roofy

392 Gates Avenue

Brooklyn, NY 11216BBL 3-01813-0007Map

Owner of record: Asad Ali

392 Gates Avenue is a store building built in 1931 in Brooklyn, 11216. It has 3 residential units across 3 floors. The owner of record is Asad Ali. HPD has recorded 619 housing violations here, most recently on November 24, 2025. 32 of the 50 most recent violations are still open.

HPD violations
619
DOB violations
68
ECB violations
21
HPD complaints
72

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 24, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 619

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 24, 2025

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 4, 2024

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 28, 2023

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2022

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 18, 2022

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 22, 2021

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 8, 2019

    Open — Info nov sent out
  • A

    Properly repair the broken or defective mortise lock at door at building entrance , 1st story

    Jun 21, 2011

    Closed — Violation closed
  • A

    Properly secure the loose door handle at gate at building entrance , 1st story

    Jun 21, 2011

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of disused radiator off connection 1st. sty public hall.

    Feb 11, 2005

    Closed — Violation closed
Show 40 more ↓
  • A

    Refit window sashes throughout 2nd sty apt . #2.

    Feb 11, 2005

    Closed — Violation closed
  • C

    Abate the nuisance consisting of torte clock connected to thermostat of heating plant.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Properly repair the broken or defective door knob at vestibule door in 1st. story public hall.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar thru/out.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective wood window trim south east room 3rd. sty. apt. #2.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color east and south walls bathroom 3rd. sty. apt. 2.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective plaster board north wall bathroom 3rd. sty. apt. 2.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Properly repair the broken or defective wood sash pockets,top sash north east room window 3rd. sty. apt. 2.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Provide bell system from street to 3rd. sty. apt. 2.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items and thru/ out 1st to 3rd. sty. public hall.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color holes thru/ out walls and suffits and ceilings at public hall all stys.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Remove all encumbrances consisting of gate blocking access to 3rd. sty stairs to bulkhead

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective tin ceiling at bulkhead over 3rd. sty . public hall.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Abate the nuisance consisting of gate installed at bulkhead door at public hall.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Abate the nuisance consisting of exposed wiring north wall 1st. sty. pubic hall.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective tin ceiling at 1st. sty public hall vestibule.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department all ceilings and walls thru/ out 3rd. sty apt. 2 rooms.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department all ceilings suffit, walls and trim thru/.out all stys public hall.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • C

    Abate the nuisance consisting of broken heat riser pipe in 1st. story public hall.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color wall south east room 3rd. sty. apt . 3.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl bathroom 3rd. sty. apt. 3.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • A

    Repair leaky water closet flush pipe connection bathroom 3rd. sty. apt. 3.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Replace with new the missing cement and ceramic tiles north and west wall bathroom 3rd. sty . apt. 3.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color wall and ceiling north room 3rd. sty. apt . 3.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Properly repair the broken or defective moulding north window north room 3rd. sty apt. 3.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items all stys public hall.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Properly repair the broken or defective light fixtures west wall 3rd. sty public hall.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective walls fire retrarded material all stys public hall.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • C

    Repair the roof so that it will not leak over southeast room 3rd. sty. apt . 3.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • C

    Provide adequate supply of hot water for the fixtures bathroom and kitchen fixtures 2 sty apt . #2.

    Feb 11, 2005

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures kitchen and bathroom 2nd sty apt. #2.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and walls throughout 2nd sty apt. #2.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Replace with new the missing ceramic wall tiles at tub enclosure in bathroom 2nd sty apt. #2.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Replace with new the broken or defective cracked glass lower sash window at south 2 sty apt . #2.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective metal ceiling in kitchen of 2nd sty apt . #2.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and walls throughout 3rd sty apt . #3.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in bathroom 3rd sty apt . #3.

    Feb 11, 2005

    Open — First no access to re- inspect violation
  • B

    Provide adequate supply of hot water for the fixtures kitchen in 3rd sty apt. #3.

    Feb 11, 2005

    Closed — Violation closed
  • C

    Replace with new the missing glass in top sash window at north apt. #2.

    Feb 11, 2005

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over 3rd sty apt. #3.

    Feb 11, 2005

    Open — First no access to re- inspect violation

DOB building violations · 68

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Construction other optional

    Ftm-due to fire/collapsed bldgs at 394/396 gates avenue on 2/07/22, exp3 wall at 351 was fire damaged and partially opn.351 bldg suffered waterdmg,partlly collpsd ceiling&partitions;cellar flooded.immediately comply with commissioner's order #357305(020723feu30302pn)dated february 7,2022

    Mar 14, 2023

    Dob violation - active
  • Construction other optional

    Ftm-due to fire/collapse and 394&396 gates avenue on 2/7/22 the building at 353 nostrand ave suffered water damage,broken door,flooded cellar.immediately comply with commissioner's order #357306 (020723feu30303pn)dated february 7,2023

    Mar 14, 2023

    Dob violation - active
  • Construction other optional

    Ftm-due to fire/collapse bldg@394&396 gates ave on 2/7/22,355 bldg.was dmgd as follows:water dmg&collapsed ceiling/wall finishes;roof& bulkhead fire dmgd&partly open;exp3 wall dmgd;windows broken immediately comply with commissioner's order3357307(020723feu30304pn) dates february 7,2023

    Mar 14, 2023

    Dob violation - active
Show 40 more ↓
  • Immediate emergency anythingoptional

    Seal all openings and penetrations to prevent unauthorized access and to safeguard public and property

    Feb 8, 2022

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Seal all openings and penetrations to prevent unauthorized access and to safeguard the public and property

    Feb 8, 2022

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Seal all openings and penetrations to prevent unauthorized access and to safeguard the public and property

    Feb 8, 2022

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Seal all openings and penetrations to safeguard the public & property and prevent unauthorized access

    Feb 8, 2022

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant. at time of inspection observed exposure #2 sustained severe damage along with water and smoke damage throughout premises due to fire at 394 gates avenue.

    Feb 7, 2022

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant. at time of inspection observed severe fire, water and smoke damage throughout premises along with roof open, windows removed exposing interior to elements due to fire at 394 gates avenue.

    Feb 7, 2022

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant. at time of inspection smoke and water damage along with storefront due to fire at 394 gates avenue.

    Feb 7, 2022

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant. at time of inspection observed water and smoke damage along with steel gate cut and front door damaged due to fire at 394 gates avenue.

    Feb 7, 2022

    Dob violation - active
  • Construction other optional

    Ftm-due to fire/collapsed bldgs at 394/396 gates avenue on02/07/22,exp 3 wall@351 was fire damaged and partially open.351 bldg suffered water damage,partially collapsed ceiling & partitions,cellar flooded. owner to retain nyspe to evaluate entire bldg & file repair drawingss with dob.rpr bldg unr prmt,strt wrk by 3/14/22 &compltd/signoff by 4/22/22

    Feb 7, 2022

    Dob violation - active
  • Construction other optional

    Ftm-due to fire/collapse and 394&396 gates avenue on 2/7/22 the bldg@ 353 nostrand ave suffered water damage,broken door, flooded cellar owner to retain nyspe to evealuate entire building & file repair plans with nyc dob.building repaired under permit starting by 3/14/22 and completed /signed off by 04/22/2022

    Feb 7, 2022

    Dob violation - active
  • Construction other optional

    Ftm-due to fire/collapse bldg @394&396 gates ave on 2/7/22,355 bldg was damaged as follows:water damage&collapsed ceiling/wall finishes roof &bulkhead fire camaged and partly open,exp3 wall damaged,windows broken.owner to retain nyspe to evaluate entire bldg&file plans w/dob repair under permit,start wrk by 3/14/22,compltd/signed off by 4/22/22

    Feb 7, 2022

    Dob violation - active
  • Construction other optional

    Ftm-due to fire/collapse bldg @394&396 gates ave on 2/7/22,355 bldg was dmgd as follows:water dmg& collapsed ceiling/wall finishes;roof & bulkhead fire dmgd &partly open;exp3 wall dmgd;windows broken.ownr retain nyspe-evalu entire bldg&file rpr plans w/nys dob bldg rpr undr prmt strt by 3/14/22&complt/sign off by 4/22/22

    Feb 7, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 29, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Construction other optional

    Due to vehicle crashing commercial space entrance

    Nov 24, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active

ECB violations · 21

  • Class - 1

    Failure to maintain building in code compliant matter. noted: a section of facade approx 4ft x 2ft at exp-4 nostrand side is bulging over a public sidewalk, cracks in masonry finishes at exp1 and exp-4., repair

    Jan 28, 2026 · Penalty $12,500

    Active
  • Class - 1

    The bulging condition at exp. 4, facing nostrand ave. still exists. located between awnings at 2nd floor level.

    Jun 27, 2023 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain building wall(s) and appurtenances. at time of inspection observed at exposure #4 (nostrand ave) a section of concrete stucco approx: 4'x2' partially detached & bulging outward over public s

    Apr 21, 2022 · Penalty $12,500

    Active
  • Class - 1

    Failure to comply with commissioner's order contained in summons/viol tion #35584184n issued 07/09/21 and file certificate of correction pu suant to 28-201.1 and 1rcny 102-01.for work w/o permit.note no record

    Mar 4, 2022

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in summons/v35584184n issued 7/9/21 &to file c/c pursuant to28-201.1&1rcny102-01.work w/opermit comply w/commissioner's order &/or file c/c.

    Dec 1, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Work w/o permit.note observed on exp1 approx5' off grnd on sidewalk are 2wallmounted split ductless air condenser units w/electrical shutoff.no such permits in bldg records.obtain permits.

    Jul 9, 2021 · Penalty $12,500

    Active
  • Class - 1

    Failure to comply with the commissioners order contained in summons.violation #35478461n issued on 04-10-21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit at

    May 18, 2021 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35478461n issued on 04/10/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit. noted: at exp#1,2 wall mounted

    Mar 29, 2021 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to comply w/ commissioner's order contained in summons/violation#35478461n issued 4/10/20&to file certificate of correction pursuantto 28-201.1&1rcny102-01 for work w/o permit.comply w/ commissioner's o

    Jan 21, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35478461n issued on 04/10/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c

    Oct 8, 2020 · Penalty $12,500

    Resolve
Show 11 more ↓
  • Class - 1

    Work w/o permit @time of inspection two wall mounted air-conditioners were installed @exposure one with electrical wiring. no permits on file, for such work. with the dob.rem: obtain permit.

    Apr 10, 2020 · Penalty $12,500

    Active
  • Class - 2

    Failure to maintain bldg in code complain manner exhaust discharge must be no closure than 10 ft from bldg opening as per mc 501.2 & rs 13-1 section 2.21.4 restaurant is within 7 feet of window of second floor.

    Apr 10, 2020 · Penalty $6,250

    Active
  • Class - 2

    Sign/panel not provided or not in compliance w/ section. noted: on active job site,information panel not provded stating 1) owners name, address & phone# (2)contractors name, address & phone# (3)phone# for repo

    Jun 8, 2016

    Resolve
  • Class - 2

    Failure to post or properly permits for work @ premises. noted: on active jobsite, under alteration# 321396315-01-ew-ot permit for work has not been posted. rem:post permits.

    Jun 8, 2016

    Resolve
  • Class - 2

    Jobsite fence not constructed or maintained pursuant to subsection. noted: at the time of my inspeciton, botu viewing panels were open w/o any covering. also fence was not provided a project information pa

    Jun 5, 2016

    Resolve
  • Hazardous

    Plumbing work without permit. a gas fired hot water heater installed 2nd flr apt. ktchen, no permit. inspection or gas test this dept. remedy: obtain a permit if feasible or restore to prior legal condition.

    Jan 2, 2001 · Penalty $1,000

    Active
  • Hazardous

    Boilers

    Jan 5, 1998 · Penalty $2,500

    Active
  • Hazardous

    Failure to maintain exterior building wall. in that rear retaining wall east is defective; has pulled away leaving an approc one inch vertical air gap from apex base where the n.e. corner adjoins side wall nort

    Jan 5, 1995 · Penalty $1,000

    Active
  • Non-hazardous

    Failure to maintain exterior building wall. defect is-brickwork is cracked, missingg, and defective at rear roof level. remedy-provide adequate protection and make all ncecessary lawful repairs in a safe manner

    Jul 27, 1994

    Resolve
  • Hazardous

    Failure to maintain exterior building cornice between 1st & 2nd floor is missing, exposing the wooden ceiling joist and frontal framing. remedy: maintain building facade to the satisfaction of d.o.b

    Jun 24, 1993 · Penalty $1,000

    Active
  • Non-hazardous

    37,39a,39b,20b.

    Dec 20, 1990

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Nov 24, 2017 · Apt 1

    Close
  • Outside building

    Skylight

    Nov 24, 2017 · Apt 1

    Close
  • Safety

    Smoke detector

    Apr 24, 2014 · Apt 2FL

    Close
  • Safety

    Carbon monoxide detector

    Apr 24, 2014 · Apt 2FL

    Close
  • Heating

    Heat related

    Feb 25, 2013 · Apt 1R

    Close
  • Heating

    Heat related

    Feb 19, 2013 · Apt 1R

    Close
  • General

    Doors

    Jun 17, 2011 · Apt 2FL

    Close
  • Heating

    Heat related

    Dec 21, 2010 · Apt 2

    Close
  • Heating

    Heat related

    Dec 10, 2010 · Apt 2

    Close
  • Nonconst

    Vermin

    Dec 10, 2010 · Apt 2

    Close
Show 40 more ↓
  • Heating

    Heat related

    Nov 19, 2010 · Apt 2

    Close
  • Nonconst

    Vermin

    Nov 19, 2010 · Apt 2

    Close
  • Nonconst

    Vermin

    Nov 9, 2010 · Apt 2

    Close
  • Nonconst

    Signage

    May 4, 2009 · Apt BLDG

    Close
  • General

    Mold

    Sep 20, 2004 · Apt 2/3

    Close
  • General

    Windows

    Sep 20, 2004 · Apt 2/3

    Close
  • Paint/plaster

    Wall

    Sep 20, 2004 · Apt 2/3

    Close
  • Paint/plaster

    Ceiling

    Sep 20, 2004 · Apt 2/3

    Close
  • Paint/plaster

    Wall

    Sep 20, 2004 · Apt 2/3

    Close
  • Paint/plaster

    Ceiling

    Sep 20, 2004 · Apt 2/3

    Close
  • Plumbing

    Basin/sink

    Sep 20, 2004 · Apt 2/3

    Close
  • Paint/plaster

    Ceiling

    Sep 20, 2004 · Apt 2/3

    Close
  • Electric

    Wiring

    Sep 20, 2004 · Apt 2/3

    Close
  • Plumbing

    Toilet

    Sep 20, 2004 · Apt 2/3

    Close
  • Plumbing

    Bathtub/shower

    Sep 20, 2004 · Apt 2/3

    Close
  • General

    Windows

    Sep 20, 2004 · Apt 2/3

    Close
  • General

    Mold

    Sep 20, 2004 · Apt 2/3

    Close
  • Paint/plaster

    Wall

    Sep 20, 2004 · Apt 2/3

    Close
  • General

    Windows

    Sep 20, 2004 · Apt 2/3

    Close
  • Paint/plaster

    Wall

    Aug 23, 2004 · Apt 2

    Close
  • Electric

    Wiring

    Aug 23, 2004 · Apt 2

    Close
  • Electric

    Wiring

    Aug 23, 2004 · Apt 2

    Close
  • Electric

    Bell-buzzer/intercom

    Aug 23, 2004 · Apt 2

    Close
  • Paint/plaster

    Wall

    Aug 23, 2004 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Aug 23, 2004 · Apt 2

    Close
  • General

    Mold

    Aug 23, 2004 · Apt 2

    Close
  • Nonconst

    Vermin

    Aug 23, 2004 · Apt 2

    Close
  • Nonconst

    Vermin

    Aug 23, 2004 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jul 8, 2004 · Apt 3

    Close
  • General

    Windows

    Jul 8, 2004 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Jul 8, 2004 · Apt 3

    Close
  • General

    Doors

    Jul 8, 2004 · Apt 3

    Close
  • General

    Windows

    Jul 8, 2004 · Apt 3

    Close
  • General

    Stairs

    Jul 8, 2004 · Apt 3

    Close
  • Electric

    Wiring

    Jul 8, 2004 · Apt 3

    Close
  • Electric

    Wiring

    Jul 8, 2004 · Apt 2

    Close
  • General

    Doors

    Jul 8, 2004 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jul 8, 2004 · Apt 2

    Close
  • Electric

    Bell-buzzer/intercom

    Jul 8, 2004 · Apt 3

    Close
  • General

    Windows

    Jul 8, 2004 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K4)
Year built
1931
Floors
3
Residential units
3
Building area
5,125 ft²
Lot area
2,500 ft²
Zoning
R6A
Community board
303
Council district
36
Block / lot
1813 / 7
Assessed value
$279,450
Landmark / historic district
No

HPD registration #819528, last renewed Feb 8, 2019.

Questions about 392 Gates Avenue

Who owns 392 Gates Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Asad Ali.

Does 392 Gates Avenue have violations?

Yes. NYC HPD has recorded 619 housing violations at this property.

Is 392 Gates Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 392 Gates Avenue built?

City records list 1931 as the year it was built.

How many apartments are in 392 Gates Avenue?

It has 3 residential units and 6 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.