roofy

1147 Bedford Avenue

Brooklyn, NY 11216BBL 3-01822-0010Map

Owner of record: 1147 Bedford Owner LLC

1147 Bedford Avenue is a walk-up apartment building built in 1910 in Brooklyn, 11216. It has 8 residential units across 4 floors. The owner of record is 1147 Bedford Owner LLC. HPD has recorded 31 housing violations here, most recently on May 1, 2026. 1 of the 31 most recent violations are still open.

HPD violations
31
DOB violations
29
ECB violations
19
HPD complaints
68

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 31

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective enamel glaze at bath tub in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north

    Jun 5, 2015 · Apt 2A

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2a, 2nd story, 1st apartment from west at north

    Jun 5, 2015 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north

    Jun 5, 2015 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north

    Jun 5, 2015 · Apt 2A

    Closed — Violation dismissed
  • C

    Remove all obstructions and repair all defects in wash basin in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north

    Jun 5, 2015 · Apt 2A

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1, 2nd story, 1st apartment from west at north

    Apr 13, 2015 · Apt 1

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water temperature exceeds the maximum of 130 degrees f. observed temperature: 140 degrees f, in the fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from west at north

    Apr 13, 2015 · Apt 1

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing located at apt 1, 2nd story, 1st apartment from west at north

    Apr 13, 2015 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2fl, 2nd story

    Sep 25, 2003 · Apt 2FL

    Closed — Violation dismissed
Show 21 more ↓
  • B

    Abate the nuisance consisting of concealed water leak ceiling in the bathroom located at apt 2fl, 2nd story

    Sep 25, 2003 · Apt 2FL

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective plaster ceiling at public hall, 2nd story

    Sep 17, 2003

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2fl, 2nd story

    Sep 17, 2003 · Apt 2FL

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of evidence of a concealed water leak at the ceiling in the bathroom located at apt 2fl, 2nd story

    Sep 17, 2003 · Apt 2FL

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective light fixture at north wall in the bathroom located at apt 2, 3rd story

    Jun 21, 2003 · Apt 2

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 3rd story

    Jun 21, 2003 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection at wasteline of washbasin in the bathroom located at apt 2, 3rd story

    Jun 21, 2003 · Apt 2

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 3rd story

    Jun 21, 2003 · Apt 2

    Closed — Violation dismissed
  • A

    Refit door in the bathroom located at apt 2, 3rd story

    Jun 21, 2003 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceilings and walls throughout in the entire apartment located at apt 2, 3rd story

    Jun 21, 2003 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective floor cabinet in the kitchen located at apt 2, 3rd story

    Jun 21, 2003 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective door jam and door knob in the entrance located at apt 2fl, 2nd story

    Jun 17, 2003 · Apt 2FL

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective upper and lower window sashes center room and in the kitchen located at apt 2fl, 2nd story

    Jun 17, 2003 · Apt 2FL

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective ceiling light fixture in the bathroom located at apt 2fl, 2nd story

    Jun 17, 2003 · Apt 2FL

    Closed — Violation dismissed
  • A

    Refit apartment entrance door; located at apt 1, 2nd story

    Mar 7, 2003 · Apt 1

    Closed — Violation dismissed
  • A

    Refit west window; in the 2nd room from east located at apt 1, 2nd story, apartment at north

    Mar 7, 2003 · Apt 1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the walls and ceilings; at public hall

    Mar 7, 2003

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retarding ceiling; at public hall, 1st story

    Mar 7, 2003

    Closed — Violation dismissed
  • A

    Provide a proper screw cap for the cleanout of trap 2 uncapped traps; at cellar

    Mar 7, 2003

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the walls and ceilings; in the entire apartment located at apt 1, 2nd story, apartment at north

    Mar 7, 2003 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling; in the bathroom located at apt 1, 2nd story, apartment at north

    Mar 7, 2003 · Apt 1

    Closed — Violation dismissed

DOB building violations · 29

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Construction other optional

    The borough commissioner has order all work stopped immediately under application # 321931889 due to the contractor withdrawal.

    Jun 14, 2023

    Dob violation - dismissed
  • Construction other optional

    The borough commissioner has order all work stopped immediately under application # 321931889 due to the contractor withdrawal.

    Jun 14, 2023

    Dob violation - dismissed
  • Construction other optional

    License suspension of gc # 612955.

    May 24, 2023

    Dob violation - dismissed
  • Construction other optional

    License suspension of gc # 612955.

    May 24, 2023

    Dob violation - dismissed
Show 19 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Sep 14, 2022

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 14, 2022

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 25, 2022

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 25, 2022

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 30, 2022

    Dob violation - dismissed
  • Construction other optional

    The borough commission has ordered all work stop under application # 321400079 immediately due to the permit holder of record has withdrawn from the project, stop all work and make site safe.

    Apr 19, 2022

    Dob violation - dismissed
  • Construction other optional

    The borough commission has ordered all work stop under application # 321400079 immediately due to the permit holder of record has withdrawn from the project, stop all work and make site safe.

    Apr 19, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 28, 2021

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 4, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 4, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 24, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 23, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 23, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 23, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed

ECB violations · 19

  • Class - 2

    Observed vertical enlargement, building extended from existing 3 story building to 5 story. observed all exterior, concrete, steel reinforcement work is completed and building is topped off. upon review depart

    Jun 9, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection observed active ongoing facade styrofoam installation work. pieces of styrofoam found on the air, pedestrian sidewalk and cars around. stop all facade work., maintain adequate construction

    Jun 6, 2022 · Penalty $625

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification-sidewalk shed not maintained as required.note:at time of inspection observed sidewalk shed installed on pedestrian walkway at exp #1 and #2 are not maintai

    Aug 14, 2021 · Penalty $2,400

    Resolve
  • Class - 2

    Sidewalk shed parapet note at the time of my inspection of an alteration 5 story buildingi observed sidewlak shed erected at exposure 1 and 2 i also observed that there were 2 portions of approxmately 1 foot ea

    Mar 23, 2021 · Penalty $5,000

    Resolve
  • Class - 2

    Sidewalk shed parapet information panel note at the time of my inspection of an alteration 5 story building i observed a sidewlak shed erected at exposure 1 and 2 i also observed that were no sidewlak shed para

    Mar 23, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Project information panel-construction sign not provided at sidewalk shed. note: at time of my inspection of a 3 sty bldg at 3 sty stage. nowork in progress,i observed that the sidewalk shed parapet panel throu

    Mar 17, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Temporary construction equipment on site w/expired permit supported scaffolding.note:at the time of my inspection of a 3 story unoccupied bldg an inactive job site,upon review of dept records it was revealed th

    Feb 4, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Bc3314.4.8 maintainance scaffolds all complaints attachments to the scaffold shall be maintained in a good condition.note:at the time of my inspection of a 3 story unoccupied bldg an inactive job site,i observe

    Feb 4, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements.note:at the time of my inspection of a 3 story unoccupied bldg an inactive job site.i observed on exp#1 & exp#2 along the sidewalk that the sno

    Feb 4, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.note:at the time of my inspection of a 3 story unoccupied bldg an inactive job site.i observed a sidewalk shed erected on exp.#1 & exp.#2 the horizontal

    Feb 4, 2021 · Penalty $2,400

    Resolve
Show 9 more ↓
  • Class - 1

    Bc3314.1 scaffolding utilized in conjunction w/construction of a bldg or structure shall be maintained so that the public & property will not be endangered of fallng or collapse.note:at the time of my inspectio

    Feb 4, 2021 · Penalty $6,250

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. at time of inspection observed a sidewalk shed in place at exp1. during inspection noted that the sidewalk shed does not cover the 5'and return to the

    Jul 20, 2019 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 3309.1 no overhead protection for adjacent property. at time of inspection i observed exterior work being done at exp#3,4 directly above adjacent property parking lot & no overhead protection installed to

    Jun 4, 2019 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping. at time of inspection i observed large amount of debris at 1st sty that create tripping hazard,could create rodent infestation & obstruct means of egress in case of

    Jun 4, 2019 · Penalty $6,250

    Resolve
  • Class - 1

    3314.1 scaffold not maintained as per code. at time of inspection observed 20 foot high section of supported exposure #1 on top of sidwalk shed and approximately 20 foot high section on top of sws @ exposur

    May 4, 2019 · Penalty $6,250

    Resolve
  • Class - 1

    Work does not conform to design drawings.@ time of inspection, i observed @ exp#1&2 scaffold constructed on sidewalk shed w/o approved construction documents scaffold wasn't fully planted,lack egress & was not

    Oct 30, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3301.6 failure to provide design drawings.@ time of inspection on anactive jobsite i observed @ exp#3 2fl level a make shift hoist installed.upon request of design drawings no access to site was provided crea

    Oct 30, 2018

    Resolve
  • Class - 2

    Failure of permit holder to provide inspection access to and/or exposeongoing construction or work on an active and permitted worksite. at time of inspection an attempt was made by me(inspector young) to access

    Oct 30, 2018

    Resolve
  • Class - 1

    Bc 3307.6.3 failure to provide side walk shed where required @ time ofinspection on a 3 sty structure approx 41ft high i observed @ exp1 sidewalk shed was inadequatley installed only extends 2 ft past property

    Oct 30, 2018

    Resolve

Complaints

  • General

    Bell/buzzer/intercom

    Jun 29, 2026 · Apt 4F

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2016 · Apt 1

    Close
  • Plumbing

    Water supply

    Feb 18, 2016 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2016 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jun 4, 2015 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Apr 9, 2015 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2015 · Apt 1FLR

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2015 · Apt 1FL

    Close
  • Heat/hot water

    Entire building

    May 3, 2014 · Apt 1FL

    Close
  • Heat/hot water

    Entire building

    May 2, 2014 · Apt 1

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    May 2, 2014 · Apt 1FL

    Close
  • Plumbing

    Water supply

    May 1, 2014 · Apt 1FL

    Close
  • Heating

    Heat related

    Jan 20, 2014 · Apt NA

    Close
  • Heating

    Heat related

    Jan 18, 2014 · Apt 1FL

    Close
  • Heating

    Heat related

    Jan 9, 2014 · Apt NA

    Close
  • Heating

    Heat related

    Jan 3, 2014 · Apt 1

    Close
  • Heating

    Heat related

    Jan 3, 2014 · Apt 1FL

    Close
  • Heating

    Heat related

    Dec 23, 2013 · Apt 1FL

    Close
  • Heating

    Heat related

    Dec 23, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Dec 14, 2013 · Apt 1FL

    Close
  • Heating

    Heat related

    Dec 14, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Dec 13, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Dec 6, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Dec 5, 2013 · Apt 1STFL

    Close
  • Heating

    Heat related

    Dec 3, 2013 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 2, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Dec 2, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Nov 30, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Nov 30, 2013 · Apt 1FLR

    Close
  • Heating

    Heat related

    Nov 30, 2013 · Apt 1

    Close
  • Heating

    Heat related

    Nov 30, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Nov 30, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Nov 28, 2013 · Apt 1FL

    Close
  • Heating

    Heat related

    Sep 25, 2007 · Apt 2FL

    Close
  • Heating

    Heat related

    Nov 4, 2006 · Apt 1FL

    Close
  • Heating

    Heat related

    Nov 3, 2006 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Nov 3, 2006 · Apt 1FL

    Close
  • Heating

    Heat related

    Oct 31, 2006 · Apt 1

    Close
  • Heating

    Heat related

    Oct 31, 2006 · Apt 1FL

    Close
  • Heating

    Heat related

    Oct 28, 2006 · Apt 1

    Close
  • Heating

    Heat related

    Oct 28, 2006 · Apt 1

    Close
  • Heating

    Heat related

    Oct 25, 2006 · Apt 1FL

    Close
  • Heating

    Heat related

    Apr 11, 2006 · Apt BLDG

    Close
  • Heating

    Heat related

    Apr 10, 2006 · Apt 1FL

    Close
  • Heating

    Heat related

    Apr 9, 2006 · Apt BLDG

    Close
  • Heating

    Heat related

    Apr 7, 2006 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 23, 2006 · Apt 1

    Close
  • Heating

    Heat related

    Dec 14, 2003 · Apt 2FL

    Close
  • Heating

    Radiator

    Dec 14, 2003 · Apt 2FL

    Close
  • Electric

    Electric-supply

    Sep 23, 2003 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1910
Floors
4
Residential units
8
Building area
6,447 ft²
Lot area
2,000 ft²
Zoning
R6A
Community board
303
Council district
36
Block / lot
1822 / 10
Assessed value
$774,450
Landmark / historic district
No

HPD registration #825216, last renewed Aug 15, 2025.

Questions about 1147 Bedford Avenue

Who owns 1147 Bedford Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1147 Bedford Owner LLC.

Does 1147 Bedford Avenue have violations?

Yes. NYC HPD has recorded 31 housing violations at this property.

Is 1147 Bedford Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1147 Bedford Avenue built?

City records list 1910 as the year it was built.

How many apartments are in 1147 Bedford Avenue?

It has 8 residential units and 10 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.