348a Gates Avenue
Brooklyn, NY 11216BBL 3-01812-0028Map
Owner of record: Bush Nicole
348a Gates Avenue is a walk-up apartment building built in 1899 in Brooklyn, 11216. It has 3 residential units across 3 floors. The owner of record is Bush Nicole. HPD has recorded 104 housing violations here, most recently on September 29, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 104
- DOB violations
- 1
- ECB violations
- 3
- HPD complaints
- 72
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 104
- BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 1st story
Sep 29, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light switch at east wall at public hall, 1st story
Sep 29, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance doors
Sep 29, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Sep 29, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Sep 29, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 29, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame missing at public hall, 1st story
Sep 29, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings signage missing
Sep 29, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox signage missing at public hall, 1st story
Sep 29, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 29, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing at public hall, 1st story
Sep 29, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 1st room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing saddle in the 2nd bathroom from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at south and west wall at water closet in the 2nd bathroom from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Replace the broken or defective at washbasin in the 2nd bathroom from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe at washbasin in the 2nd bathroom from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the 2nd bathroom from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bathroom door in the 2nd bathroom from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective at guard rail at floor in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective room entrance doors in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at 1st closet floor in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and it's assembly at 1st closet door in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and it's assembly at 2nd closet door in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at 2nd closet floor in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden floors in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Abate the nuisance consisting of pests. evidence of centipede in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and at all ceiling in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe at sink in the kitchen located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 1st room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at sink in the kitchen located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden base cabinet in the kitchen located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective apartment entrance doors in the entrance located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance located at apt 2, 1st story, 1st apartment from north at east
Sep 29, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 1st story, 1st apartment from north at east
Sep 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door , 1st story
Sep 3, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2, 1st story, 1st apartment from north at east
Sep 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 2, 1st story, 1st apartment from north at east
Sep 3, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 3, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
Sep 3, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet doors at east wall in the kitchenette located at apt 2, 1st story, 1st apartment from north at east
Sep 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
May 6, 2026 · Apt 2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective hardwood floors in the 1st room from north located at apt 2, 1st story, 1st apartment from north at east
May 6, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from north located at apt 2, 1st story, 1st apartment from north at east
May 6, 2026 · Apt 2
Open — Nov sent out
DOB building violations · 1
- Construction other optional
Ftm. at rear wall prtions of ext wythe of prssd brckdelaminating frm wall up to 4"w, areads of bulging brick, sep wndw & door openings & skewed lintels&sills.prssd brck & brwnstne lintels. owner to retain nys-lic pe & sob reg cntrctr to eval ext walls & rpair undr prmt. file app for repairs by 1/16/22
Dec 1, 2022
Dob violation - active
ECB violations · 3
- Class - 1
Observed a few section of the rear brick exterior wall is bulging out with one crack & one out of plumb window sill., maintain exterior building wall
Dec 1, 2022 · Penalty $2,500
Resolve - Class - 2
Work without a permit; noted: observed new electrical wiring was installed in the interior hallway and rear plus a mitsubishi electric ac split unit at rear as well. no permit on file as of 12-01-22., obtain al
Dec 1, 2022 · Penalty $625
Active - Hazardous
Failure to maintain bldg:defect is:interior hallway stairs 1st to 2nd to 3rd floors cracked and broken stair treads broken bannisters and missing ballstrades.remedy:make immediate repairs
Jun 10, 2003 · Penalty $2,500
Resolve
Complaints
- Flooring/stairs
Floor
Sep 17, 2026 · Apt 2
Close - General
Bell/buzzer/intercom
Aug 31, 2026 · Apt 2
Close - General
Ventilation system
Aug 31, 2026 · Apt 2
Close - Door/window
Window frame
Aug 31, 2026 · Apt 2
Close - Plumbing
Basin/sink
Aug 31, 2026 · Apt 2
Close - Electric
Lighting
Aug 31, 2026 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
May 1, 2026 · Apt 2
Close - Electric
Outlet/switch
May 1, 2026 · Apt 2
Close - Door/window
Door
May 1, 2026 · Apt 2
Close - Appliance
Electric/gas range
May 1, 2026 · Apt 2
Close
Show 40 more ↓
- Door/window
Door
May 1, 2026 · Apt 2
Close - Safety
Smoke detector
May 1, 2026 · Apt 2
Close - Safety
Carbon monoxide detector
May 1, 2026 · Apt 2
Close - Plumbing
Basin/sink
May 1, 2026 · Apt 2
Close - General
Cabinet
May 1, 2026 · Apt 2
Close - Unsanitary condition
Mold
May 1, 2026 · Apt 2
Close - Paint/plaster
Ceiling
May 1, 2026 · Apt 2
Close - Flooring/stairs
Floor
May 1, 2026 · Apt 2
Close - Unsanitary condition
Pests
May 1, 2026 · Apt 2
Close - Door/window
Door
Jul 30, 2025 · Apt 2
Close - General
Ventilation system
Jul 30, 2025 · Apt 2
Close - Safety
Carbon monoxide detector
Jul 30, 2025 · Apt 2
Close - Safety
Smoke detector
Jul 30, 2025 · Apt 2
Close - Plumbing
Radiator
Jul 30, 2025 · Apt 2
Close - Door/window
Window frame
Jul 30, 2025 · Apt 2
Close - Paint/plaster
Wall
Jul 30, 2025 · Apt 2
Close - Plumbing
Basin/sink
Jul 30, 2025 · Apt 2
Close - General
Cabinet
Jul 30, 2025 · Apt 2
Close - Flooring/stairs
Floor
Jul 30, 2025 · Apt 2
Close - Door/window
Door
Jul 28, 2025 · Apt 2
Open - General
Cabinet
Jul 28, 2025 · Apt 2
Open - Flooring/stairs
Floor
Jul 28, 2025 · Apt 2
Open - Safety
Carbon monoxide detector
Jul 28, 2025 · Apt 2
Open - General
Ventilation system
Jul 28, 2025 · Apt 2
Open - Door/window
Window frame
Jul 28, 2025 · Apt 2
Open - Plumbing
Basin/sink
Jul 28, 2025 · Apt 2
Open - Safety
Smoke detector
Jul 28, 2025 · Apt 2
Open - Flooring/stairs
Floor
Jul 28, 2025 · Apt 2
Open - Unsanitary condition
Mold
Jul 28, 2025 · Apt 2
Open - Electric
Outlet/switch
Jul 28, 2025 · Apt 2
Open - Paint/plaster
Ceiling
Jul 28, 2025 · Apt 2
Open - Paint/plaster
Wall
Jul 28, 2025 · Apt 2
Open - Paint/plaster
Wall
Jul 28, 2025 · Apt 2
Open - Paint/plaster
Ceiling
May 12, 2006 · Apt TOPFL
Close - Paint/plaster
Ceiling
May 12, 2006 · Apt TOPFL
Close - Paint/plaster
Ceiling
May 12, 2006 · Apt TOPFL
Close - Plumbing
Water-leaks
May 12, 2006 · Apt TOPFL
Close - Plumbing
Water-leaks
May 12, 2006 · Apt TOPFL
Close - General
Doors
Apr 24, 2006 · Apt TOPFL
Close - General
Windows
Apr 24, 2006 · Apt TOPFL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1899
- Floors
- 3
- Residential units
- 3
- Building area
- 3,240 ft²
- Lot area
- 1,800 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1812 / 28
- Assessed value
- $96,540
- Landmark / historic district
- No
HPD registration #347959, last renewed Jul 15, 2003.
Questions about 348a Gates Avenue
Who owns 348a Gates Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bush Nicole.
Does 348a Gates Avenue have violations?
Yes. NYC HPD has recorded 104 housing violations at this property.
Is 348a Gates Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 348a Gates Avenue built?
City records list 1899 as the year it was built.
How many apartments are in 348a Gates Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.