Violations at 53 Utica Avenue
Brooklyn, NY 11233 · BBL 3-01708-0001 · Back to the property
HPD housing violations
The newest 50 of 158 HPD violations. The city keeps the complete history.
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 2a, 2nd story, 1st apartment from west at north
Sep 30, 2026 · Apt 2A
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet in the 5th room from north located at apt 2a, 2nd story, 1st apartment from west at north
Sep 30, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west and south walls in the 5th room from north located at apt 2a, 2nd story, 1st apartment from west at north
Sep 30, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling north and west walls in the 4th bathroom from north located at apt 2a, 2nd story, 1st apartment from west at north
Sep 30, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th bathroom from north located at apt 2a, 2nd story, 1st apartment from west at north
Sep 30, 2026 · Apt 2A
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Sep 30, 2026 · Apt 2A
Open — Nov certified late - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and south wall in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Sep 30, 2026 · Apt 2A
Open — Invalid certification - ANon-hazardous
Cleanse to the satisfaction of this department the all ventilation system at ceiling in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Sep 30, 2026 · Apt 3A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Sep 30, 2026 · Apt 3A
Open — Civ14 mailed - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Sep 30, 2026 · Apt 3A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Sep 30, 2026 · Apt 3A
Open — Civ14 mailed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east at south located at apt 3a, 3rd story, 1st apartment from east at south
Sep 30, 2026 · Apt 3A
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the private hallway located at apt 1b, 1st story, 1st apartment from east at south
Jul 18, 2026 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the private hallway located at apt 1b, 1st story, 1st apartment from east at south
Jul 18, 2026 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
May 31, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tile in the 4th room from east located at apt 1b, 1st story, 1st apartment from east at south
May 31, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 4th room from east located at apt 1b, 1st story, 1st apartment from east at south
May 31, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective reglaze at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
May 31, 2026 · Apt 1B
Open — Not complied with - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl water closet in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
May 31, 2026 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jan 21, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Sep 10, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Sep 10, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from east at south
Sep 10, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Sep 10, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Apr 7, 2025 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Apr 7, 2025 · Apt 3B
Closed — Violation dismissed - BHazardous
The following dwelling units were reoccupied while being subject to an order to repair/vacate order issued by the department; file for a dismissal request related to the issued order (see www.nyc.gov/hpd). in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Oct 23, 2024 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2a, 2nd story, 1st apartment from west at north
Oct 23, 2024 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 2a, 2nd story, 1st apartment from west at north
Oct 23, 2024 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2a, 2nd story, 1st apartment from west at north
Oct 23, 2024 · Apt 2A
Closed — Violation dismissed - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for vacate order # 258913 i in the entire apartment located at apt, 2nd story, 1st apartment from west at north
Oct 22, 2024
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Oct 8, 2024 · Apt 2A
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Aug 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 4, 2023
Open — Invalid certification - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Nov 4, 2023 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Nov 4, 2023 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Feb 18, 2022 · Apt 1A
Closed — Violation dismissed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 1a - 1st story south apartment - vacate # 167105
Jun 28, 2021
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 2a - 2nd story south apartment - vacate # 167105
Jun 28, 2021
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 3a - 3rd story south apartment - vacate # 167105
Jun 28, 2021
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jun 18, 2021 · Apt 3A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Jun 18, 2021 · Apt 2A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jun 18, 2021 · Apt 1A
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the soot at ceiling and walls at public hall, 2nd story
Jun 18, 2021
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective glass panes at upper and lower sashes at windows at public hall, 2nd story
Jun 18, 2021
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the soot at ceiling and walls at public hall, 1st story
Jun 18, 2021
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at the bathtub in the bathroom located at apt 2b, 1st story, apartment at north
Dec 23, 2019 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, apartment at west
May 29, 2019 · Apt 1A
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the north wall in the bathroom located at apt 1a, 1st story, apartment at south
May 22, 2019 · Apt 1A
Open — Nov sent out
DOB building violations
The newest 50 of 73 DOB violations. The city keeps the complete history.
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations
5 ECB violations, newest first.
- Class - 2
Fresh air to boiler room 1/2 blocked-combustion air filter 1/2 clogged-motorized fresh air louver is defective+is missing open louver proving switch-both safety discharge pipes are incorrect-storage in boiler r
Jul 31, 2019
Resolve - Non-hazardous
B4a/50a/50b/50c. (50a) separate low water cut off from safety or relief valve (50b) pipe safety or relief valve up right (50c) install emergence switch at boiler room over entrance.
Oct 12, 2005
Resolve - Non-hazardous
B4a/50a/50b/50c. (50a) separate low water cut off from safety or relief valve. (50b) pipe safety or relief valve right (50c) install emergence switch at boiler room door entrance.
Oct 12, 2005
Resolve - Non-hazardous
B4a/50a/50b/50c. (50a) separate low water cut off from safety 0n relief valve. (50b) pipe safety or relief valve up right (50c) install emergence switch at boiler room door entrance.
Oct 12, 2005
Resolve - Non-hazardous
16 36 50 50a 50b (loch in var hot water boiler) 50) boiler resting on loose blocks. 50a) flue pipe needs to be supported. 50b) boiler safetyvalve not in upright position and is piped to boiler together with
Sep 10, 2004 · Penalty $180
Resolve