Violations at 721 Willoughby Avenue
Brooklyn, NY 11206 · BBL 3-01588-0001 · Back to the property
HPD housing violations
The newest 50 of 1,059 HPD violations. The city keeps the complete history.
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at east located at apt 9k, 9th story, 2nd apartment from north at east
Sep 23, 2026 · Apt 9K
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 9k, 9th story, 2nd apartment from north at east
Sep 23, 2026 · Apt 9K
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north at east located at apt 9k, 9th story, 2nd apartment from north at east
Sep 23, 2026 · Apt 9K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 9k, 9th story, 2nd apartment from north at east
Sep 23, 2026 · Apt 9K
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2j, 2nd story, 3rd apartment from north at east
Sep 1, 2026 · Apt 2J
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective base cabinet at south in the kitchen located at apt 6r, 6th story, 3rd apartment from west at north
Aug 2, 2026 · Apt 6R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 6r, 6th story, 3rd apartment from west at north
Aug 2, 2026 · Apt 6R
Open — Nov sent out - BHazardous
Refit closet door at east wall. in the private hallway located at apt 6r, 6th story, 3rd apartment from west at north
May 22, 2026 · Apt 6R
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater then 10 square feet at south and east and west walls in the bathroom located at apt 6r, 6th story, 3rd apartment from west at north
May 22, 2026 · Apt 6R
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6r, 6th story, 3rd apartment from west at north
May 22, 2026 · Apt 6R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6r, 6th story, 3rd apartment from west at north
May 22, 2026 · Apt 6R
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6r, 6th story, 3rd apartment from west at north
May 5, 2026 · Apt 6R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6r, 6th story, 3rd apartment from west at north
May 5, 2026 · Apt 6R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from north located at apt 9a, 9th story, 1st apartment from south at west
Apr 4, 2026 · Apt 9A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north located at apt 9a, 9th story, 1st apartment from south at west
Apr 4, 2026 · Apt 9A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 9a, 9th story, 1st apartment from south at west
Apr 4, 2026 · Apt 9A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north at west located at apt 9a, 9th story, 1st apartment from south at west
Apr 4, 2026 · Apt 9A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from north at west located at apt 9a, 9th story, 1st apartment from south at west
Mar 21, 2026 · Apt 9A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 4th room from north at west located at apt 9a, 9th story, 1st apartment from south at west
Mar 21, 2026 · Apt 9A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north located at apt 9a, 9th story, 1st apartment from south at west
Mar 21, 2026 · Apt 9A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 9a, 9th story, 1st apartment from south at west
Mar 21, 2026 · Apt 9A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 9a, 9th story, 1st apartment from south at west
Mar 21, 2026 · Apt 9A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 9a, 9th story, 1st apartment from south at west
Mar 21, 2026 · Apt 9A
Open — Nov sent out - ANon-hazardous
Properly secure the loose closet door at east wall in the private hallway located at apt 6r, 6th story, 4th apartment from west at north
Mar 10, 2026 · Apt 6R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6r, 6th story, 4th apartment from west at north
Mar 10, 2026 · Apt 6R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6r, 6th story, 4th apartment from west at north
Mar 10, 2026 · Apt 6R
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective base cabinet at south wall in the kitchen located at apt 6r, 6th story, 4th apartment from west at north
Mar 10, 2026 · Apt 6R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east , section at north
Feb 20, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Feb 8, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Feb 8, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east closet walls and ceiling in the private hallway located at apt 2c, 2nd story, 2nd apartment from south at west
Feb 8, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Feb 8, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Feb 8, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... ledd than 10 sq ft at ceiling in the bathroom located at apt 9k, 9th story, 2nd apartment from north at east original violation 18544187 issued 31-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 31, 2025 · Apt 9K
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective electrical outlet, 1st from east at south in the 3rd room from north located at apt 9k, 9th story, 2nd apartment from north at east
Dec 31, 2025 · Apt 9K
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 9k, 9th story, 2nd apartment from north at east
Dec 31, 2025 · Apt 9K
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... ledd than 10 sq ft at ceiling in the bathroom located at apt 9k, 9th story, 2nd apartment from north at east
Dec 31, 2025 · Apt 9K
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective rubber refrigerator door gasket in the kitchen located at apt 6r, 6th story, 3rd apartment from west at north
Dec 31, 2025 · Apt 6R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6r, 6th story, 3rd apartment from west at north
Dec 31, 2025 · Apt 6R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the foyer , the private hallway , the 3rd room from east at south, the 2nd room from east, the kitchen located at apt 9a, 9th story, 3rd apartment from east at south
Nov 1, 2025 · Apt 9A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 3rd room from east at south located at apt 9a, 9th story, 3rd apartment from east at south
Nov 1, 2025 · Apt 9A
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 3rd room from east at south located at apt 9a, 9th story, 3rd apartment from east at south
Nov 1, 2025 · Apt 9A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at south located at apt 9a, 9th story, 3rd apartment from east at south
Nov 1, 2025 · Apt 9A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 9a, 9th story, 3rd apartment from east at south
Nov 1, 2025 · Apt 9A
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at south wall in the private hallway located at apt 9a, 9th story, 3rd apartment from east at south
Nov 1, 2025 · Apt 9A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 9a, 9th story, 3rd apartment from east at south
Nov 1, 2025 · Apt 9A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 9a, 9th story, 3rd apartment from east at south
Nov 1, 2025 · Apt 9A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at east wall inside closet (2nd from north at east) in the private hallway located at apt 8l, 8th story, 1st apartment from south at west original violation 18303536 issued 16-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Oct 16, 2025 · Apt 8L
Open — Violation will be reinspected
DOB building violations
The newest 50 of 141 DOB violations. The city keeps the complete history.
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Dec 30, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2020
Dob violation - resolved - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2018
Dob violation - resolved - High pressure boiler boiler required
Violation issued for failure to file 2016 annual high pressure boiler inspection
Jun 22, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 23, 2017
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2012 annual high pressure boiler inspection
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2012
Dob violation - resolved
ECB violations
The newest 50 of 90 ECB violations. The city keeps the complete history.
- Class - 2
Failure to maintain elevator in code compliant manner. upon inspection, the device is found to be out of service. as per nyc building code 28-301.1, all service equipment shall be maintained in a safe condition
Aug 19, 2026 · Penalty $625
Active - Class - 2
Work w/o permit.on 12/27/22 observed work being performed on exp #3(east elevation)on suspended scaffold with no visible permits posted.remedy:obtain all permits required.
Dec 27, 2022
Resolve - Class - 1
Failure to provide adequate safety measures such as shed netting etc where required to protect & secure public safety from documented unsafe facade as per 1rcny 103-04.facade technical report file as unsafe by
Dec 27, 2022
Resolve - Class - 1
Cease use item: rope gripper does not engage when unintended movement is tested. 125 %weights required for reinspection. class 2 items: illegal vestibule condition at basement level; make arrangements to confor
Apr 21, 2022 · Penalty $3,125
Resolve - Class - 1
Cease use item: rope gripper does not engage when unintended movement is tested. 125 %weights required for reinspection. class 2 items: illegal vestibule condition at basement level; make arrangements to confor
Apr 21, 2022 · Penalty $3,125
Resolve - Class - 2
Correct violation and submit the certificate of correction
Jun 28, 2021 · Penalty $625
Active - Class - 2
Domestic hw boiler= fire box insulation defective ýexcessive heat rear jacket¨/hw tank safety discharge incorrect; correct violation and submit the certificate of correction
Jun 28, 2021 · Penalty $625
Active - Class - 2
Domestic hw boiler= fire box insulation defective ýexcessive heat rear jacket¨/insulation rap on hw tank defective/hw tank safety discharge incorrect; correct violation and submit the certificate of correction
Jun 28, 2021 · Penalty $625
Active - Class - 2
Debris left in boiler room; correct violation and submit the certificate of correction
Jun 28, 2021 · Penalty $625
Active - Class - 2
Domestic hw boiler = poor flame ýnoise and vibration¨/valve leaking above; correct violation and submit the certificate of correction
Jun 28, 2021 · Penalty $625
Active - Class - 2
Domestic hw boiler= defective fire box insulation ýrear boiler jacket excessive heat¨/debris in boiler room; correct violation and submit the certificate of correction
Jun 28, 2021 · Penalty $625
Active - Class - 2
Debris left in boiler room; correct violation and submit the certificate of correction
Jun 28, 2021 · Penalty $625
Active - Class - 1
02x17 alarm bell not working.
May 16, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35262078h issued on 08/23/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for failure to conduct
Apr 8, 2019 · Penalty $625
Resolve - Class - 2
Boiler 03,04, are unregistered boilers
Apr 3, 2019
Resolve - Class - 2
Failure to comply with commissioners order contained in summons/ violation #35262078h issued on 08/23/17 and to file a certificate of correction pursuant to28.201.1 and 1rcny 102-01 (d) (2). an acceptible
Aug 30, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to conduct or file a final inspection for completed work within yr of permit expiration.alt2#320150910 which expired 04/30/11 is completed and substantially conform to plan.applicant has not file a fina
Aug 23, 2017 · Penalty $800
Resolve - Class - 2
97x10 restore this elevator to service.
Mar 24, 2017
Resolve - Class - 2
42l11,59m07,61c09. 42l-replace defective br relay on controller; 59m-provide brake maintenance tag.
Mar 2, 2016
Resolve - Class - 1
05b01,05x10,10h11,08v01,59m07n64c09. 05b-adjust gap on the back of the car door; 05x-repair door zone restrictor; 08v-adjust leveling on basement lvel; 59m-provide brake maintenance tag.
Mar 2, 2016 · Penalty $5,000
Resolve - Class - 2
97-x-07:97-x-restore to service.
Nov 30, 2015
Resolve - Class - 3
Work without a permit. work noted: at 1st floor level at day care installed 5 industrial electrical heater bolted to wall with anchors & installed 220 vlt. bx cable with box in different locations. remedy: obta
Feb 11, 2015 · Penalty $100
Resolve - Class - 2
05b01 adjust door zone restrictor.
Jan 20, 2015
Resolve - Class - 2
16b11,67x10,42x10,100p15,40p15,11m07. 16b- provide designated lobby tag. 42x- door position monitor. 100,40p,11m- provide keys and access tomachine room, bsmt & car station panel.
Feb 5, 2013 · Penalty $2,500
Resolve - Class - 2
17h11,17d06,70o02,42x10,100p16,40p16. 17h,d- replace/secure where needed. 42o- door position monitor. 100,4op- provide keys and access to all equipment for the purposes of full inspection and to provide
Feb 5, 2013 · Penalty $2,500
Resolve - Class - 2
Sidewalk shed does not meet code specifications. noted: sidewalk shed missing sections of parapet boards at several locations, also debris netting ripped or missing throughout where required. remedy: conform
May 14, 2011 · Penalty $2,400
Resolve - Class - 1
Unlawfully continue work while on notice of a stop work order. noted: on 5/3/11 a swo & violations were issued for numerous hazardous conditions at job site upon inspection found worker on suspended scaffold
May 10, 2011 · Penalty $4,800
Resolve - Class - 1
Rigger failed to name a designated foreman. noted: no designated foreman on site w/proper certification. no foreman i.d. remedy: comply w/notice.
May 3, 2011 · Penalty $1,600
Resolve - Class - 1
Inadequate safety measures: operation of hoisting equipment in unsafe manner. noted: at time of inspection of material hoist found wire cable w/defects, broken wire, bird caging, numerous flat spots on cable,
May 3, 2011 · Penalty $4,800
Resolve - Class - 1
No record of daily inspection of suspended scaffold performed by authorized person at site. noted: no daily record of inspection for suspended scaffolds in use for 5.3.11 or any other dates for this job site
May 3, 2011 · Penalty $2,400
Resolve - Class - 1
Smoking at construction site - noted: at exp #3, observed a scaffold worker on a suspended scaffold smoking a cigarette. remedy: comply w/code.
May 3, 2011 · Penalty $2,400
Resolve - Class - 1
Failed to file evidence of compliance w/disability benefits law - noted: expired disability insurance as of 12.10.10, @ time of inspection job site was active - w/rigging in use. remedy: obtain, maintain
May 3, 2011 · Penalty $1,250
Resolve - Class - 2
Failed to notify dept/obtain permit prior to use/installation off outrigger beams in connection w/suspend scaffold - noted: no outrigger beam notification for suspended scaffolds at exp 2,3, & 4, in use at time
May 3, 2011 · Penalty $800
Resolve - Class - 2
Failed to notify dept/obtain permit prior to use/installation off 'c' hooks in connection w/suspended scaffold. noted: no 'c' hook notification for suspended scaffold off 'c' hooks at exp 3. remedy: notify the
May 3, 2011 · Penalty $800
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: at time of inspection no approved plans on site (cd-5) for outrigger beams and material hoist. remedy: provide plans. partial
May 3, 2011 · Penalty $500
Resolve - Class - 1
Supervision/use of rigging equipment w/o a rigger's license. noted: no license rigger on site for suspended scaffolds hanging off parapet clamps inside of court yard @ b-13/b-15. remedy: discontinue use -
Dec 28, 2010 · Penalty $4,800
Resolve - Class - 2
97x07. 97x- restore to service
Sep 27, 2010 · Penalty $500
Resolve - Class - 1
97x07. 97x- restore to service call 212-566-5539 for complete inspection
Sep 27, 2010 · Penalty $1,000
Resolve - Class - 3
10h11,05d06,99m05,70o02,12b07. 10h- car gate gibbs worn & loose. 05- car gate edge loose & sharp at lower side. 99- missing 1 yr gov tag
Sep 27, 2010 · Penalty $200
Resolve - Class - 3
99m05,62o02,09h11,70o02. 99m- missing 1 yr gov tag. 62o- motor brush holder dirty. 09h- car saddle worn
Sep 27, 2010 · Penalty $500
Resolve - Class - 2
97/x/10/97-repair & restore elevator to service so that a full insp can be made by this dept
Sep 21, 2010 · Penalty $500
Resolve - Class - 2
16t07,16r11,16j01,69l11,42g11,61g11,42t16,56y13,59y02,59e01,17h11,17d06,16q03,37y02,67x10,39q03,53hll,100p16,71p16,77q03,77y02,70o02,08v01,11t07,99m05,100i11,10j01,10h11,11i10.(16t,j)provide brail tags where mi
Sep 14, 2010 · Penalty $2,500
Resolve - Class - 2
12x10,67x10,11t07,10h11,10o01,17h11,05j01,69l11,61g11,56y13,59y02,99m05,58h11,16q03,32o02,29q03,11i10,16t07,16j01,08v01,05i11,100p16,71p16,16r11,40r09,70o02,77q03,53h11.(67x)phone.(11t)capacity & device #.(10h,
Sep 14, 2010 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg in code compliant manner noted:at various points throughout cracks spalling and loose mortar along facades on willioughby avenue and marcus garvey blvd,at time of inspection.remedy
May 17, 2010 · Penalty $5,000
Resolve - Class - 2
11b,18b,50ab,34b:50a-must have blow down tank (operating 120psi), 50b-no backflow preventor 11b-blow down valve must be h/p.
Jan 15, 2010 · Penalty $250
Resolve - Class - 3
70o2.23x10.70o pit dirty 23x lobby hall call no down
Jan 6, 2010 · Penalty $100
Resolve - Class - 3
16x10.70o2.16x 8fl hoist door not opening in down and up direction 70opit dirty
Jan 6, 2010 · Penalty $200
Resolve - Class - 2
97x10. 97x- repair & restore elevator to service so that a full inspection can made by this dept.
Dec 28, 2009 · Penalty $250
Resolve - Class - 2
97x10. 97-restore elevator back to service.
Sep 14, 2009
Resolve - Class - 3
97x07.97xrestore to service
Feb 17, 2009
Resolve