roofy

Violations at 245 Lewis Avenue

Brooklyn, NY 11221 · BBL 3-01635-0003 · Back to the property

HPD housing violations

The newest 50 of 81 HPD violations. The city keeps the complete history.

  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 6 inches out the window at building front at fire escape, 3rd story

    Aug 12, 2026

    Open — Nov certified on time
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story

    Jun 17, 2026

    Closed — Violation closed
  • ANon-hazardous

    Properly repair with similar material the broken or defective fire retardant materail at ceiling at public hall, 2nd story

    Jun 17, 2026

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story

    May 28, 2026

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall at closet in the 2nd room from east located at apt 2a, 2nd story, 1st apartment from north at east

    May 28, 2026 · Apt 2A

    Closed — Violation dismissed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east

    May 28, 2026 · Apt 2A

    Closed — Violation dismissed
  • BHazardous

    Remove the torn and/or loose floor covering vinyl floor tiles throughout at public hall, 1st story

    May 12, 2026

    Closed — Violation closed
  • BHazardous

    Remove the torn and/or loose floor covering vinyl tiles throughout at public hall, 2nd story

    May 12, 2026

    Closed — Violation closed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding more than 4 inches beyond window sill at 3 story balcony at building front at fire escape

    May 12, 2026

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls. in the 3rd room from north at east located at apt 2d, 2nd story, 2nd apartment from south at west

    May 12, 2026 · Apt 2D

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at window header in the 3rd room from north at east located at apt 2d, 2nd story, 2nd apartment from south at west

    May 12, 2026 · Apt 2D

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from north at east located at apt 2d, 2nd story, 2nd apartment from south at west

    May 12, 2026 · Apt 2D

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at window header in the 2nd room from north at east located at apt 2d, 2nd story, 2nd apartment from south at west

    May 12, 2026 · Apt 2D

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls. in the 1st room from north at east located at apt 2d, 2nd story, 2nd apartment from south at west

    May 12, 2026 · Apt 2D

    Closed — Violation closed
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... lest than 10 square feet at ceiling in the 1st room from north at east located at apt 2d, 2nd story, 2nd apartment from south at west

    May 12, 2026 · Apt 2D

    Closed — Violation dismissed
  • BHazardous

    Remove the torn and/or loose floor covering vinyl floor tiles throughout in the kitchen located at apt 2d, 2nd story, 2nd apartment from south at west

    May 12, 2026 · Apt 2D

    Closed — Violation closed
  • BHazardous

    Remove the torn and/or loose floor covering vbinyl floor tiles throughout in the foyer located at apt 2d, 2nd story, 2nd apartment from south at west

    May 12, 2026 · Apt 2D

    Closed — Violation closed
  • BHazardous

    Remove the torn and/or loose floor covering vinly floor tiles throughout in the private hallway located at apt 2d, 2nd story, 2nd apartment from south at west

    May 12, 2026 · Apt 2D

    Closed — Violation closed
  • IInformation / order

    Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 1c, vacate order #260356 in the entire apartment located at apt, 1st story, 1st apartment from south at west

    Feb 3, 2026

    Closed — Violation closed
  • IInformation / order

    Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 2c, vacate order #260356 in the entire apartment located at apt, 2nd story, 1st apartment from south at west

    Feb 3, 2026

    Open — Defect letter issued
  • CImmediately hazardous

    Properly repair or replace the broken or defective glass pane at upper sash window at south wall at public hall, 3rd story

    Jan 21, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair or replace the broken or defective glass pane at upper sash window at south wall at public hall, 2nd story

    Jan 21, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair or replace the broken or defective glass pane at upper sash window at north wall at public hall, 2nd story

    Jan 21, 2026

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the west and south walls in the 3rd room from east at south located at apt 3c, 3rd story, 1st apartment from south at west

    Jan 21, 2026 · Apt 3C

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from east at south located at apt 3c, 3rd story, 1st apartment from south at west

    Jan 21, 2026 · Apt 3C

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the east and west walls in the 1st room from east at south located at apt 3c, 3rd story, 1st apartment from south at west

    Jan 21, 2026 · Apt 3C

    Closed — Violation dismissed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west

    Jan 21, 2026 · Apt 2C

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west

    Jan 21, 2026 · Apt 1C

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 2nd apartment from south at west

    Dec 6, 2025 · Apt 2D

    Closed — Violation closed
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2d, 2nd story, 2nd apartment from south at west

    Dec 6, 2025 · Apt 2D

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Oct 8, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Oct 8, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall

    Oct 8, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall

    Oct 8, 2025

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Oct 8, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall

    Oct 8, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Oct 8, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Oct 8, 2025

    Closed — Violation dismissed
  • BHazardous

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west

    Oct 8, 2025 · Apt 1C

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west

    Oct 8, 2025 · Apt 1C

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west

    Oct 8, 2025 · Apt 1C

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tles at north wall, east wall, and south walls in the bathroom located at apt 1c, 1st story, 1st apartment from south at west

    Oct 8, 2025 · Apt 1C

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective mechanical ventilation system at east in the bathroom located at apt 1c, 1st story, 1st apartment from south at west

    Oct 8, 2025 · Apt 1C

    Open — Not complied with
  • BHazardous

    Properly repair or replace the broken or defective base cabinet floor at north in the kitchen located at apt 1c, 1st story, 1st apartment from south at west

    Oct 8, 2025 · Apt 1C

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from south at west

    Oct 8, 2025 · Apt 1C

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from south at west

    Oct 8, 2025 · Apt 1C

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at door leading to south yard at public hall, 1st story

    Oct 8, 2025

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance at public hall, 1st story

    Oct 8, 2025

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective lock-set at entrance door to building , 1st story

    Sep 28, 2025

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective latch-set at door at south , 1st story

    Sep 28, 2025

    Closed — Violation closed

DOB building violations

11 DOB violations, newest first.

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 27, 2018

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Oct 16, 2017

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2015

    Mar 14, 2016

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations

No ECB violations on record