419 Franklin Avenue
Brooklyn, NY 11238BBL 3-01988-0008Map
Owner of record: Taylor Equities NY LLC
419 Franklin Avenue is a walk-up apartment building built in 1930 in Brooklyn, 11238. It has 8 residential units across 4 floors. The owner of record is Taylor Equities NY LLC. HPD has recorded 47 housing violations here, most recently on May 4, 2026. 9 of the 47 most recent violations are still open.
- HPD violations
- 47
- DOB violations
- 16
- ECB violations
- 0
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 47
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 4th story
Apr 19, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall at public hall, 3rd story
Apr 19, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Apr 19, 2023
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at building front at fire escape
Apr 19, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling. at public hall, 4th story
Apr 19, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials south wall at public hall, 3rd story
Apr 19, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at public hall, 1st story
Apr 19, 2023
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of flower pots at 4th sty balcony front of building at fire escape
Apr 19, 2023
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the allowed maxlmum temperature of 130 degrees f., in the hot water fixtures in the entire apartment located at apt 8, 4th story, 1st apartment from north at east
Apr 10, 2023 · Apt 8
Closed — Violation dismissed
Show 37 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 8, 4th story, 1st apartment from north at east
Apr 10, 2023 · Apt 8
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Apr 8, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 4, 2nd story, 1st apartment from west at north
Apr 8, 2023 · Apt 4
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2, 1st story, 1st apartment from north at east
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 21, 2022 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 21, 2022 · Apt 2
Open — Invalid certification - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 21, 2022 · Apt 2
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 21, 2022 · Apt 2
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx. 1 sq. ft. at ceiling in the bathroom located at apt 2, 1st story, 1st apartment from north at east
Sep 21, 2022 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 2, 1st story, 1st apartment from north at east
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling in vestibule at public hall, 1st story
Sep 21, 2022
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in vestibule at public hall, 1st story
Sep 21, 2022
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx. 1 sq. ft. at ceiling in the bathroom located at apt 2, 1st story, 1st apartment from north at east original violation 15382214 issued 21-sep-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 21, 2022 · Apt 2
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector which is missing located at apt 7, 4th story, apartment at north
Dec 28, 2014 · Apt 7
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 30, 2010
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant ceiling boiler room at cellar
Jun 30, 2010
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling throghout at cellar
Jun 30, 2010
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
Mar 3, 2008 · Apt 4
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , ceiling, north wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 4, 2nd story, 1st apartment from north at east
Mar 3, 2008 · Apt 4
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at west wall. in the kitchen located at apt 4, 2nd story, 1st apartment from north at east
Mar 3, 2008 · Apt 4
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st door frame from east at south wall in the kitchen located at apt 4, 2nd story, 1st apartment from north at east
Mar 3, 2008 · Apt 4
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
Mar 3, 2008 · Apt 4
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
Mar 3, 2008 · Apt 4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, 1st window frame from west at north wall in the kitchen located at apt 4, 2nd story, 1st apartment from north at east
Mar 3, 2008 · Apt 4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall, east wall in the 1st room from east at south located at apt 4, 2nd story, 1st apartment from north at east
Mar 3, 2008 · Apt 4
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, ceiling, south wall in the kitchen located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, 1st window frame from west at north wall, ceiling, north wall in the 3rd room from east located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - BHazardous
Properly repair the broken or defective intercom system located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - BHazardous
Properly secure the loose electrical outlet socket at south wall in the 4th room from east located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, 1st door from east at south wall, west wall, south wall, ceiling, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 4th room from east located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the 3rd room from east located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall in the 4th room from east located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, east wall, 1st window frame from west at north wall in the kitchen located at apt 8, 4th story, 1st apartment from north at east
Jan 26, 2007 · Apt 8
Closed — Violation closed
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Jul 22, 2024 · Apt BLDG
Close - Plumbing
Water supply
May 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 9, 2023 · Apt 4
Close - Heat/hot water
Entire building
Apr 9, 2023 · Apt 7
Close - Heat/hot water
Entire building
Apr 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2023 · Apt 7
Close
Show 24 more ↓
- Heat/hot water
Entire building
Apr 7, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 19, 2022 · Apt 2
Close - Unsanitary condition
Pests
Dec 21, 2014 · Apt 7
Close - Nonconst
Smoke detector
Mar 10, 2008 · Apt BLDG
Close - Paint/plaster
Ceiling
Feb 24, 2008 · Apt 4
Close - Paint/plaster
Ceiling
Feb 24, 2008 · Apt 4
Close - Plumbing
Radiator
Feb 24, 2008 · Apt 4
Close - General
Windows
Feb 24, 2008 · Apt 4
Close - Nonconst
Vermin
Feb 24, 2008 · Apt 4
Close - Heating
Heat related
Dec 28, 2007 · Apt 4
Close - Electric
Lighting
Jul 18, 2007 · Apt 4
Close - Electric
Lighting
Jul 18, 2007 · Apt 4
Close - Paint/plaster
Ceiling
Jul 18, 2007 · Apt 4
Close - Paint/plaster
Ceiling
Jan 23, 2007 · Apt 8
Close - Plumbing
Water-leaks
Jan 23, 2007 · Apt 8
Close - General
Cabinet
Jan 23, 2007 · Apt 8
Close - General
Floor
Jan 23, 2007 · Apt 8
Close - Electric
Bell-buzzer/intercom
Jan 23, 2007 · Apt 8
Close - General
Mold
Jan 23, 2007 · Apt 8
Close - General
Mold
Jan 23, 2007 · Apt 8
Close - General
Mold
Jan 23, 2007 · Apt 8
Close - General
Mold
Jan 18, 2007 · Apt 8
Close - General
Mold
Jan 18, 2007 · Apt 8
Close - General
Mold
Jan 18, 2007 · Apt 8
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1930
- Floors
- 4
- Residential units
- 8
- Building area
- 6,400 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1988 / 8
- Assessed value
- $786,600
- Landmark / historic district
- No
HPD registration #323520, last renewed Aug 29, 2025.
Questions about 419 Franklin Avenue
Who owns 419 Franklin Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Taylor Equities NY LLC.
Does 419 Franklin Avenue have violations?
Yes. NYC HPD has recorded 47 housing violations at this property.
Is 419 Franklin Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 419 Franklin Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 419 Franklin Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.