931 Fulton Street is a walk-up apartment building built in 1930 in Brooklyn, 11238. It has 7 residential units across 4 floors. The owner of record is Epaenetus Enterprises INC. HPD has recorded 356 housing violations here, most recently on August 10, 2026. 40 of the 50 most recent violations are still open.
- HPD violations
- 356
- DOB violations
- 21
- ECB violations
- 16
- HPD complaints
- 438
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 356
- CImmediately hazardous
Provide temporary seal up through out entire building
Aug 10, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2023
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2022
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Open — Nov sent out
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 24, 2022
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 9, 2021
Open — Info nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north yard
Sep 24, 2020
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective sidewalk cellar door at building east
Sep 24, 2020
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective paving at sidewalk next to sidewalk vault metal cover at building south
Sep 24, 2020
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 30, 2019
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 17, 2018
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2017
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2016
Open — Info nov sent out - CImmediately hazardous
Provide temporary seal-up for all accessible openings
Apr 28, 2016
Closed — Violation closed - IInformation / order
The premises have been vacated by an order of this department and cannot be reoccupied except for caretaker until a new certificate of occupancy has been obtained.
Apr 20, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Provide temporary seal up for all accessible openings
Apr 20, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at bathrooms and kitchens through-out building
Mar 21, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Provide temporary seal up to all accessible opening through-out building
Mar 21, 2016
Closed — Violation closed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire floor area at cellar
Mar 21, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Properly secure the loose wood treads, 4th-6th up from bottom at public hall, 4th story
Mar 21, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair the broken or defective mortise lock and assembly at building entrance door at public hall, 1st story
Mar 21, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 2nd story
Mar 21, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 2nd story
Mar 21, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Mar 21, 2016 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Mar 21, 2016 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at kitchen and bathroom in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Mar 21, 2016 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all stories public hall.
Mar 4, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at public hall throughout
Feb 22, 2016
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective fire retarding ceiling at public hall, 2nd story
Feb 22, 2016
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at public hall, 2nd story
Feb 10, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color gypsum mortar wall at public hall, 1st story
Feb 1, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective dry wall soffit at public hall, 1st story
Feb 1, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar
Dec 21, 2015
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Dec 21, 2015 · Apt 3
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Dec 21, 2015 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 3, 3rd story, 1st apartment from north at east
Dec 21, 2015 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Dec 21, 2015 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Dec 21, 2015 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Dec 21, 2015 · Apt 3
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection in waste line at sink in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Dec 21, 2015 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water ( 138 degrees) in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Dec 21, 2015 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Dec 21, 2015 · Apt 3
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 9, 2015
Open — First no access to re- inspect violation
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 11 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 4, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active
ECB violations · 16
- Class - 1
Failure to maintain building in code-compliant manner. noted; at time of inspection building has been observed with a/c unit for a 3rd floor apartment w/o proper unit support bracket. this condition poses immed
Oct 7, 2025 · Penalty $12,500
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dob for notice of violation #35016187n issued on 03/14/14 pursuant to 28-204.4 & 1rcny 102-01.rem:file a certificate
May 14, 2014 · Penalty $4,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway noted located at fire escapes at 2nd,3rd and 4th levels obstructed with debris at landings. rmdy: remove obstructions.
Mar 14, 2014 · Penalty $6,000
Active - Class - 2
Failure to comply with the commissioners order to file a certificate of correction with the department of buildings for notice of violation #34916781n issued on 090811 pursuant to 28-204.4 & 1rcny 102-01
Nov 28, 2011 · Penalty $4,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.public hallway sheetrock ceiling partially missing due to on going water leak at ground flr. entrance.wood flr joists exposed,fire rated ceiling missing.remedy:
Nov 4, 2011 · Penalty $2,500
Active - Class - 1
Failure to maintain building exterior wall. defect noted at exposure #3 wall in disrepair water leaking into public hallway holes in wall tree over growth/roofs protruding into portions of wall, missing motio
Sep 8, 2011 · Penalty $5,000
Active - Hazardous
Failure to maintain. noted: door knobs & (handles) are missing from the front main exit door, thus creating hazardous conditions & difficulty opening front door defective hardware. remedy: maintain bldg, repair
Nov 28, 2007
Resolve - Hazardous
Failure to maintain: note: door knobs & handles missing from front main exit door creating a hazardous condition & difficulty in opening front door defective hardware. remedy: maintain bldg- repair front door/
Jul 20, 2007 · Penalty $2,500
Active - Hazardous
Failure to maintain bldg- hazardous. note: at time of insp observed roof leaks over public hallway stairs, in which water from leak is running down stairs thus creating a slippery condition for tenants & public
Mar 2, 2007 · Penalty $2,500
Active - Hazardous
Work w/o a permit. work noted: 2 new hollow metal doors approx 3'w x 7'l w/ metal frame & 2 new steel lintels approx 4'w x 8"d have been installed w/ modification to existing masonry (brick) openings at entry
Jan 9, 2007 · Penalty $2,500
Active
Show 6 more ↓
- Hazardous
Failure to maintain building hazardous defects are roof leak throughout apartment # 6 causing a section of plaster approx 2ftx2ft in rear s/e bedroom and entire livingroom closet ceiling to collapsed also kitch
Jun 4, 2003 · Penalty $800
Active - Hazardous
Failure to maintain building hazardous defects area hallway stairs wall stringers treaders and risers are broken loose sagging and being pullway from each other remedy: repair and or replace stairs forthworth
Jun 4, 2003
Resolve - Non-hazardous
Failure to maintain plublic hall stair case trademark riders are loose and pulling a=out of stringers at verious levels location remedy: make all neccessary safe and lawfull repair immediately and maintain
May 16, 2003 · Penalty $180
Active - Hazardous
Failure to maintian building hazardous - noted : at front of building ( west ) stair case shaking and sagging from 1st floor throughout 4th floor (1) tread and veuser in 2nd second and third floor loose (3) sta
Nov 15, 2002 · Penalty $800
Active - Non-hazardous
Failure to maintain building. noted: at interior building stair case walls (west) bug holes thru 2nd floor - 4th floor. remedy: repair building immediately.
Oct 21, 2002
Resolve - Non-hazardous
Boilers
Feb 26, 1998 · Penalty $350
Active
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 30, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 29, 2016 · Apt 3
Close - Electric
Power outage
Feb 21, 2016 · Apt 3
Close - Heat/hot water
Entire building
Feb 21, 2016 · Apt 3
Close - Plumbing
Water supply
Feb 19, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2016 · Apt 4
Close - Heat/hot water
Entire building
Feb 14, 2016 · Apt 3
Close - Heat/hot water
Apartment only
Feb 8, 2016 · Apt 3
Close - Paint/plaster
Ceiling
Feb 4, 2016 · Apt 1STFL
Close - Paint/plaster
Ceiling
Jan 27, 2016 · Apt 5
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 21, 2016 · Apt 3
Close - Heat/hot water
Entire building
Jan 21, 2016 · Apt 3
Close - Heat/hot water
Entire building
Jan 20, 2016 · Apt 3
Close - Heat/hot water
Entire building
Dec 20, 2015 · Apt 3
Close - Heat/hot water
Entire building
Dec 7, 2015 · Apt 3
Close - Heat/hot water
Apartment only
Dec 4, 2015 · Apt 3
Close - Plumbing
Water supply
Aug 14, 2015 · Apt 6
Close - Plumbing
Toilet
Sep 3, 2014 · Apt 3
Close - Paint/plaster
Ceiling
Sep 3, 2014 · Apt 3
Close - Paint/plaster
Wall
Jun 10, 2014 · Apt BLDG
Close - Plumbing
Water supply
Jun 3, 2014 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Jun 3, 2014 · Apt 2
Close - Safety
Sprinkler
Jun 3, 2014 · Apt 2
Close - Water leak
Heavy flow
May 6, 2014 · Apt 6
Close - Electric
Lighting
May 6, 2014 · Apt 6
Close - Paint/plaster
Wall
Apr 9, 2014 · Apt 6
Close - Paint/plaster
Wall
Apr 9, 2014 · Apt 6
Close - Paint/plaster
Wall
Feb 26, 2014 · Apt 6
Close - General
Floor
Dec 20, 2013 · Apt 6
Close - General
Floor
Nov 19, 2013 · Apt 6
Close - General
Floor
Nov 7, 2013 · Apt 6
Close - Heating
Heat related
Jun 19, 2013 · Apt NA
Close - Heating
Heat related
Nov 27, 2012 · Apt 6
Close - Plumbing
Basin/sink
Sep 18, 2012 · Apt 2
Close - General
Mold
Sep 18, 2012 · Apt 2
Close - Plumbing
Water supply
Sep 18, 2012 · Apt 2
Close - Plumbing
Basin/sink
Sep 18, 2012 · Apt 2
Close - Heating
Heat related
Sep 18, 2012 · Apt 2
Close - Plumbing
Water-leaks
Aug 21, 2012 · Apt 4
Close - General
Floor
Aug 21, 2012 · Apt 4
Close - Plumbing
Water-leaks
Aug 21, 2012 · Apt 4
Close - Paint/plaster
Ceiling
Aug 21, 2012 · Apt 4
Close - General
Floor
Aug 21, 2012 · Apt 3
Close - Paint/plaster
Ceiling
Aug 21, 2012 · Apt 3
Close - Plumbing
Basin/sink
Aug 21, 2012 · Apt 3
Close - Plumbing
Bathtub/shower
Aug 21, 2012 · Apt 3
Close - Plumbing
Toilet
Aug 21, 2012 · Apt 3
Close - Plumbing
Basin/sink
Jul 19, 2012 · Apt 3
Close - Plumbing
Water-leaks
Jul 19, 2012 · Apt 3
Close - Plumbing
Basin/sink
Jul 19, 2012 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1930
- Floors
- 4
- Residential units
- 7
- Building area
- 12,300 ft²
- Lot area
- 3,989 ft²
- Zoning
- R7A
- Community board
- 302
- Council district
- 35
- Block / lot
- 1977 / 27
- Assessed value
- $1,840,950
- Landmark / historic district
- No
HPD registration #364541, last renewed May 15, 2010.
Questions about 931 Fulton Street
Who owns 931 Fulton Street?
The owner of record in NYC Department of City Planning PLUTO data is Epaenetus Enterprises INC.
Does 931 Fulton Street have violations?
Yes. NYC HPD has recorded 356 housing violations at this property.
Is 931 Fulton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 931 Fulton Street built?
City records list 1930 as the year it was built.
How many apartments are in 931 Fulton Street?
It has 7 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.