580 Gates Avenue
Brooklyn, NY 11221BBL 3-01815-0038Map
Owner of record: Mary Jane Charles, As Trustee
580 Gates Avenue is a mixed residential and retail building built in 1899 in Brooklyn, 11221. It has 2 residential units across 3 floors. The owner of record is Mary Jane Charles, As Trustee. HPD has recorded 16 housing violations here, most recently on June 11, 2007. 16 of the 16 most recent violations are still open.
- HPD violations
- 16
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 31
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Jun 11, 2007
Open — Nov sent out - BHazardous
Remove the illegal fastening double cylinder lock at street entrance door to building
Jun 11, 2007
Open — Nov sent out - BHazardous
Properly repair the broken or defective mail box at bldg front
Jun 11, 2007
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt 2fl, 2nd story
Jan 9, 2007 · Apt 2FL
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls & ceilings in the entire apartment located at apt 2fl, 2nd story
Jan 9, 2007 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key operated double cylinder lock at vestibule door to 1sty. public hall
Jan 9, 2007
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key operated double cylinder lock at entrance door to building
Jan 9, 2007
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key operated double cylinder lock at security door at entrance to building
Jan 9, 2007
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed in the entrance located at apt 2fl, 2nd story
Apr 7, 2006 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt 2fl, 2nd story
Apr 7, 2006 · Apt 2FL
Open — Nov sent out
Show 6 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2fl, 2nd story
Mar 30, 2006 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder locks at both doors at building at front areaway, 1st story
Mar 30, 2006
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal ceiling kitchen, 3rd story apartment.
Sep 14, 2005
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings throughout 3rd story apartment.
May 3, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen & bathroom, 2nd story apartment. er-1
May 3, 2004
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective water supply pipe ceiling cellar throughout. er-1
May 3, 2004
Open — Nov sent out
DOB building violations · 3
- Construction other optional
Work does not conform to approved construction documents masonry boile r room at cellar existing wood floor joists have been primmed to accom modate ceiling installation complete gut demolitionof all interiors at floor 2 and 3 and partial stairs masonry wall restoration at floor 2 & 3 remedy: stop all work amend plans provide pe report of special ins
Apr 21, 2009
Dob violation - dismissed - Construction other optional
Failure to fire a special inspection statement of responsibility (tr-1 ) prior to issuance and prior to work under special inspection require ment noted: tr-1 onfile is for design applicant only most work requiri ng special inspection is complete including strucural work not on appr oved planse remedy: stop all work proive pe report for all work here
Apr 21, 2009
Dob violation - dismissed - Construction other optional
Work without permit. work noted: erected a steel structure approx 18' x 65'x 12'high walls have 1/8 inch steel welded together @ roof has metal concrete decking also constructed 1/2 bath. presently for stor- age for hardware store remedy: obtain permit or restore to prior legal condition
Mar 19, 2001
Vw-violation work without permit - active
ECB violations · 1
- Non-hazardous
Work without a permit.work noted erected a steel structure approx 18ftx 65ft long x 12ft high walls have 1/8 inch steel welded together and roof has metal concrete deckking also constructed 1/2 bath.presently
Mar 19, 2001 · Penalty $500
Resolve
Complaints
- Heating
Heat related
Apr 9, 2007 · Apt 2
Close - Heating
Heat related
Apr 9, 2007 · Apt 2
Close - Nonconst
Rubbish
Apr 9, 2007 · Apt 2
Close - General
Locks
Apr 9, 2007 · Apt 2
Close - General
Mailbox
Apr 9, 2007 · Apt 2
Close - General
Floor
May 13, 2006 · Apt 2FL
Close - Heating
Heat related
May 13, 2006 · Apt 2FL
Close - Heating
Heat related
Apr 9, 2006 · Apt 2FL
Close - Heating
Heat related
Apr 8, 2006 · Apt 2FL
Close - Heating
Heat related
Apr 8, 2006 · Apt 2FL
Close
Show 21 more ↓
- Heating
Heat related
Apr 5, 2006 · Apt 2FL
Close - Heating
Heat related
Apr 3, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 29, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 27, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 27, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 26, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 26, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 26, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 26, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 26, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 26, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 26, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 26, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 26, 2006 · Apt 2FL
Close - Plumbing
Water-leaks
Nov 30, 2005 · Apt 2FL
Close - Electric
Lighting
Nov 29, 2005 · Apt 2FL
Close - Plumbing
Water-leaks
Nov 29, 2005 · Apt 2FL
Close - Paint/plaster
Ceiling
Nov 29, 2005 · Apt 2FL
Close - Heating
Radiator
Mar 4, 2005 · Apt 2
Close - Heating
Radiator
Mar 4, 2005 · Apt 2
Close - Plumbing
Radiator
Feb 25, 2005 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1899
- Floors
- 3
- Residential units
- 2
- Building area
- 3,483 ft²
- Lot area
- 1,833 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1815 / 38
- Assessed value
- $90,840
- Landmark / historic district
- No
Questions about 580 Gates Avenue
Who owns 580 Gates Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Mary Jane Charles, As Trustee.
Does 580 Gates Avenue have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 580 Gates Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 580 Gates Avenue built?
City records list 1899 as the year it was built.
How many apartments are in 580 Gates Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.