96 Malcolm X Boulevard
Brooklyn, NY 11221BBL 3-01621-0044Map
Owner of record: 96 Malcolm X LLC
96 Malcolm X Boulevard is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 8 residential units across 4 floors. The owner of record is 96 Malcolm X LLC. HPD has recorded 30 housing violations here, most recently on August 10, 2026. 15 of the 30 most recent violations are still open.
- HPD violations
- 30
- DOB violations
- 31
- ECB violations
- 1
- HPD complaints
- 305
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq feet observed at ceiling in the bathroom located at apt 4l, 4th story, 1st apartment from south at west
Aug 10, 2026 · Apt 4L
Open — Violation will be reinspected - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower window sash - gillotine effect-at 1st and 3rd at west wall in the 4th room from east located at apt 4l, 4th story, 1st apartment from south at west
Aug 10, 2026 · Apt 4L
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at entrance door in the entrance located at apt 4l, 4th story, 1st apartment from south at west
Aug 10, 2026 · Apt 4L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 4l, 4th story, 1st apartment from south at west
Aug 10, 2026 · Apt 4L
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules improprly installed- required standadr 4 to 12 inches from ceiling at wall or 4 inches from wall at ceiling in the entire apartment located at apt 4l, 4th story, 1st apartment from south at west
Aug 10, 2026 · Apt 4L
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations improprly installed- required standadr 4 to 12 inches from ceiling at wall or 4 inches from wall at ceiling in the entire apartment located at apt 4l, 4th story, 1st apartment from south at west
Aug 10, 2026 · Apt 4L
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 4l, 4th story, 1st apartment from south at west
May 30, 2026 · Apt 4L
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed
Show 20 more ↓
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 6, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 6, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 6, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 6, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 6, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 6, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall at public hall, 3rd story
Sep 24, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 24, 2021
Open — Invalid certification - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 24, 2021
Open — Invalid certification - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Sep 24, 2021
Open — Invalid certification - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Sep 24, 2021
Open — Nov certified late - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 24, 2021
Open — Invalid certification - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Sep 24, 2021
Open — Invalid certification - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 24, 2021
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
May 13, 2015
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 4r, 4th story, 1st apartment from west at north
Mar 26, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors , in the entrance located at apt 4r, 4th story, 1st apartment from west at north
Jan 19, 2013 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 4r, 4th story, 1st apartment from west at north
Jan 19, 2013 · Apt 4R
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective window counter balances north 2 window upper sash. in the kitchen located at apt 4r, 4th story, 1st apartment from west at north
Jan 19, 2013 · Apt 4R
Open — First no access to re- inspect violation
DOB building violations · 31
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 21 more ↓
- Construction other optional
C-construction other optional
May 18, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Emergency none
Egncy-emergency none
Jul 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
ECB violations · 1
- Non-hazardous
Failure to maintain exterior building wall defect is biuikwork at base of parapit wall at facade loose and in danger of falling. remedy provided a sidewalk shed immediately make immediately lawful repairs in a
Jun 27, 1994 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Mold
May 26, 2026 · Apt 4L
Close - Water leak
Damp spot
May 26, 2026 · Apt 4L
Close - Water leak
Heavy flow
May 26, 2026 · Apt 4L
Close - Water leak
Slow leak
Feb 3, 2026 · Apt 4L
Close - Unsanitary condition
Mold
Feb 3, 2026 · Apt 4L
Close - General
Mailbox
Jun 10, 2023 · Apt 1R
Close - Unsanitary condition
Mold
Sep 20, 2021 · Apt 3L
Close - General
Mailbox
Mar 11, 2016 · Apt 1L
Close - Unsanitary condition
Pests
Oct 24, 2014 · Apt 4R
Close - Appliance
Refrigerator
Oct 24, 2014 · Apt 4R
Close
Show 40 more ↓
- Heating
Heat related
Jan 27, 2013 · Apt 1L
Close - General
Windows
Jan 17, 2013 · Apt 4R
Close - General
Window guards
Jan 17, 2013 · Apt 4R
Close - Heating
Heat related
Jan 10, 2012 · Apt 4R
Close - Plumbing
Water-leaks
Dec 16, 2011 · Apt 4R
Close - Paint/plaster
Ceiling
Dec 16, 2011 · Apt 4R
Close - General
Window guards
Nov 22, 2011 · Apt 4R
Close - Nonconst
Vermin
Mar 7, 2011 · Apt 4R
Close - Heating
Heat related
Dec 30, 2010 · Apt 2R
Close - Paint/plaster
Ceiling
Aug 7, 2010 · Apt 1R
Close - General
Floor
Aug 7, 2010 · Apt 1R
Close - Electric
Wiring
Aug 7, 2010 · Apt 1R
Close - General
Ventilation system
Aug 7, 2010 · Apt 1R
Close - Plumbing
Radiator
Aug 7, 2010 · Apt 1R
Close - General
Floor
Aug 7, 2010 · Apt 1R
Close - Paint/plaster
Wall
Aug 7, 2010 · Apt 1R
Close - Paint/plaster
Wall
Aug 7, 2010 · Apt 1R
Close - Paint/plaster
Wall
Aug 7, 2010 · Apt 1R
Close - Paint/plaster
Ceiling
Aug 7, 2010 · Apt 1R
Close - Heating
Heat related
Aug 7, 2010 · Apt 1R
Close - Nonconst
Vermin
Aug 7, 2010 · Apt 1R
Close - Nonconst
Vermin
Aug 7, 2010 · Apt 1R
Close - General
Doors
Aug 7, 2010 · Apt 1R
Close - Nonconst
Vermin
Jun 1, 2010 · Apt 2R
Close - Nonconst
Vermin
Jun 1, 2010 · Apt 2R
Close - Nonconst
Vermin
Jun 1, 2010 · Apt 2R
Close - Nonconst
Signage
Jun 1, 2010 · Apt 2R
Close - General
Locks
Jun 1, 2010 · Apt 2R
Close - General
Doors
Mar 7, 2010 · Apt 2R
Close - Nonconst
Vermin
Mar 7, 2010 · Apt 2R
Close - Nonconst
Vermin
Mar 7, 2010 · Apt 2R
Close - Heating
Heat related
Mar 7, 2010 · Apt 2R
Close - Heating
Heat related
Feb 22, 2010 · Apt 3R
Close - Heating
Heat related
Feb 8, 2010 · Apt 1L
Close - Nonconst
Rubbish
Jan 19, 2010 · Apt 3L
Close - General
Doors
Jan 19, 2010 · Apt 3L
Close - Heating
Heat related
Jan 19, 2010 · Apt 3L
Close - Paint/plaster
Radiator
Jan 19, 2010 · Apt 2L
Close - Plumbing
Radiator
Jan 19, 2010 · Apt 2L
Close - Nonconst
Rubbish
Jan 19, 2010 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 6,344 ft²
- Lot area
- 2,600 ft²
- Zoning
- R6A
- Community board
- 303
- Council district
- 36
- Block / lot
- 1621 / 44
- Assessed value
- $798,750
- Landmark / historic district
- No
HPD registration #345504, last renewed Sep 15, 2025.
Questions about 96 Malcolm X Boulevard
Who owns 96 Malcolm X Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 96 Malcolm X LLC.
Does 96 Malcolm X Boulevard have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 96 Malcolm X Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 96 Malcolm X Boulevard built?
City records list 1931 as the year it was built.
How many apartments are in 96 Malcolm X Boulevard?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.