180 Ashland Place
Brooklyn, NY 11217BBL 3-02095-0026Map
Owner of record: Ashland Dekalb LLC
180 Ashland Place is an elevator apartment building built in 2023 in Brooklyn, 11217. It has 569 residential units across 51 floors. The owner of record is Ashland Dekalb LLC. HPD has recorded 25 housing violations here, most recently on August 9, 2026. 15 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 33
- ECB violations
- 35
- HPD complaints
- 14
Available now in this building
For rentstudio apartment for rent in fort greene
New York, NY
For rentstudio condo for rent in fort greene
New York, NY
For rentstudio condo for rent in fort greene
New York, NY
For rentstudio apartment for rent in fort greene
New York, NY
For rent2-bedroom condo for rent in fort greene
New York, NY
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1812, 18th story, 6th apartment from north at east
Aug 9, 2026 · Apt 1812
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq.ft at window recess, 1st from east at south in the 1st room from east located at apt 1812, 18th story, 6th apartment from north at east
Aug 9, 2026 · Apt 1812
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed
Show 15 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 24, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 8, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 8, 2015
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ceiling light fixture 2nd story public hall
Feb 17, 2004
Open — Nov sent out - ANon-hazardous
Refit front entrance door to bldg 2nd story apt
Feb 17, 2004
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls northwest room kitchen and bathroom 2nd story apt
Feb 17, 2004
Open — Nov sent out - ANon-hazardous
Properly secure the loose electric light ceiling fixture northwest room and center room 2nd story apt
Feb 17, 2004
Open — Nov sent out - ANon-hazardous
Refit front entrance door to 2nd story apt
Feb 17, 2004
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front areaway
Feb 17, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings and walls
Feb 17, 2004
Open — Nov sent out - BHazardous
Properly secure the loose electric light ceiling fixture 2nd story public hall
Feb 17, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice throughout 2nd story apt
Feb 17, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling 2nd and 3rd story public hall
Feb 17, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wire 2nd and 3rd story public hall
Feb 17, 2004
Open — Nov sent out
DOB building violations · 33
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Construction other optional
Two non illuminated signs (approx 5 ft x 30 ft) & (6 ft x 15 ft) for truck parking installed w/o permits
Aug 14, 2017
Vpw*-violation unserved ecb-work without permit-dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 21, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
Show 23 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 4, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2009
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 28, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
3p2136
Jul 28, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
3p2136
Jul 30, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 1992
Vp*-violation unserved ecb- dismissed
ECB violations · 35
- Class - 2
Responding to an incident reported by site safety manager that approximately 18 sheet rock fell on worker foot on 03-03-2025, investigation reveal that worker was walking by sheet rock when they fell and injury
Mar 4, 2025 · Penalty $5,000
Resolve - Class - 2
At time of my inspection on a active jobsite of a 51 story nb,observed that housekeeping was inadequate,mix material and debris creating a trip and fall hazard for workers and personnel on site.comply with cod
Dec 10, 2024
Resolve - Class - 1
At time of my inspection on a active jobsite of a 51 story nb,observed that guardrails were missing or not build as per code-lose nettings ,holes and gurdrail not secured. this creates a hazardous condition f
Dec 10, 2024 · Penalty $5,000
Resolve - Class - 1
At time of inspection on a active jobsite of a 51 story nb, it was observed that no overhead protection was installed at exp#1(ashland place) as per the approved ssp.the failure to provide overhead protection
Dec 10, 2024 · Penalty $2,500
Resolve - Class - 2
Bc 3314.1 - at the time of the inspection on an active job site, i observed supported scaffold at exp#4 and interior was not build as per code, planks were not secured/tied down and safety pins were missing. fa
Dec 10, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000069331n0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000112124n0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024
Resolve - Class - 1
Atoi observed stand pipe gauge on 50 fl drop below 15 psi, and reading on ground floor gauge ~20 psi that may reflect leak in between floors., perform successful hydrostatic pressure test; no work above 75 feet
Jul 23, 2024 · Penalty $5,000
Resolve - Class - 2
At the time of my inspection of 49 story new building, responding to an incident reported by site safety manager that concrete pump pipe broke and spill concrete across the street to the building at 183 ashland
May 14, 2024 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a 49 story new building at 44 floor level, i observed 1 worker on site with a site safety card cancelled/invalid after scanning it. failure to ensure each worker successfully rec
May 14, 2024 · Penalty $5,000
Resolve
Show 25 more ↓
- Class - 2
At the time of my inspection of 49 story new building at 44 floor level, responding to an incident reported by site safety manager that concrete pump pipe broke and spill concrete across the street to the build
May 14, 2024
Resolve - Class - 2
Observed lifts operated @ leading edge w/out safety protocol implemented on the 16th floor at multiple locations, this presents fall hazards for mobile equipment & is not in compliance w/ code.stop all leading
Mar 21, 2024 · Penalty $2,500
Resolve - Class - 2
Observed hot works being conducted on the 30th floor with sparks traveling to floor below w/out fireguard present, presenting fire & burn hazards for persons at the site & is a clear violation, that is not in c
Mar 21, 2024
Resolve - Class - 2
Observed use of acetylene torch without fire-retardant ppe, observed torch work being conducted w/ inadequate fire retardant personal protection equipment.cease torch work, provide fire retardant ppe for person
Mar 21, 2024
Resolve - Class - 1
Bc3301.1.1 responsibility for safety.@49story nb site response to incident worker fell backwards&injured during curtain wall handle operation w/ use of dolly,inspection revealed area to be unsafe result in inju
Mar 7, 2024 · Penalty $5,000
Resolve - Class - 1
Bc 3303.3 watch person at time of inspection at 49-story nb at 11 fl. level building approx.13936 sf.site closed and there was no construction activity. upon shouting at perimeter and banging on fence to alert
Dec 9, 2023 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a 49-story nb at 11th floor structural stage, building approx.13,936 sf.site closed and there was no construction activity.upon shouting at perimeter and banging on fence to aler
Dec 9, 2023
Resolve - Class - 1
Summons issued for failure to institute adequate safety measures due to worker on 7th floor bending rebar when a doka floor prop fell and struck worker on the back. pswo issued for erection of form work at the
Nov 16, 2023
Resolve - Class - 2
Observed outrigger platforms at exp#2 rear, at the 2nd & 3rd fl lvls, in close proximity to the adjacent exp#2 building's rear windows, and sticking out slightly in front of the windows. no protection was in pl
Oct 25, 2023
Resolve - Class - 2
At the time of my inspection of an active job site with 21 workers of various trades, upon request for their fire guard daily logs for hot works , i observed that it was inadequately maintained, missing dates f
Jun 7, 2023
Resolve - Class - 2
At the time of my inspection , i observed that the yodock barriers provided at street level exposure (1) to protect all pedestrians were not water filled as per manufacturer's specification. this creates a h
Jun 7, 2023
Resolve - Class - 1
At the time of my inspection of a 49 story new building construction work in progress, i observed operator in excavator upon scanning of his site safety card it says that the site safety card is cancelled. fail
Apr 24, 2023 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a 49 story new building foundation phase active site, i observed demolition activities at 19 rockwell place and demolition debris falling into construction site at 180 ashland pl
Apr 24, 2023
Resolve - Class - 1
Failure to instiute/maintain safety equipment measures or temporary construction-no guardrails.as noted at time of inspection at an active construction site for a proposed 49 story building at foundation level
Dec 6, 2022 · Penalty $2,500
Resolve - Class - 2
Work does not conform to aproved construction documents and/or amendments-pipe scaffold expo 1 & 4.at the time of inspection at a 4 story demo jobsite,i observed on a active scaffold not built to approved plane
Apr 1, 2022 · Penalty $625
Resolve - Class - 2
Failure to maintain documents to be kept onsite-needle beams/canileverplatform expo 4(dekalb ave)at time of inspection at a 4 story demo jobsite,i observed on the 2nd fl expo 4 side cantilever platform/needle b
Apr 1, 2022 · Penalty $3,125
Resolve - Class - 2
B254,5b,15,50,50a,50b,50c,50d.50.fresh air duct 1/2 blocked w/ debris.50a.storage & debris in boiler room.50b.hot water heater not legally abandoned.50c.loose cement @ (flue) to chimney.50d.rear flame sight gla
Mar 24, 2015
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: exit blocked with parked car. rem: provide unobstructed exit passageway at all emergency exits at all times.
Dec 5, 2009 · Penalty $1,200
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. defects noted: 1) several exit signs not lit. 2) several electrical boxes are missing covers. rem: ensure that exit signs & stair are illuminated. all electric
Dec 5, 2009 · Penalty $250
Resolve - Hazardous
Failure to maintain: note exit lights at exit doors not working throughout. remedy: maintain building.
Dec 28, 2007
Resolve - Hazardous
Use of illegal hardware note:key locked door at street termination of south fire stairs. remedy: remove illegal hardware.
Dec 28, 2007
Resolve - Hazardous
Failure to maintain. note: fire(proofing) of beams + concrete ceiling has been removed at 1st flr + cellar. remedy: replace + maintain building.
Dec 28, 2007
Resolve - Non-hazardous
Failure to post the "certificate of ocupancy". remedy: post the "certificate of occupancy" at the site.
Dec 29, 2005
Resolve - Hazardous
Fire exit lighting defective/fails to meet bldg code standards. noen of the fire exit door signs are lighted. must always be lighted. remedy: repair all fire exit door lighting.
Dec 29, 2005
Resolve - Non-hazardous
75u05
Aug 22, 2000 · Penalty $180
Resolve
Complaints
- Water leak
Heavy flow
Oct 1, 2026 · Apt PH04
Open - Unsanitary condition
Mold
Aug 5, 2026 · Apt 1812
Open - Heat/hot water
Apartment only
Aug 5, 2026 · Apt 1812
Open - Unsanitary condition
Mold
May 18, 2026 · Apt 1812
Close - Plumbing
Water supply
Dec 1, 2025 · Apt 1812
Close - Heat/hot water
Apartment only
Nov 19, 2025 · Apt 1812
Close - General
Floor
Sep 10, 2012 · Apt 3
Close - Plumbing
Basin/sink
Sep 10, 2012 · Apt 3
Close - Plumbing
Bathtub/shower
Sep 10, 2012 · Apt 3
Close - General
Windows
Sep 10, 2012 · Apt 3
Close
Show 4 more ↓
- Paint/plaster
Wall
Sep 7, 2012 · Apt 3
Close - Paint/plaster
Ceiling
Sep 7, 2012 · Apt 3
Close - Plumbing
Water-leaks
Sep 7, 2012 · Apt 3
Close - General
Mold
Sep 7, 2012 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2023
- Floors
- 51
- Residential units
- 569
- Building area
- 425,932 ft²
- Lot area
- 19,581 ft²
- Zoning
- C6-4
- Community board
- 302
- Council district
- 35
- Block / lot
- 2095 / 26
- Assessed value
- $59,816,250
- Landmark / historic district
- No
HPD registration #391793, last renewed Jan 29, 2026.
Questions about 180 Ashland Place
Who owns 180 Ashland Place?
The owner of record in NYC Department of City Planning PLUTO data is Ashland Dekalb LLC.
Does 180 Ashland Place have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 180 Ashland Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 180 Ashland Place built?
City records list 2023 as the year it was built.
How many apartments are in 180 Ashland Place?
It has 569 residential units and 570 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.