roofy

61 Malcolm X Boulevard

Brooklyn, NY 11221BBL 3-01612-0006Map

Owner of record: 61 Malcolm X, LLC

61 Malcolm X Boulevard is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 10 residential units across 5 floors. The owner of record is 61 Malcolm X, LLC. HPD has recorded 172 housing violations here, most recently on May 5, 2026. 1 of the 50 most recent violations are still open.

HPD violations
172
DOB violations
20
ECB violations
7
HPD complaints
107

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 172

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout yard

    Nov 13, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 10, 2025

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east at center located at apt 1b, 1st story, 1st apartment from north at east

    Nov 18, 2024 · Apt 1B

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Nov 18, 2024 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from east at center located at apt 1b, 1st story, 1st apartment from north at east

    Nov 18, 2024 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective intercom system from building entrance to west wall in the kitchen located at apt 1b, 1st story, 1st apartment from north at east

    Nov 18, 2024 · Apt 1B

    Closed — Violation dismissed
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at rear of building at fire escape

    Nov 18, 2024

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of boxes, paint cans at public hall, 1st story

    Nov 18, 2024

    Closed — Violation dismissed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl , in the 1st bathroom from east located at apt 1b, 1st story, 1st apartment from north at east

    Nov 18, 2024 · Apt 1B

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Nov 18, 2024 · Apt 1B

    Closed — Violation dismissed
  • A

    Properly secure the loose hinges at closet door in the 1st room from east at center located at apt 1b, 1st story, 1st apartment from north at east

    Nov 18, 2024 · Apt 1B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Nov 3, 2024 · Apt 1B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling lower level in the 1st room from east located at apt 1b, 1st story, 1st apartment from north at east

    Nov 3, 2024 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling lower level in the 1st room from east located at apt 1b, 1st story, 1st apartment from north at east

    Nov 3, 2024 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective hinges at wood door at closet. upper level in the 1st room from east located at apt 1b, 1st story, 1st apartment from north at east

    Nov 3, 2024 · Apt 1B

    Closed — Violation dismissed
  • B

    Replace with new the missing marble saddle in the entrance located at apt 1b, 1st story, 1st apartment from north at east

    Nov 3, 2024 · Apt 1B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at east west and south walls at public hall, 1st story

    Nov 3, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective locking device at door at building entrance at public hall, 1st story

    Nov 3, 2024

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice at public hall, 1st story

    Nov 3, 2024

    Closed — Violation dismissed
  • C

    Remove the illegal fastening double cylinder lock at gate yard

    Nov 3, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at east west and south walls at public hall, 1st story

    Nov 3, 2024

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the floor at hallway at public hall, 1st story

    Nov 3, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 1b, 1st story, 1st apartment from north at east

    Nov 3, 2024 · Apt 1B

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 11, 2024

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 1b, 1st story, 1st apartment from north at east

    Mar 20, 2024 · Apt 1B

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 5 sq ft of mold at ceiling. in the private hallway located at apt 1b, 1st story, 1st apartment from north at east

    Mar 20, 2024 · Apt 1B

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective at bulkhead in the private hallway located at apt 1b, 1st story, 1st apartment from north at east

    Mar 20, 2024 · Apt 1B

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing at upper level duplex unit in the 2nd bathroom from east located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation closed
  • A

    Grade with proper slope to existing drain and pave with 4 inches of concrete the surface at rear yard

    Oct 6, 2023

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at north wall at public hall at rear at basement

    Oct 6, 2023

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall at upper level duplex unit in the 1st room from east at center located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at north wall at upper level duplex unit in the 1st room from east at center located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at north wall at upper level duplex unit in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation closed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at door in the entrance located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation closed
  • C

    Abate the infestation consisting of rodents rats in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in waste line at bathtub at upper level duplex unit in the 1st bathroom from east located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective door leading to rear yard at upper level duplex unit in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling at lower level duplex unit in the 1st room from east located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall and ceiling at lower level duplex unit in the 1st room from east located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx. 2 sq. ft. at north wall inside east closet at lower level duplex unit in the 1st room from east located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx. 1 sq. ft. at door casing at lower level duplex unit in the bathroom located at apt 1b, 1st story, 1st apartment from north at east

    Oct 6, 2023 · Apt 1B

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of rubber wedge placed at door leading to public hall stairs at public hall stairs, 1st story

    Oct 6, 2023

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of bicycle at public hall stairs, 1st story

    Oct 6, 2023

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at south wall, west wall and east wall at public hall stairs, 1st story

    Oct 6, 2023

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at south wall, west wall and east wall at public hall stairs, 1st story

    Oct 6, 2023

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at south wall, west wall and east wall at public hall stairs, 2nd story

    Oct 6, 2023

    Closed — Violation dismissed

DOB building violations · 20

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all work under job #321588340 due to contractor withdrawal

    Apr 23, 2021

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all work under job #321588340 due to contractor withdrawal

    Apr 23, 2021

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all work under job #321588340 due to contractor withdrawal

    Dec 31, 2020

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all work under job #321588340 due to contractor withdrawal

    Dec 31, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
Show 10 more ↓
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 7

  • Class - 1

    Summons for failure to provide unobstructed passageway due to fire escape ladder partially obstructed by garbage cans and metal wrought iron fence at front of premises, remove obstruction

    Nov 18, 2024 · Penalty $312

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#39017769n issued on 02/18/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c

    Sep 30, 2020

    Resolve
  • Class - 2

    At time of inspection,observed ongoing construction activities contrary to mayor's emergency executive order 120 & subsequent orders incorporating requirements of governor's executive order 202.34 & subsequent

    Aug 12, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection observed ongoing construction contrary to goverors executive order#202.6;202.8;202.11;202.13 & guidance published by the empire state development corporation pursuant to same.(witnessed

    Apr 1, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Right of entry - denied access at active site. premises 4 story nfp building under active permit # 322019999 with expiration date 11/05/2020. permit posted and refused by worker to inspect.; 28-103.13, comply w

    Feb 18, 2020

    Resolve
  • Class - 1

    At roof level 1 story vertical extension has been erected. approved job # 322019999 shows alteration of 4 story building. no permit issued for this extension. stop all work forthwith., obtain permit

    Feb 18, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Electrical work without a permit. removed all of the electrical wiringfrom the top floor to the basement without first obtaining an electrical permit. remedy: obtain a permit

    Dec 26, 2019 · Penalty $400

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Jul 16, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 9, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Mar 9, 2026 · Apt BASEME

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 24, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 9, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 19, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 19, 2025 · Apt BLDG

    Close
  • General

    Signage missing

    Dec 19, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 12, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 9, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Dec 2, 2024 · Apt 1B

    Close
  • Plumbing

    Toilet

    Dec 2, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2024 · Apt 1B

    Close
  • General

    Ventilation system

    Dec 2, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Dec 2, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 2, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Dec 2, 2024 · Apt 1B

    Close
  • Plumbing

    Radiator

    Dec 2, 2024 · Apt 1B

    Close
  • Door/window

    Door frame

    Dec 2, 2024 · Apt 1B

    Close
  • Water leak

    Damp spot

    Dec 2, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Nov 20, 2024 · Apt 1B

    Close
  • Outside building

    Roof door/hatch

    Nov 20, 2024 · Apt 1B

    Close
  • Water leak

    Slow leak

    Nov 20, 2024 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Nov 20, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Nov 20, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Nov 20, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Nov 20, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Nov 14, 2024 · Apt 1B

    Close
  • Outside building

    Roof door/hatch

    Nov 14, 2024 · Apt 1B

    Close
  • Water leak

    Slow leak

    Nov 14, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Nov 14, 2024 · Apt 1B

    Close
  • Plumbing

    Sewer

    Nov 14, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Nov 14, 2024 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Nov 14, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Nov 14, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Oct 31, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Oct 31, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Oct 31, 2024 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Oct 31, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Oct 31, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 31, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Oct 31, 2024 · Apt 1B

    Close
  • Safety

    Fire escape

    Oct 31, 2024 · Apt 1B

    Close
  • Door/window

    Door

    Oct 31, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Oct 31, 2024 · Apt 1B

    Close
  • Water leak

    Damp spot

    Mar 19, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Mar 19, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Mar 19, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Jan 7, 2024 · Apt 5A

    Close
  • Plumbing

    Water supply

    Nov 20, 2023 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1931
Floors
5
Residential units
10
Building area
9,851 ft²
Lot area
2,500 ft²
Zoning
R6A
Community board
303
Council district
36
Block / lot
1612 / 6
Assessed value
$1,106,100
Landmark / historic district
No

HPD registration #345905, last renewed Oct 24, 2025.

Questions about 61 Malcolm X Boulevard

Who owns 61 Malcolm X Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is 61 Malcolm X, LLC.

Does 61 Malcolm X Boulevard have violations?

Yes. NYC HPD has recorded 172 housing violations at this property.

Is 61 Malcolm X Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 61 Malcolm X Boulevard built?

City records list 1931 as the year it was built.

How many apartments are in 61 Malcolm X Boulevard?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.