roofy

Violations at 175 Stuyvesant Avenue

Brooklyn, NY 11221 · BBL 3-01631-0001 · Back to the property

HPD housing violations

10 HPD violations, newest first.

  • BHazardous

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods 2nd stack from west at building front at fire escape

    Aug 26, 2026

    Open — Nov certified on time
  • BHazardous

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4c, 4th story, 1st apartment from east at south

    Aug 15, 2026 · Apt 4C

    Open — Violation will be reinspected
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at basement at boiler room

    May 26, 2026

    Open — Violation will be reinspected
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south

    May 26, 2026 · Apt 4C

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 3rd story, 1st apartment from south at west

    May 26, 2026 · Apt 3A

    Closed — Violation closed
  • BHazardous

    Remove all obstructions and repair all defects in at bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west

    May 26, 2026 · Apt 3A

    Open — Violation will be reinspected
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door at cellar

    May 10, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 2nd apartment from south at west

    May 10, 2026 · Apt 3B

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective door frame in the entrance located at apt 3a, 3rd story, 1st apartment from south at west

    Apr 6, 2026 · Apt 3A

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from north located at apt 3a, 3rd story, 1st apartment from south at west

    Apr 6, 2026 · Apt 3A

    Closed — Violation dismissed

DOB building violations

15 DOB violations, newest first.

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2021

    Aug 21, 2022

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 7, 1993

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 6, 1993

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 6, 1993

    Dob violation - active
  • Public assembly none

    Pa-public assembly none

    Mar 23, 1990

    Dob violation - active
  • Public assembly none

    Pa-public assembly none

    Aug 7, 1989

    Dob violation - active

ECB violations

7 ECB violations, newest first.

  • Class - 2

    Building or open lot occupied withtout a valid certificate of occupancy.noted:building is occupied as school with class rooms and students without a valid certificate of occupancy.rem:obtain a valid certificate

    May 10, 2017

    Resolve
  • Class - 2

    Bc28-301.1/failure to maintain ventilation to gas meter room pre p115.6(1968 code)fgc appendix e(e4)(2014 code)noted:misssing ventilation observed at gas meter room at cellar level.rem:comply with notice of vio

    May 10, 2017

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner:lack of emergency lighting for exits,exit disgharges and public corridors per bc1006.1'27-542.noted:defective emergency lighting observed at 2nd flr classro

    May 10, 2017

    Resolve
  • Class - 2

    Sec bc3303.13 misc violations failure to provide a solid 8ft construction fence where construction excavation or demolition operations have been abandoned discontinued or interrupted noted jobsite fence defecti

    Jun 17, 2009 · Penalty $800

    Active
  • Non-hazardous

    36- boiler not registered

    May 11, 1995

    Resolve
  • Non-hazardous

    36 - boiler not registered

    May 11, 1995

    Resolve
  • Non-hazardous

    36 - boiler not registered

    May 11, 1995

    Resolve