800 Broadway is an office building built in 1920 in Brooklyn, 11206. The owner of record is Cfs 800 LLC. HPD has recorded 1 housing violation here, most recently on October 16, 2019.
- HPD violations
- 1
- DOB violations
- 4
- ECB violations
- 14
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Oct 16, 2019
Closed — Violation closed
DOB building violations · 4
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 31, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed
ECB violations · 14
- Class - 2
Failure to safeguard public and property no overhead protecttion at time of inspection of a 5 story alt currently with steel erected at 5th floor level i observed no overhead protetcion in place at adjacent pro
Jun 3, 2020
Resolve - Class - 1
Missing/inadequate guardrail system.at time of my inspection of a 3 story building active jobsite,i observed at 3 floor level inadequate cable system missing zero cable and not fully netted opened areas with mi
Mar 4, 2020
Resolve - Class - 1
Failure to safeguard public and property.at time of inspection of a 5 story alt1 i observed 1st story commercial space occupied by business at exp#1 and steel for new floors being erected directly above the occ
Jan 23, 2020
Resolve - Class - 2
Failure to safeguard public and property-no overhead protection.at time of inspection of a 5 story alt1 i observed new steel being erected throughout building currently at new 3rd floor working deck and no over
Jan 23, 2020
Resolve - Class - 1
Bc330310-no occupant protection plan.at time of inspeciton of a 5 story alt1 i observed 1st story commercial space occupied by business at exp#1 upon request for occupant protection plan none was provided or av
Jan 23, 2020 · Penalty $625
Resolve - Class - 1
No design drawing for temporary platform.at tie of inspeciton of a 5 story alt1 i observed makeshift platform with equipment on top at 2nd floor level exp#4 upon request for design drawing to confirm proper ins
Jan 23, 2020
Resolve - Class - 1
Bc330721-obstruction of streets,including sidewalks,walkways of the deparment of transportion(dot)shall apply with regard to the closing of streets or sidewalks,or the obstruction of any port there of.noted at
Sep 12, 2019 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved design drawings plans. at time of myinspection of 5 sty alteration in active jobsite,beams moved from the 1st fk & the basement & wasnt replace w/.c joist as was specify on the
Apr 24, 2019 · Penalty $1,250
Resolve - Class - 2
Bc3306.5.1 deficient drawings-the respondent, design appplicant failedto meet the requirements of bc3306.5.1 for drawings filed under job #321548991. bc3306.5.1 requires the drawings to contain plans, sections
Nov 8, 2018
Resolve - Class - 2
Bc3306.5.1.deficient drawings.the respondent design applicant failed to meet the requirements of bc3306.5.1.for drawings filed under job #321420324.bc3306.5.1.requires the drawings to be signed and sealed.drawi
Jul 12, 2018
Resolve
Show 4 more ↓
- Class - 1
Sec. 3306.7 failure to property shore & brace a weakened structure prior to full or partial demolition. at the time of inspection it was observed an active site w/o properly shored flooring syste, at exp#2 wher
Feb 21, 2018
Resolve - Class - 1
Work does not conform to approved construction documents &/or amendments. at the time of inspection it was observed that on an active site plans did not conform to field conditions meaning plans x-102.00 are
Feb 21, 2018 · Penalty $250
Resolve - Non-hazardous
Failure to have certificate of occupancy posted or available for insp ection at time of inspection remedy:have c of o availible for inspection at all reasonable time
Jul 12, 2004
Resolve - Non-hazardous
Work without a permit. work noted having installed a/c unit at 1st story rear from ceiling mounted. remedy: obtain a permit or discontinue use.
Jan 26, 1996 · Penalty $350
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Oct 13, 2019 · Apt OUTSID
Close - Heating
Heat related
Feb 23, 2013 · Apt 8REAR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 1920
- Floors
- 5
- Residential units
- —
- Building area
- 30,137 ft²
- Lot area
- 5,736 ft²
- Zoning
- C4-4L
- Community board
- 303
- Council district
- 36
- Block / lot
- 1578 / 19
- Assessed value
- $3,220,650
- Landmark / historic district
- No
Questions about 800 Broadway
Who owns 800 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Cfs 800 LLC.
Does 800 Broadway have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 800 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 800 Broadway built?
City records list 1920 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.