior to install/use "c" hooks in connection w/suspended scaffolds. remedy: provide notice to dob.

    Apr 26, 2008 · Penalty $500

    Resolve
  • Hazardous

    Failure to maintain: defect noted: 1) light fixture at sidewalk shed is missing lightbulb & protective cage. 2) conduit is bent & pulling away from fixture exposing wires. remedy: provide lighting protective

    May 18, 2004 · Penalty $2,500

    Resolve
  • Hazardous

    Sidewalk shed does not meet bldg code specification noted sidewalk shed erected on southeart corner of bldg ealk no ligthing and no side deck enclosure cracking a hazardous condition loose side board fell to si

    Oct 4, 2003 · Penalty $2,000

    Resolve
  • Hazardous

    Failure to submit a third round technical report: periodic inspection of exterior wall and appurtenances required by local law 10 of 1980 and the department of buildings rules and regulations. remedy: file th

    Aug 6, 1993

    Resolve
  • Non-hazardous

    73m,(73) five year test and file elev3

    Oct 22, 1990 · Penalty $75

    Resolve
  • Non-hazardous

    Failure to maintain:plaster in ceiling of lobby app.8' x 15'collapsed,remedy:make all necessary repairs in a safe and lawful manner.

    Aug 8, 1990

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Sep 28, 2026 · Apt APT1C

    Close
  • Door/window

    Window frame

    Jul 20, 2026 · Apt 4F

    Close
  • Unsanitary condition

    Mold

    Jul 20, 2026 · Apt 4F

    Close
  • Door/window

    Door

    Jul 20, 2026 · Apt 4F

    Close
  • Water leak

    Slow leak

    Jul 20, 2026 · Apt 4F

    Close
  • Paint/plaster

    Wall

    Jul 20, 2026 · Apt 4F

    Close
  • Water leak

    Heavy flow

    Jun 24, 2026 · Apt 4FLYDI

    Close
  • Plumbing

    Basin/sink

    Jun 24, 2026 · Apt 4FLYDI

    Close
  • Plumbing

    Basin/sink

    Jun 24, 2026 · Apt 4F

    Close
  • Door/window

    Window frame

    Jun 24, 2026 · Apt 4FLYDI

    Close
Show 40 more ↓
  • Paint/plaster

    Door/frame

    Jun 24, 2026 · Apt 4FLYDI

    Close
  • Safety

    Fire escape

    Jun 24, 2026 · Apt 4FLYDI

    Close
  • General

    Cooking gas

    Jun 2, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Jun 2, 2026 · Apt BLDG

    Close
  • Door/window

    Window frame

    May 21, 2026 · Apt 4F

    Close
  • Door/window

    Door

    May 21, 2026 · Apt 4F

    Close
  • Door/window

    Window frame

    Feb 24, 2026 · Apt 4F

    Close
  • Paint/plaster

    Wall

    Feb 24, 2026 · Apt 4F

    Close
  • Door/window

    Door

    Feb 24, 2026 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Feb 6, 2026 · Apt 4P

    Close
  • Appliance

    Electric/gas range

    Feb 6, 2026 · Apt 4P

    Close
  • General

    Cooking gas

    Feb 5, 2026 · Apt 4P

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2026 · Apt 4P

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Jan 31, 2026 · Apt 4P

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 4P

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Jan 25, 2026 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jan 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2026 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Jan 6, 2026 · Apt 6H

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 1, 2026 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2025 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Dec 22, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt 2M

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2025 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2025 · Apt 5D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1928
Floors
6
Residential units
86
Building area
82,000 ft²
Lot area
19,000 ft²
Zoning
R6B
Community board
302
Council district
35
Block / lot
2119 / 1
Assessed value
$5,613,750
Landmark / historic district
No

HPD registration #375580, last renewed Sep 8, 2025.

Questions about 313 Cumberland Street

Who owns 313 Cumberland Street?

The owner of record in NYC Department of City Planning PLUTO data is Bishop Francis J. Mugavero Senior.

Does 313 Cumberland Street have violations?

Yes. NYC HPD has recorded 139 housing violations at this property.

Is 313 Cumberland Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 313 Cumberland Street built?

City records list 1928 as the year it was built.

How many apartments are in 313 Cumberland Street?

It has 86 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.