roofy

Violations at 982 Dekalb Avenue

Brooklyn, NY 11221 · BBL 3-01602-0019 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

17 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 17, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations

The newest 50 of 62 ECB violations. The city keeps the complete history.

  • Class - 2

    Reissue:35677505h-failure to maintain building in code-compliant manner.2nd floor exit b doors not self-closing.1b,3rd floor rm 320,exit h and auditorium and cafe exit doors.rem:comply with code.

    May 8, 2026 · Penalty $3,125

    Active
  • Class - 2

    Reissue#35717442n failure to provide required corridor width-provide required corridor width per bc 101.6.2;27-369 security desk blocks hallway traffic.rem:comply with code.

    May 8, 2026 · Penalty $1,562

    Active
  • Class - 2

    At time of inspection sidewalk shed inoperable lights at exposure #1 (dekalb ave) causing a potential hazards to public, comply to code specifications

    Feb 13, 2026 · Penalty $10,000

    Active
  • Class - 2

    Reissue: failure to maintain building in code-compliant manner: provide required corridor witdth per: bc 10162; 27-369. security desk @ entrance blocking doorway. remedy: comply with code.

    Apr 28, 2025 · Penalty $625

    Active
  • Class - 2

    Reissue #36671776m. failure to maintain building in code-compliant manner. at time of my inspoection i obsevred at 2nd floor exit "b" 2 doornot working properly also at 1b 3rd floor room 320 door not self-closi

    Apr 26, 2024 · Penalty $1,562

    Active
  • Class - 2

    Reissue#35671777y failure to maintain buildings in code-compliant manner.provide required corridor width per bc 1016.2;27-369 at time of my inspection i observed at the 1st floor right in front of the main entr

    Apr 26, 2024 · Penalty $1,562

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner.provide requrired corridor width per bc 1016.2;27-369.noted:at 1st floor right in front of main entrance,security desk is occupying more than half of the co

    Feb 8, 2023 · Penalty $625

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner.noted:at 2nd floor exit b one of four door and at 3rd floor room 320 door do not closeproperly.rem:repair/replace door.

    Feb 8, 2023 · Penalty $625

    Resolve
  • Class - 2

    Reissue: 35402574z failure to maintain bldg in code compliant manner: water penetration in classes throughout. remedy: comply with code.

    Apr 14, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Exit door not self-closing.observed at exit 6 the door gets stuck & isnot self-closing. remedy: repair/replace door.

    Apr 13, 2020 · Penalty $625

    Resolve
  • Class - 2

    Stair and/or floor identification signs missing &/or defective.observed at several various locations throughout school at staircase w/required signage missing in the stairway or on the outside of stairwell door

    Apr 13, 2020 · Penalty $625

    Resolve
  • Class - 2

    Exit door nto self closing. at the time of inspection and obseved defective door closer at main entrance exit door facing kosciuszko st. rmdy: repair/replace door.

    Apr 9, 2019

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner at the time of inspection and obseved water penetration through brickworks onto classroom caused spalling on bottom of walls some are near electrical out

    Apr 9, 2019

    Resolve
  • Class - 2

    Failure to maintain bldg in code complaint manner. lack of emergency lighting for exits,exit discharges & public corridors per bc 1006.1;27-542. noted: at gymnasium,cafeteria & above room door #137,inoperative

    Mar 13, 2018

    Resolve
  • Class - 2

    Reissue #35094892m. failure to maintain bldg in code-compliant mannerprovide required corridor width per bc 1016.2; 27-369 (partial obstruction) noted: combustible materials in corridors. doors throughout all

    Mar 25, 2015

    Resolve
  • Class - 2

    Combustible materials in corridors. doors throughout all floors covered with combustible materials. bulletin boards between rm 332 & 328 & between rm 425 & 430 have combustibles protruding into corridor, also

    May 22, 2014

    Resolve
  • Class - 2

    Exit doors not self closing. door to court yard do not close properly because they are racked. missing smoke corridor door between rm 225 & 219. remedy: repair or replace doors.

    May 22, 2014

    Resolve
  • Class - 2

    The plaster on the wall is spalling located in room 204 (2nd floor level). remedy: repair and/or replace plaster on wall.

    Jan 20, 2012

    Resolve
  • Class - 2

    3a,50a,b. mobile federal ftsh boiler sn 5438, (107000-06) 1988, oil. 50a- mobile low pressure steam boiler in service at the referenced location w/corroded flue pipe and smoke stack. hazardous operating

    Mar 5, 2010 · Penalty $2,500

    Resolve
  • Class - 2

    Reissue:34435120z exterior foundation wall has become porous & allowing rain water into the building causing interior damages in room b1 at cellar level.remedy:water proof exterior foundation wall.

    Feb 18, 2010

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. noted: cafeteria exit "6" 1st flr level has an illegal hardware.(sliding dead bolt) on the exit door. remedy: repair and/or replace sliding dead bolt on ex

    Jul 9, 2008

    Resolve
  • Class - 2

    Reissue: 34569895h failure to maintain building in code compliant manner. noted: no fire stopping applied at pipe penetration through the wall in room b7 & b15 (gas & electrical meter room) on cellar level.

    Jul 9, 2008

    Resolve
  • Class - 2

    Reissue: 34569893y failure to maintain building walls or appurtencancenoted: foundation wall has become porous and allowing rain water into the building causing interior damages in room b1 on the east side at

    Jul 9, 2008

    Resolve
  • Non-hazardous

    Failure to maintain exterior. noted: throughout bldg water penetrationhas caused various cracks to facade. remedy: maintain exterior (stop water penetration & make repairs to facade).

    Mar 21, 2007

    Resolve
  • Non-hazardous

    Failure to maintain. noted: interior stairway to basement in disrepairdue to water penetration on east side. remedy: repair or replace stairs.

    Mar 21, 2007

    Resolve
  • Non-hazardous

    Failure to maintain. noted: corridor door at 3rd floor between rooms 318 & 320 is not operating to code. remedy: repair or replace door.

    Mar 21, 2007

    Resolve
  • Non-hazardous

    Re-issue # 34491016p. noted: firestopping is missing at basement in gas meter rooms b7 & b15. remedy: install firestopping.

    Mar 21, 2007

    Resolve
  • Non-hazardous

    Re-issue # 34491013j. noted: water penetration at every floor (east side wall dekalb ave). remedy: repair and water-proof wall.

    Mar 21, 2007

    Resolve
  • Non-hazardous

    Re-issue # 34491012h. noted: defect is water penetration through east side basement wall in room b1. remedy: repair wall.

    Mar 21, 2007

    Resolve
  • Hazardous

    Note: fire stopping is missing at basement in gas meter room # b7 & # b15. remedy: install fire stopping.

    Jan 26, 2006

    Resolve
  • Non-hazardous

    Note: exit doors not self-closing at 1st floor exit #4. remedy: repair/replace door.

    Jan 26, 2006

    Resolve
  • Non-hazardous

    Note: plaster is spalling and falling apart at bulkhead (4th floor) exit #6 & #7. remedy: repair bulkhead.

    Jan 26, 2006

    Resolve
  • Non-hazardous

    Note: water penetration at every floor east side wall (dekalb ave). remedy: repair entire wall.

    Jan 26, 2006

    Resolve
  • Non-hazardous

    Re-issue vio. # 34435120z. note: defect is water penetrating through east side basement wall in room #b1. remedy: repair wall.

    Jan 26, 2006

    Resolve
  • Hazardous

    Failure to maintain.defect is water penetrating through east side basement wall in room #b1.remedy:repair wall

    Apr 14, 2004

    Resolve
  • Hazardous

    Failure to maintain.defect is cement plaster above exit #6 door is crack and loose.remedy:repair cement wall

    Apr 14, 2004

    Resolve
  • Non-hazardous

    "reissue" failure to maintain.defects are kitchen storage rooms doors and frames are rotten sagging and bulging.remedy:replace doors and frames

    Apr 14, 2004

    Resolve
  • Non-hazardous

    "reissue" failure to maintain.defects are sagging and bulging concretepaved surface causing tripping hazard.locations are:-(1)east side delivery entrance way (stuyvesant ave side) (2)main entrance handicap

    Apr 14, 2004

    Resolve
  • Non-hazardous

    "reissue" failure to maintain.defect is:cafeteria west side exit door frame loose and sagging making door unable to open fully.remedy:repairand/or replace door

    Apr 14, 2004

    Resolve
  • Non-hazardous

    Panic hardware inoperative. defect is: auditorium south side exit door panic hardware is defective. remedy: replace panic hardware

    Mar 24, 2003

    Resolve
  • Non-hazardous

    Failure to maintain. defects are: 1st floor south side storage room adjacent to cafeteria metal door and frame are rotten and sagging. remedy: replace door and frame

    Mar 24, 2003

    Resolve
  • Non-hazardous

    Failure to use panic hardware where required by law. note- auditorium/gymnasium occupancy # 655 and no panic hardware install on north side exit doors. remedy: install panic hardware

    Mar 24, 2003

    Resolve
  • Non-hazardous

    Failure to maintain exterior wall. defect are sagging and bulging concrete paned surface causing tripping hazard. locations are -(1) east side delivery entrance way (styuvesant ave.side) (2) main entrance handi

    Mar 24, 2003

    Resolve
  • Non-hazardous

    Failure to maintain. defect is: cafeteria west side exit door frame loose and sagging make door unable to closed. remedy: repair and /or replace door

    Mar 24, 2003

    Resolve
  • Non-hazardous

    Failure to provide panic hardware in place of assembly location noted. at anditorium panic bars are missing. remedy: provide panci hardware.

    Apr 16, 2002

    Resolve
  • Non-hazardous

    Failure ot maintain building defects note concrete broken at cieling in room 308, large vertical cracks throughout basement hallway concrete partch defective (bulging, crumbling) 121 fan room. remedy; maintain

    Apr 16, 2002

    Resolve
  • Hazardous

    Failure to maintain building hazardous. defects note electrical boxes mounted on floor (2 graders) of 231 creating atrip hazard. remedy; remove electrical boxes from floor immediately.

    Apr 16, 2002

    Resolve
  • Non-hazardous

    Failure to maintain building defects holed; rooms 412, 404, 308, 120 large cracks in walls (120 has a large hole). remedy: maintain buildingrepari all walls.

    Apr 16, 2002

    Resolve
  • Non-hazardous

    Failure to maintain building exterior wall defect is defective windows throughout school builidng remedy replace / repair defective windows

    Apr 27, 2001

    Resolve
  • Non-hazardous

    Failure to maintain building: defect are waterdamage ceiling in rm 151 and store rm off auditorium's stage. remedy; repair ceilings.

    Apr 27, 2001

    Resolve