roofy

47 Marcous Garvey Blvd

Brooklyn, NY 11206BBL 3-01580-0001Map

Owner of record: NYC Housing Authority

47 Marcous Garvey Blvd is an elevator apartment building built in 1951 in Brooklyn, 11206. It has 1,099 residential units across 7 floors. The owner of record is NYC Housing Authority. HPD has recorded 8 housing violations here, most recently on November 9, 2016. 8 of the 8 most recent violations are still open.

HPD violations
8
DOB violations
83
ECB violations
73
HPD complaints
1

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 9, 2016

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 8

  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at south wall approx 10 sq. ft. in the kitchen located at apt 1e, 1st story, 1st apartment from north at east

    Nov 9, 2016 · Apt 1E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 1e, 1st story, 1st apartment from north at east

    Nov 9, 2016 · Apt 1E

    Open — Nov sent out
  • B

    Replace with new the missing wood cabinet at south wall in the kitchen located at apt 1e, 1st story, 1st apartment from north at east

    Nov 9, 2016 · Apt 1E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 1e, 1st story, 1st apartment from north at east

    Nov 9, 2016 · Apt 1E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1e, 1st story, 1st apartment from north at east

    Nov 9, 2016 · Apt 1E

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of odor from south wall in the kitchen located at apt 1e, 1st story, 1st apartment from north at east

    Nov 9, 2016 · Apt 1E

    Open — Nov sent out
  • B

    Properly repair the broken or defective electrical receptacle at west wall in the 1st room from north at east located at apt 4a, 4th story, apartment at east

    Jan 8, 2009 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair the broken or defective electrical receptacle at west wall in the 1st room from north at west located at apt 4a, 4th story, apartment at east

    Jan 8, 2009 · Apt 4A

    Open — Nov sent out

DOB building violations · 83

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2020

    Jun 20, 2021

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst

    Sep 6, 2019

    Dob violation - dismissed
Show 40 more ↓
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Aug 2, 2019

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jun 17, 2019

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jun 13, 2019

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    May 10, 2019

    Dob violation - active
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Nycha elev annual inspection/test elevatorrequired

    Vio issued to nycha elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Nycha elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Jun 1, 2016

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 4, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 4, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Dec 4, 2013

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Aug 9, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Aug 9, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Aug 9, 2013

    Dob violation - dismissed
  • Facade facade optional

    Cycle 7 unsafe report filed

    Jul 8, 2013

    Dob violation - active
  • Facade facade optional

    Cycle 7 unsafe report filed

    Jul 8, 2013

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Nov 15, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Nov 12, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Apr 22, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Mar 26, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Mar 23, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Mar 18, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Mar 17, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Mar 17, 2010

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code complaint manner remedy; remove unsound brick masonry and repair defects forthwith

    Oct 3, 2009

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code complaint manner remedy; remove unsound concrete and repair defects forthwith

    Oct 3, 2009

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code complaint manner remedy; remove unsound masonry and repair defects forthwith

    Oct 3, 2009

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code complaint manner, remedy; remove unsound concrete and repair defects forthwith

    Oct 3, 2009

    Dob violation - dismissed

ECB violations · 73

  • Class - 1

    Failure to take required measures to secure public safety from documented unsafe facade as per 1rcny 103-04.unsafe notification#unsafe-1009357-10b-001,dated 03/26/2026 filed by qewi(pe/ra)documented unsafe faca

    May 6, 2026 · Penalty $10,000

    Active
  • Class - 1

    Failure to take required measures to secure public safety from documented unsafe facade as per 1rcny 103-04.unsafe notification#unsafe-1009350-10b-001 dated 04/07/2026 filed by qewi(pe/ra)documented unsafe faca

    May 6, 2026 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to take required measures to secure public safety from documented unsafe facade as per 1rcny 103-04.unsafe notification#unsafe-1009354-10b-001,dated 04/08/2026 filed by qewi(pe/ra)documented unsafe faca

    May 6, 2026 · Penalty $10,000

    Resolve
  • Class - 2

    Cs allowed workers to work on soe /confined space w/out proper means of egress/ ingress, missing guardrails, caz, signs, lights, no safe protocols recorded/ documented. work area is detrimental zone for workers

    Jul 10, 2025 · Penalty $10,000

    Active
  • Class - 2

    Observed a deep soe w/ wood shoring covered by plywood creating confined space , only 1 extension ladder for egress/ ingress. work being perfomed under high temperatures. work area & structure is a detrimental

    Jul 10, 2025 · Penalty $10,000

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner: directors office has a small entrance where the entire wall has water damage. also note: there's a strong stentch/smell that smells loke mold throughout en

    Apr 24, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner: illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. remedy: comply with code.

    Apr 24, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building exterior wall(s) or appurtenances. note:-at the time of inspection observed at expo #4 south elevation crack/spalled concrete from canopy slab. remedy: maintain building exterior wa

    Aug 19, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909351. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909352. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Active
Show 40 more ↓
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909357. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #909354. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.noted the overhang on ground level that runs above each classroom exit door has excessive spallin paint in various areas throughout creating a hazardous con

    Feb 8, 2023 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain exterior building facades/walls and appurtenances.note:observed at exposure 4,north elevation:broken glass window pane at two location 2nd floor.rem:maintain exterior building facades/walls

    Aug 24, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to take and provide safety measures adequate safety measures. (sidewalk shed; netting etc) where required to protect and secure public safety from unsafe facade as per 1 rcny 103-04. facade fisp3

    Jul 3, 2019

    Resolve
  • Class - 1

    Failure to required measures to protect public from documents unsafe facade as noted: building filed a unsafe facade report on 5/10/19 & as of 6/11/19 safety measures are not adeqaute to protect public from

    Jun 11, 2019

    Resolve
  • Class - 1

    Bc 3301.8.1 tampering of evidence @time of inspection in response to complaint #3699671 due to an accident a scaffold erector was injured, because steel beam fell on his shoulders, observed sidewalk shed in the

    Apr 29, 2019

    Resolve
  • Class - 2

    Work without a permit. at time of inspection in response to complaint # 3699671 observed sidewalk shed in the process of being erected.upon research in dob system noted that no permit was issued for the

    Apr 29, 2019

    Resolve
  • Class - 1

    Failure to safeguard person & property @time of inspection in responseto complaint #3694671 due/to a scaffolding erector being injured, observed sidewalk shed in place amd in the process of being erected.accor

    Apr 29, 2019

    Resolve
  • Class - 1

    3301.8.1 tmpering of evidence.at the time of inspection in response to complaint # 3699671,scaffold erector was injured because a steel i beam fell on his shoulder.observed sidewalk shed in the process

    Apr 29, 2019

    Resolve
  • Class - 2

    B254, 50a,50b,50c,50d. as per class 2 b254 28-301.1 violating conditions 50a) relief valve leaking, 50b) low water cut off blow leaking 50c)pulg or removoe vacum break or on water(column)-50d)missing air gap &

    Mar 5, 2019

    Resolve
  • Class - 2

    B254,28b,50a,11c. as per class 2 b254 28 301.1 violating 11c boiler blowdown valve leaking 28b tubes leaking.50a)pulg or remove vaccum breaker on water(column).correct all violating conditions & submit cert of

    Mar 5, 2019

    Resolve
  • Class - 2

    B254, 50a,50b as per class 2 b254 28-301.1 vioalting conditions 50a relief valves leaking. 50b corrosion/leak bottom of boiler correct violating conditions and submit certificate of correction.

    Mar 5, 2019

    Resolve
  • Class - 2

    B254, 50a, 50b, 50c.as per class 2 b254 28-301.1 violation conditions 50a) blow down valve on water column leaking 50b) plug or remove vaccum breaker from water column, 50c relief valve leakig correct all viol

    Mar 5, 2019

    Resolve
  • Class - 1

    Failure to take provide safety measure, such as sidewalk shed's, fence, etc. where require to protect and secure public safety from documentunsafe facade as per 1rcny-103-04. facade technical report file unsafe

    Oct 23, 2018

    Resolve
  • Class - 2

    Failure to submit a requied cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #809353. rmdy: submit required technical report.

    Oct 15, 2018

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 809350. required: submit required technical report

    Oct 15, 2018

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 809351. required: submit required technical report

    Oct 15, 2018

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 809356. required: submit required technical report

    Oct 15, 2018

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner,provide requiredcorridor width per bc1016.2-27-369/noted:at rear em exit,janitorial supplies/equipment blocking egress in a proper manner excessive storage.

    May 2, 2017

    Resolve
  • Class - 2

    Exit door not self closing.noted:at rm1,rm2,rm3,fps(doors)not self closing.rem:comply with code.

    May 2, 2017

    Resolve
  • Class - 2

    Removal of sidewalk shed or other types of safet measures w/o depart ments approval. as noted: at time of inspection,building facade was still designated as unsafe and safety measures where removed w/o dob

    Mar 8, 2017

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operation.note observed material hoist erected @ roof level.as per project manager that material hoist was in use yesterday.around 3pm yester

    Oct 7, 2015

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. provide required corridor width bc 1016.2; 27-369. obstruction noted: at 1st floor entrance of brooklyn kindergarten society have chairs with tables & bulletin

    Feb 11, 2015

    Resolve
  • Class - 2

    Sidewalk shed information panel not provided.note:sidewalk shed have been erected @ exp #1,2,3 under permit #320989466-01-eq-sh.respondent failed to provide an information panel as required by code specificatio

    Apr 30, 2014 · Penalty $400

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specification.sws parapet wall.note:sidewalk shed have been erected @ exp 1,2,3 under permit #320989766-01-eq-sh.@ many places of sws are missing parapet well that does not meet

    Apr 30, 2014 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancew/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations.

    Aug 31, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancew/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations.

    Aug 19, 2010

    Resolve
  • Class - 2

    Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.rem:file an amended report following remedial repairs of t

    Jul 16, 2010

    Resolve
  • Class - 2

    Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.rem:file an amended report following remedial repairs of t

    Jul 16, 2010

    Resolve
  • Class - 2

    Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.rem:file an amended report following remedial repairs of t

    Jul 16, 2010

    Resolve
  • Class - 2

    Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.rem:file an amended report following remedial repairs of t

    Jul 16, 2010

    Resolve
  • Class - 2

    Fail to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.rem:file an amended report following remedial repairs of t

    Jul 16, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept. of bldg rule & regula

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept. of bldg rule & regula

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept. of bldg rule & regula

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept. of bldg rule & regula

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept. of bldg rule & regula

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept. of bldg rule & regula

    Jan 7, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept. of bldg rule & regula

    Jan 7, 2010

    Resolve

Complaints

  • Heating

    Heat related

    Dec 14, 2010 · Apt 2C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1951
Floors
7
Residential units
1,099
Building area
924,915 ft²
Lot area
504,500 ft²
Zoning
R6
Community board
303
Council district
36
Block / lot
1580 / 1
Assessed value
$29,257,650
Landmark / historic district
No

Questions about 47 Marcous Garvey Blvd

Who owns 47 Marcous Garvey Blvd?

The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.

Does 47 Marcous Garvey Blvd have violations?

Yes. NYC HPD has recorded 8 housing violations at this property.

Is 47 Marcous Garvey Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 47 Marcous Garvey Blvd built?

City records list 1951 as the year it was built.

How many apartments are in 47 Marcous Garvey Blvd?

It has 1,099 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.