224 Madison Street
Brooklyn, NY 11216BBL 3-01823-0012Map
Owner of record: Simon-Ebughu, Kechipetronilla
224 Madison Street is a two-family home built in 2000 in Brooklyn, 11216. It has 2 residential units across 3 floors. The owner of record is Simon-Ebughu, Kechipetronilla. HPD has recorded 26 housing violations here, most recently on April 19, 2016. 21 of the 26 most recent violations are still open.
- HPD violations
- 26
- DOB violations
- 1
- ECB violations
- 0
- HPD complaints
- 31
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- ANon-hazardous
Properly repair with similar material the broken or defective ........base at the kitchen lower cabinet in the kitchenette located at apt topfl, 3rd story, 1st apartment from south at west
Apr 19, 2016 · Apt TOPFL
Closed — Violation closed - ANon-hazardous
Properly repair and abate unsafe electric wiring condition consisting of .........unprotected hanging wires at west wall in the kitchenette located at apt topfl, 3rd story, 1st apartment from south at west
Apr 19, 2016 · Apt TOPFL
Closed — Violation closed - ANon-hazardous
Replace with new the missing ....window sill at 2nd window from west at north in the 1st room from north located at apt topfl, 3rd story, 1st apartment from south at west
Apr 19, 2016 · Apt TOPFL
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ...ceramic floor tiles in the kitchenette located at apt topfl, 3rd story, 1st apartment from south at west
Apr 19, 2016 · Apt TOPFL
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective ....frame at lower sash window in the 4th room from north at west located at apt topfl, 3rd story, 1st apartment from south at west
Apr 19, 2016 · Apt TOPFL
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electricity wires at the west wall in the kitchen located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at the west wall in the kitchen located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles on the floor in the kitchen located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing bottom shelf at the base cabinet at the sink in the kitchen located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out
Show 16 more ↓
- BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the window stool at north 3 in the 1st room from north located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit the upper and lower sashes at north 3 window in the 1st room from north located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Not complied with - BHazardous
Replace with new the broken or defective mechanical ventilator at the ceiling in the bathroom located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly secure the loose electrical outlet on the east wall in the private hallway located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt topfl, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt TOPFL
Open — Nov sent out - BHazardous
Properly repair the broken or defective base board radiator at the east wall in the 4th room from north at west located at apt topfl, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt TOPFL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt topfl, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt TOPFL
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at west wall in the kitchen located at apt topfl, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt TOPFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen located at apt topfl, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt TOPFL
Open — Nov sent out - BHazardous
Properly secure the loose casing at the door in the entrance located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the 3rd room from north at east located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the 4th room from north at east located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the 4th room from north at west located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the bathroom located at apt 2, 3rd story, 1st apartment from south at west
Apr 11, 2016 · Apt 2
Open — Nov sent out
DOB building violations · 1
- Construction other optional
C-construction other optional
Sep 21, 1994
Vp*-violation unserved ecb- dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Mar 21, 2026 · Apt 1
Close - Flooring/stairs
Floor
Mar 21, 2026 · Apt 1
Close - Paint/plaster
Wall
Mar 21, 2026 · Apt 1
Close - Plumbing
Water supply
Mar 21, 2026 · Apt 1
Close - Plumbing
Toilet
Jun 24, 2025 · Apt 1
Close - General
Cabinet
Jun 24, 2025 · Apt 1
Close - Plumbing
Bathtub/shower
Jun 24, 2025 · Apt 1
Close - Electric
Wiring
Apr 5, 2016 · Apt 2
Close - Electric
Outlet/switch
Apr 5, 2016 · Apt 2
Close - Electric
No lighting
Apr 5, 2016 · Apt 2
Close
Show 21 more ↓
- Flooring/stairs
Floor
Apr 5, 2016 · Apt 2
Close - General
Cabinet
Apr 5, 2016 · Apt 2
Close - Unsanitary condition
Mold
Apr 5, 2016 · Apt 2
Close - Unsanitary condition
Pests
Apr 5, 2016 · Apt 2
Close - Unsanitary condition
Pests
Apr 5, 2016 · Apt 2
Close - Unsanitary condition
Pests
Apr 5, 2016 · Apt 2
Close - Door/window
Window frame
Apr 5, 2016 · Apt 2
Close - Door/window
Door frame
Apr 5, 2016 · Apt 2
Close - Unsanitary condition
Mold
Apr 4, 2016 · Apt TOPFL
Close - Unsanitary condition
Pests
Apr 4, 2016 · Apt TOPFL
Close - Unsanitary condition
Pests
Apr 4, 2016 · Apt TOPFL
Close - Unsanitary condition
Pests
Apr 3, 2016 · Apt TOPFL
Close - Appliance
Electric/gas range
Apr 3, 2016 · Apt TOPFL
Close - General
Cabinet
Apr 3, 2016 · Apt TOPFL
Close - Water leak
Slow leak
Apr 3, 2016 · Apt TOPFL
Close - Electric
Power outage
Apr 3, 2016 · Apt TOPFL
Close - Paint/plaster
Window/frame
Apr 3, 2016 · Apt TOPFL
Close - Flooring/stairs
Floor
Apr 3, 2016 · Apt TOPFL
Close - Door/window
Window frame
Apr 3, 2016 · Apt TOPFL
Close - Safety
Smoke detector
Apr 3, 2016 · Apt TOPFL
Close - Safety
Carbon monoxide detector
Apr 3, 2016 · Apt TOPFL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 2000
- Floors
- 3
- Residential units
- 2
- Building area
- 2,925 ft²
- Lot area
- 1,875 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1823 / 12
- Assessed value
- $78,180
- Landmark / historic district
- No
Questions about 224 Madison Street
Who owns 224 Madison Street?
The owner of record in NYC Department of City Planning PLUTO data is Simon-Ebughu, Kechipetronilla.
Does 224 Madison Street have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 224 Madison Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 224 Madison Street built?
City records list 2000 as the year it was built.
How many apartments are in 224 Madison Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.