Violations at 11 New York Avenue
Brooklyn, NY 11216 · BBL 3-01862-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
The newest 50 of 114 DOB violations. The city keeps the complete history.
- Construction other optional
Failure to maintain bldg. observed @ exp 1, long vertical crack on column & missing mortar joints. at exp 2, missing glass panel & spalling stucco @ parapet. at exp 3, loose brick on first floor with damaged mortar joints & spalling bricks. at exp 4, damaged window sill & spalling brick & loose roof panel. remedy:repair and/or replace
Aug 31, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner. exposure 1 deflated window lintel,crack column on first floor. open mortar joints & crack corner of exp1&exp4. exp2 missing glass panel, crack at parapet. exp3, loose bricks on first floor exit. exp4 loose roof panel and damaged window sills. remedy: repair and/or replace
Nov 10, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Construction other optional
Expsd&corrdd conc slab reinforcmnt.w spalled conc cvr on roof.20'x40' approximty,in.front sprinklr rm,expsd&corrdd beams,girders,missng conc encasmnt,water issue caused damages observd.previous repair,temp tarps failed.remedy:immedite shore down2cellar strctrly compro elemnts under nys pe.submit s/s rpt w photos by 5/15.ensure egress protctd.ovrhead
Jun 12, 2023
Dob violation - active - Construction other optional
Expsd&corrdd conc slab w spalled conc cvr on roof,approximty20'x40' in front sprinklr rm,beams,girders,columns expsd,corrdd.missng conc encasmnt,cracks,water issue,repairs&temp measures failing retain nys rdp 2 prepare repair plan 4 all damage.&structrl file rpr by 7/28 & rpr wrk to start by permit by 8/25/23
May 24, 2023
Dob violation - active - Construction other optional
C-construction other optional
May 12, 2023
Dob violation - active - Construction other optional
Spalling concrete at cellar with exposed rebars at various areas of the garage. rusted metal beams,missing mortar between joints,plumbing leak throughout the garage.
Apr 26, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 9, 2021
Dob violation - active - Immediate emergency anythingoptional
Immediately provided sidewalk shed at exposure 3 (south elevation) approximately 140 linear feet and exposure 4(west elevation)225 linear feet
Mar 19, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 11, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 29, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - active
ECB violations
The newest 50 of 61 ECB violations. The city keeps the complete history.
- Class - 1
Unlawful acts. failure to comply with commissioner's order. as noted respondent failure to comply with previously written violation #35730079y on 04/30/2026, which requires respondent to provide adequate safety
Jul 15, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain parking structure in safe condition. at time of inspection on an occupied parking structure consisting of 1 level below building cellar level, observed cracked concrete column/spalling beam
Apr 30, 2026 · Penalty $25,000
Active - Class - 1
Failure to maintain building in code compliant matter. noted: in garage, cellar level load bearing brick and mortar wall is missing joint mortar and water leaks throughout., repair and/replace
Nov 21, 2025 · Penalty $2,530
Active - Class - 1
Unlawful acts. failure to comply with commissioner's order for vio 23-01716 dated 04/26/2023. previous summons 37025560j issued for same conditions., comply with commissioner's order
Nov 21, 2025 · Penalty $6,250
Active - Class - 1
Failure to maintain parking structure in safe condition. as noted at time of inspection on an occupied parking structure consisting of 1 level below building cellar cellar level, observed cracked concrete at co
May 10, 2025 · Penalty $2,500
Resolve - Class - 2
Bc 3307.6.5.1 safe condition - at the time of my inspection i observed the parapet panel on the sidewalk shed was dislodged and in danger of falling which creates a hazardous unsafe condition for members of t
Nov 20, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $2,500
Active - Class - 1
Failure to comply with the commissioner's order in dob violation vio23-01716,dated 4/26/2023.respondent was required to submit an engineer'sreport concerning structurally deficient conditions.as of 10/11/2023,a
Oct 11, 2023 · Penalty $12,500
Active - Class - 2
Failure to maintain building wall(s)in code compliant manner.note:at the time of inspection observed at exposure#1 north elevation and expo#4 west elevation(new york ave)deteriorating mortar joint at several lo
Apr 28, 2023 · Penalty $625
Active - Class - 2
Failure to maintain building walls in code compliant manner.note at the time of inspection observed at exp1 north elevation and exp4 west elevation(new york ave)deteriorated mortar joint at several locations.re
Apr 28, 2023
Resolve - Class - 1
Spalling concrete at cellar with exposed rebars at various areas of the garage. rusted metal beams,missing mortar between brick joints, plumbing leak throughout the parking garage., repair and/replace; make nec
Apr 26, 2023 · Penalty $6,250
Active - Class - 2
Failure to submit acceptable required cycle8c report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#814718.agg1:prior nov37018408j under28-302.4 sub
Oct 19, 2022
Resolve - Class - 2
Temporary construction equipment onsite-expired permit.at time of inspection observed sidewalk shed installed at exp4 south with equipment permit#b00494938-i1-sh expired in dob now on 4/5/2022.stop all work on
Jun 13, 2022 · Penalty $1,280
Resolve - Class - 2
Failure to maintain bldg in codecompliant manner.noted:atoi i observedon exp1,3,4 cracks,damaged mortar joints;spalling bricks&mortar joints.exp3,spalling coping;spalling brick&mortar joints on 5fl&several othe
May 7, 2021 · Penalty $625
Active - Class - 1
Failure to maintain building in a code compliant manner.as noted:exposure1 open mortar joints fulton street facade.3 spalled coping stones daaged mortar joints,spalled window sills exposure 4 open mortar joint
Mar 11, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#814718.rem:submit acceptable required t
Feb 13, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000004843 has been inspected, tested & disinfected & that a maintenance plan has been developed & implemented by 11/1/2016. rem: file annual certificatio
Jun 20, 2017 · Penalty $10,000
Active - Class - 2
Altered/changed bldg occupied w/o a valid cofo as per 28-118.3.1;28-118.3.2 observed daycare center in operation on herkimer st entrance at 1st fl.w/approx 20 students and 5 staff w/o valid cofo#301925843t01t
May 15, 2017 · Penalty $2,500
Active - Class - 2
Exit door not self closing. exit door to common hall. noted: fpsc door not self closing. rem: comply w/ code.
May 3, 2017 · Penalty $2,500
Active - Class - 2
Fail to maintain bldg in code compliant manner.@ basement @ public parking garage,there is a large pile of rubble @ const debris @ the rear of garage @ sub cellar.rem:remove debris.
Jul 18, 2014 · Penalty $200
Active - Class - 1
Fail to comply w/commissioner's order contained in nov #35084677k issued on 01/11/14. removed section of concrete floor slab w/o permit. rem:comply w/commissioner's order.
Mar 15, 2014 · Penalty $2,400
Resolve - Class - 1
Work w/o permit. noted: at main entrance to parking garage a section of concrete flr slab removed approx 10' x 10' w/o permits or filing. no permits posted or filed full swo issued pursuant to 28-207.2 & post
Jan 11, 2014 · Penalty $1,600
Resolve - Class - 2
Failure to maintain. note: 1. spalling & cracked concrete w/exposed rebar at ceilings of garage w/water penetration. 2. exit light illumination at rear exit not operating. remedy: maintain/repair defects noted.
Jan 11, 2014 · Penalty $250
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34823764z issued on 12/4/09 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Jul 19, 2012 · Penalty $800
Resolve - Class - 1
Failure to comply with the commissioner's order contained in notice ofviolation #34823764z issued on 12-4-09. rem:comply with the commissioner's order.
Mar 6, 2012 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34823762p issued on 12.4.09. remedy: comply w/the commissioner's order.
Mar 6, 2012 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34823762p issued on 12.4.09. severe spalling of garage, concrete ceiling throughout. this condition aggravated by water penetration of ceiling.
Dec 20, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34823764z issued on 12.4.09. failure to maintain garage (cellar). 1) excessive water leaks from flr above. 2) exposed electrical wiring at garage
Dec 20, 2011 · Penalty $24,000
Resolve - Class - 2
Failure to maintain building in code compliant manner. noted: approximately seven masonry columns, in cellar garage area, are structurally damaged. this is possibly due parking of vehicles. remedy: repair & or
Dec 20, 2011 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner: illumination for exits, exit discharges & public corridors per bc 1006.1;27-381. noted: @garage exit, there is no functional lighting. the four lights are
Dec 20, 2011 · Penalty $5,000
Resolve - Class - 2
Altered/changed building occupied without a valid certificate of occupancy as per 28-118.3.1 & 28-118.3.2.noted: tco#301925843t008 expired 09/10/11 & has not been renewed. building is fully occupied. remedy obt
Dec 20, 2011 · Penalty $300
Active - Class - 2
Fail to maintain illumination for exits signs defective.rem:repair/replace exit signs
Dec 4, 2009 · Penalty $250
Active - Class - 1
Fail to maintain noted:water pending excessively inside garage also exposed wiring throughout defective lighting fixtures also excessive amount of debris @ rear of garage concrete garage wood.rem:make safe!!!!!
Dec 4, 2009 · Penalty $1,200
Resolve - Class - 1
Fail to provide unobstructed passageway noted:scaffold obstructing exit drs inside garage.rem:remove obstruction
Dec 4, 2009 · Penalty $1,200
Resolve - Class - 1
Fail to maintain noted@severe spalling of concrete ceiling exposing rebar,large concrete pc leading to lower level structural crack on bathsides also water pentration throughout ceiling.rem:make safe!
Dec 4, 2009 · Penalty $1,000
Resolve - Hazardous
Failed to notify the dob prior to the use or installation of "c" hooks or outrigger beams in connection w/suspended scaffolds.
Feb 4, 2008 · Penalty $500
Active - Non-hazardous
Altered bldg occupied w/o a valid c of o. note: job #301925843, alt 1 has obtained temporary c of o #301925843t003, bldg now occupied w/tco expired 3/5/07 (tco #301925843t003). remedy: obtain valid c of o.
Dec 27, 2007 · Penalty $180
Active - Non-hazardous
Exit door total obstruction note: exit door @ south stairwall (w/ pankbar) is jammed frozen & inoperable does not open. remedy: remove obsruction make door operate for egress.
Dec 27, 2007
Resolve - Non-hazardous
Failure to maintain: note: concrete ceiling/beams throughout garage has water penetration cracking & loose ceiling panels. loose & missing blocks @ south exist strairwell. remedy: maintain bldg.
Dec 27, 2007
Resolve - Hazardous
Failure to provide adequate protection for side walks and walkways during construction operations note at time of inspection work was in progress demmolishing masonary block wall at 1st story front facade as a
Oct 7, 2005 · Penalty $2,000
Resolve - Non-hazardous
83x10 (83) restore to service so a full inspection can be made
Jul 27, 2004 · Penalty $2,500
Resolve - Non-hazardous
31h11 11b10 23i11 (11) car does not respond on car calls (23) 5 floor hall button
Jul 27, 2004 · Penalty $2,500
Resolve - Non-hazardous
83x10 15b07 09i10 11i11 (83)restore to service so a full insp can be made (15)post certificate in car as per rule 27-1004 (11)lobby button
Jul 27, 2004 · Penalty $2,500
Resolve - Non-hazardous
17,h,11,10,h,11,66,y,02
May 27, 2003 · Penalty $350
Resolve - Non-hazardous
85,bb,05,86,m,07,63,m,07,17,h,11 63 main line
May 27, 2003 · Penalty $350
Resolve - Non-hazardous
85,bb,05 86,m,07,51,k,11,63,m,07,11,m,07,84,m,07,17,h,11 63 main line 11 1 fl 84 facial plates
May 27, 2003 · Penalty $350
Resolve - Non-hazardous
73x11,75u05. (730 restore to service so an inspection can be made.
Oct 19, 2000 · Penalty $350
Resolve - Non-hazardous
75u05,
Oct 19, 2000 · Penalty $350
Resolve - Non-hazardous
Sidewalk shed does not meet building code specifications: defect is: side towards building at west not sealed. remedy: sealed side towards west side as indicated above forthwith.
Dec 6, 1999 · Penalty $2,000
Resolve - Hazardous
Failure to maintain exterior building wall hazardous defect is first story west wall bulging approx. 3 inches out of plumb at the north section with eroded & missing mortar joints(2) second story north wall.
Dec 6, 1999
Resolve