294 Ellery Street
Brooklyn, NY 11206BBL 3-01579-0010Map
Owner of record: Myrtle 6 LLC
294 Ellery Street is a vacant lot in Brooklyn, 11206. The owner of record is Myrtle 6 LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 2
- ECB violations
- 33
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 2
- Construction other optional
Borough commissioner has ordered all work stopped underapplication #b00905008-s1 on january 16, 2026. notice of intent torevoke all permits and applications
Jan 21, 2026
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped underapplication #b00905008-s1 on january 16, 2026. notice of intent torevoke all permits and applications
Jan 21, 2026
Dob violation - dismissed
ECB violations · 33
- Class - 1
At the time of my inspection of the 9-story new building, i observed active construction, supported pipe scaffolding erecting at all exposures, including the courtyard. upon review of the approved scaffold plan
Oct 8, 2026 · Penalty $2,500
Active - Class - 2
Bc3303.3 watchperson 9 story new building, building approximately 9931 square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to alert watchpe
Sep 12, 2026 · Penalty $2,500
Active - Class - 2
Bc3314.1 observed supported scaffold installed all exposures not maintain as per code. scaffold not fully planked, planks loose not tied down / secured. debris netting loose/missing not securely fastened to fac
Sep 12, 2026 · Penalty $2,500
Active - Class - 2
Work does not conform to approved construction documents and/or amendments:-as noticed at the time of inspection of a proposed 9 story new building actively placing concrete on the 9th floor slab, 8-9 floor sw
Sep 10, 2026 · Penalty $1,250
Active - Class - 2
Failure to provide special inspection of concrete placement tr1. as noted at the time of inspection of a proposed 9 story new building actively placing concrete on 9th floor slab, 8-9 floor shear walls and colu
Sep 10, 2026 · Penalty $1,250
Active - Class - 1
Bc-3305.3.6.1.2. failure to secure reshoring post in proximity to unenclosed perimeters:-as noted at the time of inspection of a proposed 9 story new building actively placing concrete on 9th floor slab 9 floor
Sep 10, 2026 · Penalty $2,500
Active - Class - 2
Failure to maintain adequate housekeeping per section requirements. asnoted at the time of inspection, of a proposed 9 story new building, actively placing concrete on the 9th floor. i observed 9 story new buil
Sep 10, 2026 · Penalty $1,250
Active - Class - 2
Bc 3307.2.1 at time of inspection observed: contractor pouring concrete at 5th fl. deck level at 8:25 am approx. contrary to dot permit# b64 stipulation 072 and permit# b68 stipulation 072 as well, creating uns
Aug 24, 2026 · Penalty $2,500
Active - Class - 2
At time of inspection observed: unsafe material delivery. scaffold equipment been unload from truck and storage on top of sidewalk shed, creating unsafe conditions for public and property, using scaffold contra
Aug 19, 2026 · Penalty $5,000
Active - Class - 2
Bc 3307.2.1 at time of inspection observed: contractor preparing to receive material delivery operations using knuckle boom at expo#3 fully blocking sidewalk upon request for dot permit, none was provided creat
Aug 13, 2026 · Penalty $2,500
Resolve
Show 23 more ↓
- Class - 2
At time of inspection observed: sidewalk shed/overhead protection at exposure 1 no mirrors at locations where pedestrians view is obstructed by columns at sidewalk area contrary to bc 3307.2.6 numeral 3 vehicle
Aug 13, 2026 · Penalty $2,500
Resolve - Class - 2
Bc 3307.2.1 at time of inspection observed: material delivery operations using knuckle boom at expo#1 contrary to dot stipulations permit# b69 using more than 8' of roadway. concrete operations at expo# 3 fully
Jul 30, 2026 · Penalty $2,500
Resolve - Class - 2
Backflow prevention. at the time of inspection, i observed fire hydrant being used, hose connected going to construction site without a backflow preventer valve contrary to bc 15 rcny 20-04. failure to provide
Jul 30, 2026 · Penalty $1,250
Active - Class - 2
At time of inspection observed: concrete operations at expo# 3 contractor failure to perform proper concrete washout water procedures at exposure# 1. concrete waste scattered on roadway, creating an unsafe and
Jul 30, 2026 · Penalty $2,500
Active - Class - 1
At time of inspection observed: material delivery operations using knuckle boom at expo#1 and concrete operations at expo# 3 inadequate stage work zone, plastic barriers system contrary to manufacturer specific
Jul 30, 2026 · Penalty $2,500
Resolve - Class - 1
At time of inspection observed: contractor failure to institute safety measures inadequate/missing content on pre-shift safety meeting, no mention about specific/ general work task hazardous and prevention on s
Jul 9, 2026 · Penalty $5,000
Resolve - Class - 1
At time of inspection observed: pedestrian walkway not maintained/inadequate 3 inches crack and uneven surface sidewalk at exposure# 1 contrary to bc 3303.4.1.1 creating potential tripped hazardous conditions f
Jul 9, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection observed: proposed 9 story nb. at exposure# 1 inadequate storage zone, plastic barriers system contrary to manufacturer specifications, missing interlocking couplers, not water filled, co
Jul 9, 2026 · Penalty $1,250
Active - Class - 1
Work after hours without a variance permit contrary to 28-105.12.5. asnoted: at time of inspection observed 4 workers doing stripping and concrete operations on a sunday without a after hours variance permit. s
May 17, 2026 · Penalty $2,500
Resolve - Class - 2
Note: at time of inspection of an active site with ongoing excavation operations, i observed a construction office trailer in place on the roadway, upon reviewing on site plans it was noted that the trailer was
May 13, 2026
Resolve - Class - 2
Note: at time of inspection of a active construction site with on going excavation work, i observed a construction office trailer parked in front of the adjacent building (869 park avenue) contrary to permit wi
May 13, 2026 · Penalty $2,500
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. at the time of inspection of a proposed (9)story, (30) dwelling unit building, the job site lacked required construction fencing at exposure
Feb 16, 2026 · Penalty $1,000
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. at thetime of inspection of a proposed (9)story (30)dwelling unit building, active construction was observed with workers drilling and installing
Feb 16, 2026 · Penalty $10,000
Resolve - Class - 1
Failure to safegaurd public and properly. at time of inspection observed premises under active demolition observed permit where at exp #4 debris(bricks, stones etc.) rolling onto adjacent property front yard. r
Jan 19, 2026 · Penalty $5,000
Resolve - Class - 2
At the time of inspection i observed plastic pedestrian vehicular traffic barricades in use at exposure 1 contrary to manufacturers specifications, missing interlocking devices and not filled with either water
Jan 13, 2026 · Penalty $2,500
Resolve - Class - 2
At time of inspection, observed two inoperative sws light fixtures creating insufficient illumination at pedestrian walkway. failure to maintain safety lighting poses tripping and visibility hazards to public.
Dec 30, 2025 · Penalty $2,400
Resolve - Class - 1
At time of inspection, observed construction superintendent failing to perform duties. super is not onsite, and superintendent's logbook presented not up to date. ecb issued for failure to perform duties as per
Dec 9, 2025
Resolve - Class - 2
At time of inspection, observed construction superintendent failing to perform duties. super is not onsite, and superintendent's logbook presented not up to date. ecb issued for failure to perform duties as per
Dec 9, 2025 · Penalty $5,000
Active - Class - 1
At time of inspection, observed sidewalk shed not conforming to plans. plans detail on exposure 1 (section a) a sidewalk shed with no raised overhead protection to a lot for a driveway space. ecb issued as side
Dec 9, 2025 · Penalty $2,500
Resolve - Class - 1
At time of inspection, approved demolition drawings not provided during walk through. no approved plans for site safety full demolition maintained on site. ecb issued for failure to provide copies of constructi
Dec 9, 2025 · Penalty $5,000
Resolve - Class - 2
Bc 3306.9.8.3: at the time of my inspection of a two-story building undergoing full demolition, i observed glass remaining in multiple window and door , creating a hazard to workers and the public. stop all dem
Nov 14, 2025 · Penalty $2,500
Resolve - Class - 2
Bc 3309.17: during my inspection of a two-story building undergoing full demolition, i observed at exp# 4that adjacent property windows and doors at exp#4 and the rear lacked required protection, creating a haz
Nov 14, 2025 · Penalty $2,500
Resolve - Class - 2
At the time of inspection, inactive jobsite, i observed sidewalk shed installed at exposure 1 with no parapet information panel posted / affixed to the shed as per bc 3301.9.2.2 sidewalk shed parapet informatio
Sep 18, 2025 · Penalty $1,250
Resolve
Complaints
- Nonconst
Vermin
Jul 1, 2013 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Vacant lot (V1)
- Year built
- —
- Floors
- —
- Residential units
- —
- Building area
- —
- Lot area
- 10,000 ft²
- Zoning
- C4-4L
- Community board
- 303
- Council district
- 36
- Block / lot
- 1579 / 10
- Assessed value
- $964,125
- Landmark / historic district
- No
Questions about 294 Ellery Street
Who owns 294 Ellery Street?
The owner of record in NYC Department of City Planning PLUTO data is Myrtle 6 LLC.
Does 294 Ellery Street have violations?
NYC HPD has no housing violations on record for this property.
Is 294 Ellery Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.