147 St Felix Street
Brooklyn, NY 11217BBL 3-02112-0001Map
Owner of record: 147 St. Felix Street, LLC
147 St Felix Street is a mixed residential and retail building built in 2023 in Brooklyn, 11217. It has 2 residential units across 3 floors. The owner of record is 147 St. Felix Street, LLC. HPD has recorded 24 housing violations here, most recently on August 30, 2005. 24 of the 24 most recent violations are still open.
- HPD violations
- 24
- DOB violations
- 4
- ECB violations
- 29
- HPD complaints
- 0
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings of all stories public hall
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective ceiling light fixture of 1st sty. public hall and wall fixture of 3rd sty. public hall.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling of kitchen --3rd sty. apt.
Aug 30, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches at 3rd sty. apt.
Aug 30, 2005
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of illegal defective electrical wiring--at meter box--cellar at south.
Aug 30, 2005
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of exposed electric wiring--2nd sty public hall
Aug 30, 2005
Open — Nov sent out - BHazardous
Replace with new the broken or defective window sashes-front west room 3 windows --3rd sty apt #2.
Aug 30, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wiring throughout-3rd sty apt #2.
Aug 30, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wiring--all stys public halls.
Aug 30, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wiring-cellar throughout.
Aug 30, 2005
Open — Nov sent out
Show 14 more ↓
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar throughout.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls & ceilings throughout --2nd sty apt #1.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls & ceilings throughout 2nd sty apt #1.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls & ceilings throughout 3rd sty apt #2.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls & ceilings throughout-3rd sty apt #2.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls & ceilings public halls --all stys.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls & ceilings -public halls all stys.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the public hall floors & stairs-all stys.
Aug 30, 2005
Open — Nov sent out - CImmediately hazardous
Replace with new the missing street entrance door--lock & assembly to building.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
And department rules and regulations: scrape and remove rust scales and paint with two coats of paint the rear fire escape all stys.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective metal ceiling of 1st sty public hall.
Aug 30, 2005
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets bathtub at bathroom 3rd sty apt.
Aug 30, 2005
Open — Nov sent out - ANon-hazardous
Refit front entrance door to building.
Aug 30, 2005
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective wood tread 5th up from 2nd to 3rd sty public hall stair.
Aug 30, 2005
Open — Nov sent out
DOB building violations · 4
- Construction other optional
At time of inspection bc order stop all work under job# 320911787 immediately do to the construction superintendent of record has informed to dob that she or he withdrawn from the project. stop all work immediately
Jun 1, 2022
Dob violation - dismissed - Construction other optional
At time of inspection bc order stop all work under job# 320911787 immediately do to the construction superintendent of record has informed to dob that she or he withdrawn from the project. stop all work immediately
Jun 1, 2022
Dob violation - dismissed - Emergency none
Demo/landmark building
Mar 19, 1997
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
May 14, 1984
Dob violation - dismissed
ECB violations · 29
- Class - 2
Responding a complaint observed: sidewalk shed installed at expo# 1-2. no underside lighting inoperable light bulbs, failure to maintain as per code 3307.6.4.8 become an unsafe and hazardous condition for pedes
Nov 27, 2023 · Penalty $2,400
Resolve - Class - 1
Sec. bc 3307.4.7 work on storage zone. note: at the time of my inspection of a 3 sty new bldg construction work in progress. i observed at ex¢#4 air compressor growth machine & excavator w/yodock system only on
Mar 11, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all public & property. note: at the time of my inspection of a 3 sty new bldg excavation phase construction work in progress,i observed large amount of water in foundation from pile drillin
Mar 11, 2022 · Penalty $5,000
Resolve - Class - 1
Sec. bc 3303.14.2 drainage of excavation. note: at the time of my inspection of a 3 sty new bldg excavation phase. construction work in progress,i observed large amount of water in foundation from pile driven
Mar 11, 2022 · Penalty $2,500
Resolve - Class - 1
Bc3307.4.3 yodoks not maintained.at time of inspection of proposed 3 story new building inactive jobsite observed roadway occupied by contractor at exp #4 with yodoks & materials in place.yodoks not maintained
Feb 3, 2022 · Penalty $2,500
Resolve - Class - 1
Bc3303.4.2 dumpster container note:ato my insp of 3stynb.i observed 5workers on jobsite&dumpster container@exp4 full of debris&bldg materials above unit&had no covers fail to cover container creates hazard for
Jan 25, 2022
Resolve - Class - 2
Expired permit note:ato my insp of 3stynb@grade level.i observed@exp4 dumpster container,concrete sandbags&dewatering tank upon request for dot permit the ones that were onsite that were rescented to me were ex
Jan 25, 2022
Resolve - Class - 1
Bc3301.1.3 failure to comply w/manufacture spec note:atoi my insp of 3stynb@foundation phase.i observed 1worker operating small excavator upon request for trained cert none was presented to me worker had no tra
Jan 25, 2022
Resolve - Class - 2
Expired permit(dot)note:at the time of my inspeciton of a 3 story new building.i observed 5 workers on job site and at exp#4 dumpster container,paints of concrete sand bass and deinatering tank.upon request for
Jan 3, 2022 · Penalty $625
Resolve - Class - 2
Construction fence at site note constructed as per code, wood panels are not secured properly and are loose .two 4 by 8 wood panels being held together with a 2 by 4 nailed to exterior side of fence, comply wit
Dec 30, 2021
Resolve
Show 19 more ↓
- Class - 1
Bc3307.4 barriers storage near sw&on st.note:ato my insp of 3stynb.i observed on st pallets of concrete sand bags,dumpster container&dewatering tank&they werent fully.yodock system wasnt all the way around.this
Dec 28, 2021 · Penalty $625
Resolve - Class - 2
Expired permit (dot) note:ato my insp of 3stynb i observed 2workers onjobsite repairing cosnt fence@grade level,i also observed@exp4 dumpster container,pallets of concrete sand bags&rewatering tank.upon request
Dec 28, 2021
Resolve - Class - 1
Bc3303.4.1.2 location of hose lines.note:at the time of inspection i observed hose line hanging over construction fence in the pedestrian walkway(sidewalk) hanging less than 8ft as required.this creates an un
Dec 6, 2021 · Penalty $625
Resolve - Class - 1
Failure to comply w/manufacturer specifications.note:at the time of inspection i observed barriers in roadway.upon inspecton i observed theywere not in place as per manufacturer specifications.(1)not filled w/
Dec 6, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to safeguard all persons and property affected by construction operations.note:inspection of 3 story nb currently at grade level work in progress observed basement has water leaked from site to adjacent
Dec 2, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to renew dot permit.note:at time of inspection of 3 story bldg currently at grade level work in progress observed dot permit expired november 2021.remedy:renew permit.
Dec 2, 2021
Resolve - Class - 2
Failure to safeguard all persons and property affected by construction operation. a time of inspection observed bags of cement has fallen into neighboring occupied rear yard where contractor hoisted unsecured c
Nov 30, 2021
Resolve - Class - 3
15 16 40 50a-remove unused flue pipe from chimney and sealed up hole 50b-pipe hot water relief value discharge down no threaded end 50c-seperate control from 1/4" line
Jul 2, 2010 · Penalty $200
Resolve - Non-hazardous
Failure to weatherfproff adjacent bldgs. noted failure to parge adjacent walls. at hte completion of demolition. remedy: make necessary repairs to the satisfaction of dept.
Apr 9, 1998 · Penalty $500
Resolve - Non-hazardous
Expired demo permit #300636346-expired 1-1-98. demolition operations not completed failure to parge adjacent wall. remedy: renew permit.
Apr 9, 1998 · Penalty $500
Resolve - Non-hazardous
Expired fence permit #300636346-expired 12-31-97. remedy: renew permit
Apr 9, 1998
Resolve - Non-hazardous
Failure to carry out denolition operations in an appropriate manner deno application#300636346 1.holes left in adjoining property 14s lot line wall 2.loose bricks and open mortor joints left in adjoining lot
Mar 16, 1998 · Penalty $2,500
Resolve - Hazardous
Failure to weatherproff adjointing building: demo at site was backfilled/greaded when inspection was made on 07-15-97. however, inspection made on 07-16-97 revealed that adjoining bldg #25 hanson pl, party wal
Sep 16, 1997 · Penalty $500
Resolve - Hazardous
Abandoned and discontinued operating: at time of inspection no one was working at site. north/east bldg foundation still exsist and adjointing bldg wall, 25 hanson pl hasn't been weather proof as to code. said
Sep 16, 1997 · Penalty $500
Resolve - Hazardous
Demolition in an unsafe manner noted two men working on top of a wall aprox 23-0 hig or 15-0 above side walk shed i told them 4 times before to erect a pole scaffold to demolish the walls. this building was bur
Jun 10, 1997 · Penalty $2,000
Resolve - Hazardous
Demolition in an usafe manner noted no gate was provided in fence to provide a safe means of egress plywood was nailed up solid and two sheet would be removed by wrecking bar's to gian ingress stop all work rem
Jun 10, 1997 · Penalty $500
Resolve - Hazardous
(hazardous) failure to carry out demolition operations in a safe and lawful manner. bricks from 147 st. felix place ar falling into rear yard of adjoining structure (145 st. felix place) due to method fo demoli
Jun 7, 1997 · Penalty $5,000
Resolve - Non-hazardous
Failute to provide protections safegurad adjacent property: no solid fence provided between adjacent property at northside of demo-site. contractor at northside of demo- site. contracotr was warn on previous
Jun 6, 1997 · Penalty $1,500
Resolve - Non-hazardous
Failure to post a dept. of trans permti for closing of sidewalk: sidewalk on hanson pl. close off to pedestrian traffic however, d.o.t permti post or available at job site for closing of said sidewalk. remedy:
Jun 6, 1997 · Penalty $350
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 2023
- Floors
- 3
- Residential units
- 2
- Building area
- 4,542 ft²
- Lot area
- 1,700 ft²
- Zoning
- R6B
- Community board
- 302
- Council district
- 35
- Block / lot
- 2112 / 1
- Assessed value
- $147,000
- Landmark / historic district
- No
Questions about 147 St Felix Street
Who owns 147 St Felix Street?
The owner of record in NYC Department of City Planning PLUTO data is 147 St. Felix Street, LLC.
Does 147 St Felix Street have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 147 St Felix Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 147 St Felix Street built?
City records list 2023 as the year it was built.
How many apartments are in 147 St Felix Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.