roofy

78 Herkimer Street

Brooklyn, NY 11216BBL 3-01865-0043Map

Owner of record: Carson Surf, LLC

78 Herkimer Street is a hotel built in 1905 in Brooklyn, 11216. It has 29 residential units across 4 floors. The owner of record is Carson Surf, LLC. HPD has recorded 318 housing violations here, most recently on October 14, 2026. 3 of the 50 most recent violations are still open.

HPD violations
318
DOB violations
34
ECB violations
32
HPD complaints
312

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 318

  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 103, 1st story, 1st apartment from east at south

    Oct 14, 2026 · Apt 103

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules deffective in the entire apartment located at apt 103, 1st story, 1st apartment from east at south

    Oct 14, 2026 · Apt 103

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    May 13, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood molding at east wall at public hall

    Apr 22, 2025

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 404, 4th story, 2nd apartment from south at west

    Apr 22, 2025 · Apt 404

    Closed — Violation dismissed
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at public hall, 3rd story

    Apr 22, 2025

    Closed — Violation closed
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at public hall

    Apr 22, 2025

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 404, 4th story, 2nd apartment from south at west

    Apr 22, 2025 · Apt 404

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors at all stories throughout at public hall

    Apr 22, 2025

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective at ceiling and east wall at public hall

    Apr 22, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and east wall at public hall

    Apr 22, 2025

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall at public hall

    Apr 22, 2025

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall

    Apr 22, 2025

    Closed — Violation closed
  • B

    Provide approved metal screen below skylight at roof

    Apr 22, 2025

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of bikes chained to balusters under stairs at public hall, 3rd story

    Apr 22, 2025

    Closed — Violation closed
  • A

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided.

    Apr 22, 2025

    Closed — Violation closed
  • B

    Provide cover for garbage receptacles at building front

    Apr 22, 2025

    Closed — Violation closed
  • B

    Replace with new the missing metal screen under sky light , 4th story

    Apr 9, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire-retardant material at ceiling and east wall at public hall, 1st story

    Apr 9, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 1st story

    Apr 9, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at laundry room door at public hall, 1st story

    Apr 9, 2025

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of bicycles at public hall, 3rd story

    Apr 9, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 404, 4th story, 2nd apartment from south at west

    Feb 17, 2025 · Apt 404

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective spring balance at lower window sash at north wall in the 2nd room from north located at apt 306, 3rd story, 3rd apartment from south at west

    Feb 17, 2025 · Apt 306

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection at heat and hot water boiler at north wall in the bathroom located at apt 306, 3rd story, 3rd apartment from south at west

    Feb 17, 2025 · Apt 306

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 306, 3rd story, 3rd apartment from south at west

    Feb 17, 2025 · Apt 306

    Open — Defect letter issued
  • B

    Provide dwelling with a janitor or responsible person or janitorial service.

    Aug 21, 2024

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective base cabinet at south wall in the kitchen located at apt 107, 1st story, 3rd apartment from north at east

    Aug 21, 2024 · Apt 107

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective upper and lower sash window at west wall in the 1st room from east located at apt 107, 1st story, 3rd apartment from north at east

    Aug 21, 2024 · Apt 107

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling,north and west walls in the 1st room from east located at apt 107, 1st story, 3rd apartment from north at east

    Aug 21, 2024 · Apt 107

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective intercom system at east wall in the foyer located at apt 107, 1st story, 3rd apartment from north at east

    Aug 21, 2024 · Apt 107

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 202, 2nd story, 2nd apartment from north at east

    Aug 21, 2024 · Apt 202

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective intercom system at west wall in the foyer located at apt 202, 2nd story, 2nd apartment from north at east

    Aug 21, 2024 · Apt 202

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 107, 1st story, 3rd apartment from north at east

    Aug 21, 2024 · Apt 107

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 203, 2nd story, 2nd apartment from north at east

    Apr 1, 2024 · Apt 203

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 203, 2nd story, 2nd apartment from north at east

    Apr 1, 2024 · Apt 203

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 305, 3rd story, 1st apartment from south at west

    Apr 1, 2024 · Apt 305

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 305, 3rd story, 1st apartment from south at west

    Apr 1, 2024 · Apt 305

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective bell buzzer intercommunication system from the building entrance to the panel on the west wall in the foyer located at apt 203, 2nd story, 2nd apartment from north at east

    Apr 1, 2024 · Apt 203

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door. at boiler room

    Apr 1, 2024

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Dec 27, 2023

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 101, 1st story, 1st apartment from north at east

    Dec 27, 2023 · Apt 101

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2023

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection waste line pipe sink in the kitchen located at apt 107, 1st story, 3rd apartment from south at west

    Oct 20, 2023 · Apt 107

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge, fire door leading to laundry room at public hall, 1st story

    Oct 20, 2023

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 107, 1st story, 3rd apartment from south at west

    Oct 20, 2023 · Apt 107

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 107, 1st story, 3rd apartment from south at west

    Oct 20, 2023 · Apt 107

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 107, 1st story, 3rd apartment from south at west

    Oct 20, 2023 · Apt 107

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective fire retardant plaster, east wall and ceiling at public hall, 1st story

    Oct 20, 2023

    Closed — Violation closed

DOB building violations · 34

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
Show 24 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 31, 2007

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 31, 2007

    Dob violation - dismissed
  • Construction other optional

    Work without a permit.work noted:3rd fl rear left apt of a 4 storied brick frame structure gut renovation is taking place with the removal and re-placement of roof,joists & studs area approx 15'x40' remedy:stop all work/obtain permit/make site safe and contact dob at 718/808/3685).before resuming work

    Oct 20, 2006

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Aug 24, 2006

    Vw*-violation - work w/o permit dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 8, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations · 32

  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254, 36. 36.found baxi boiler hydronic system wall hung unit is not registered. register boiler correct all violating condition.submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
Show 22 more ↓
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254, 36. found baxi boiler hydronic system wall hung unit is not registered. register boiler correct all violating condition.submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254, 36. found baxi boiler hydronic system wall hung unit is not registered. register boiler correct all violating condition.submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit s not regist ered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    254, 36. found baxi boiler hydronic system wall hung unit is not egistered. register boiler correct all violating condition.submit ertificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    B254,36. found baxi boiler hydrone system wall hung unit is not registered.register boiler and correct all violation, submit certificate of correction.

    Aug 21, 2017 · Penalty $500

    Active
  • Class - 2

    As per class 2 (b265) 28-303.7, failure to file a complete boiler insp report as per dob records. submit a current bo-9 report.

    Apr 3, 2017 · Penalty $500

    Active
  • Hazardous

    Failure to maintain exterior building wall. defects noted: chimney at west wall is eroded and cracked mortar joints are messey, chimney is out of plumb approx 10". remedy: repair defects make safe.

    Apr 22, 2002 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain building defect is west chimney (boiler) leaning approx 4" to the west. remedy: repair chimney.

    Jan 8, 1998 · Penalty $2,500

    Active
  • Non-hazardous

    36, 10a, 38, 32, 21. push nipple leaking

    Jun 21, 1993 · Penalty $200

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 16, 2026 · Apt 203

    Close
  • Unsanitary condition

    Pests

    Jul 31, 2025 · Apt 301

    Close
  • General

    Cabinet

    Jul 31, 2025 · Apt 301

    Close
  • Paint/plaster

    Wall

    Jul 31, 2025 · Apt 301

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 24, 2025 · Apt BLDG

    Close
  • Electric

    No lighting

    Mar 20, 2025 · Apt BLDG

    Close
  • General

    Signage missing

    Mar 20, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 19, 2025 · Apt 201

    Close
  • Heat/hot water

    Apartment only

    Feb 26, 2025 · Apt 201

    Close
  • General

    Mailbox

    Feb 26, 2025 · Apt 201WHO

    Close
Show 40 more ↓
  • General

    Bell/buzzer/intercom

    Feb 26, 2025 · Apt 201WHO

    Close
  • Heat/hot water

    Apartment only

    Feb 15, 2025 · Apt 404

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2025 · Apt 207

    Close
  • General

    Mailbox

    Jan 17, 2025 · Apt 206

    Close
  • Unsanitary condition

    Pests

    Dec 29, 2024 · Apt 306

    Close
  • Safety

    Smoke detector

    Dec 27, 2024 · Apt 201

    Close
  • General

    Ventilation system

    Dec 27, 2024 · Apt 403

    Close
  • Safety

    Fire escape

    Dec 27, 2024 · Apt 403

    Close
  • Door/window

    Door

    Dec 27, 2024 · Apt 403

    Close
  • General

    Bell/buzzer/intercom

    Dec 27, 2024 · Apt 403

    Close
  • Appliance

    Electric/gas range

    Dec 27, 2024 · Apt 403

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2024 · Apt 201

    Close
  • General

    Bell/buzzer/intercom

    Dec 27, 2024 · Apt 201

    Close
  • Door/window

    Window frame

    Dec 27, 2024 · Apt 403

    Close
  • Door/window

    Door

    Dec 17, 2024 · Apt BLDG

    Close
  • Plumbing

    Radiator

    Dec 4, 2024 · Apt 201

    Close
  • Heat/hot water

    Apartment only

    Dec 4, 2024 · Apt 201

    Close
  • Heat/hot water

    Apartment only

    Dec 4, 2024 · Apt 201

    Close
  • General

    Bell/buzzer/intercom

    Nov 30, 2024 · Apt 306

    Close
  • Heat/hot water

    Apartment only

    Nov 30, 2024 · Apt 306

    Close
  • Water leak

    Slow leak

    Nov 30, 2024 · Apt 306

    Close
  • Door/window

    Window frame

    Nov 30, 2024 · Apt 306

    Close
  • General

    Bell/buzzer/intercom

    Oct 2, 2024 · Apt 306

    Close
  • General

    Janitor/super

    Jul 25, 2024 · Apt 301

    Close
  • Paint/plaster

    Ceiling

    Jul 9, 2024 · Apt 107

    Close
  • General

    Bell/buzzer/intercom

    Jul 9, 2024 · Apt 107

    Close
  • Electric

    Wiring

    Jul 9, 2024 · Apt 107

    Close
  • General

    Bell/buzzer/intercom

    Jun 25, 2024 · Apt 204

    Close
  • General

    Bell/buzzer/intercom

    Jun 7, 2024 · Apt 202

    Close
  • Water leak

    Slow leak

    Jun 7, 2024 · Apt 202

    Close
  • Unsanitary condition

    Mold

    Jun 7, 2024 · Apt 202

    Close
  • Door/window

    Window frame

    Jun 2, 2024 · Apt 207

    Close
  • Door/window

    Window frame

    Jun 1, 2024 · Apt 207

    Close
  • Unsanitary condition

    Pests

    Jun 1, 2024 · Apt 207

    Close
  • General

    Bell/buzzer/intercom

    May 15, 2024 · Apt 207

    Close
  • Unsanitary condition

    Pests

    May 15, 2024 · Apt 207

    Close
  • Safety

    Fire escape

    May 11, 2024 · Apt BLDG

    Close
  • Door/window

    Door

    May 11, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    May 7, 2024 · Apt ALL

    Close
  • General

    Bell/buzzer/intercom

    May 7, 2024 · Apt ALL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H6)
Year built
1905
Floors
4
Residential units
29
Building area
11,200 ft²
Lot area
8,500 ft²
Zoning
R6B
Community board
303
Council district
36
Block / lot
1865 / 43
Assessed value
$1,204,200
Landmark / historic district
No

HPD registration #342383, last renewed Jul 23, 2026.

Questions about 78 Herkimer Street

Who owns 78 Herkimer Street?

The owner of record in NYC Department of City Planning PLUTO data is Carson Surf, LLC.

Does 78 Herkimer Street have violations?

Yes. NYC HPD has recorded 318 housing violations at this property.

Is 78 Herkimer Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 78 Herkimer Street built?

City records list 1905 as the year it was built.

How many apartments are in 78 Herkimer Street?

It has 29 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.