roofy

35 Marconi Place

Brooklyn, NY 11233BBL 3-01566-0001Map

Owner of record: Zhu & Lin LLC

35 Marconi Place is a mixed residential and retail building built in 1924 in Brooklyn, 11233. It has 3 residential units across 3 floors. The owner of record is Zhu & Lin LLC. HPD has recorded 52 housing violations here, most recently on April 11, 2024.

HPD violations
52
DOB violations
4
ECB violations
0
HPD complaints
39

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 11, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 52

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 11, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 23, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 1, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2021

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Mar 20, 2021

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Dec 5, 2016

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 5, 2016

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story

    Dec 5, 2016

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Dec 5, 2016

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 5, 2016

    Closed — Violation closed
Show 40 more ↓
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing from wall at public hall, 1st story

    Dec 5, 2016

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. located at apt 1fl, 1st story, 1st apartment from north at east

    Dec 5, 2016 · Apt 1FL

    Closed — Violation closed
  • C

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east

    Dec 5, 2016 · Apt 1FL

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 10, 2016

    Closed — Violation dismissed
  • C

    Properly secure the loose vinyl siding at parapet, south exterior wall , 3rd story

    Jul 20, 2016

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 3, 3rd story, 1st apartment from north at east

    May 25, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective connection waste line at sink in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    May 25, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east

    May 25, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east

    May 25, 2016 · Apt 3

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    May 25, 2016

    Closed — Violation closed
  • B

    Replace with new the missing wood baluster (2 total) at public hall stairs, 2nd story

    May 25, 2016

    Closed — Violation closed
  • C

    Remove all obstructions from water closet ... in the bathroom located at apt 3, 3rd story, 1st apartment from north at east

    May 25, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1fl, 1st story, apartment at east

    Feb 25, 2016 · Apt 1FL

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1fl, 1st story, apartment at east

    Feb 25, 2016 · Apt 1FL

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1fl, 1st story, apartment at east

    Feb 25, 2016 · Apt 1FL

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak above the ceiling in the kitchen located at apt 1fl, 1st story, apartment at east

    Feb 25, 2016 · Apt 1FL

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 4; in the entire apartment located at apt 1fl, 1st story, apartment at east

    Feb 25, 2016 · Apt 1FL

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • A

    Properly repair the broken or defective electrical outlet at north wall in the 4th room from east at south located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • A

    Properly repair the broken or defective electrical outlet at south wall in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • A

    Properly repair the broken or defective lower window sash,improperly balanced in the 4th room from east at south located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • A

    Properly repair the broken or defective lower window sash,improperly balanced in the 4th room from east at north located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • A

    Properly repair the broken or defective electrical outlet at east wall in the foyer located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , north wall, west wall in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , west wall in the 3rd room from east located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , south wall, ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Feb 23, 2016 · Apt 3

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 13, 2015

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at south, the 3rd room from east, the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Sep 27, 2015 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 3, 3rd story, 1st apartment from north at east

    Sep 27, 2015 · Apt 3

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective located at apt 3, 3rd story, 1st apartment from north at east

    Sep 27, 2015 · Apt 3

    Closed — Violation closed
  • C

    Replace with new the broken or defective east 1 inside lower glass pane window in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Sep 27, 2015 · Apt 3

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 23, 2015

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 1fl, 1st story

    Apr 3, 2014 · Apt 1FL

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1fl, 1st story

    Apr 3, 2014 · Apt 1FL

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1fl, 1st story

    Apr 3, 2014 · Apt 1FL

    Closed — Violation closed

DOB building violations · 4

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Nov 5, 2020 · Apt BLDG

    Close
  • Electric

    Outlet/switch

    Dec 3, 2016 · Apt 1FL

    Close
  • Electric

    Power outage

    Dec 3, 2016 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Dec 3, 2016 · Apt 1FL

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2016 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    May 31, 2016 · Apt 3

    Close
  • Plumbing

    Basin/sink

    May 31, 2016 · Apt 3

    Close
  • Water leak

    Heavy flow

    May 31, 2016 · Apt 3

    Close
  • Unsanitary condition

    Mold

    May 31, 2016 · Apt 3

    Close
  • Unsanitary condition

    Pests

    May 31, 2016 · Apt 3

    Close
Show 29 more ↓
  • Paint/plaster

    Wall

    May 31, 2016 · Apt 3

    Close
  • Paint/plaster

    Wall

    May 31, 2016 · Apt 3

    Close
  • Paint/plaster

    Wall

    May 31, 2016 · Apt 3

    Close
  • General

    Cabinet

    May 31, 2016 · Apt 3

    Close
  • Water leak

    Heavy flow

    May 31, 2016 · Apt 3

    Close
  • Plumbing

    Toilet

    May 24, 2016 · Apt 3

    Close
  • Paint/plaster

    Door/frame

    May 24, 2016 · Apt 3

    Close
  • Paint/plaster

    Cabinet

    May 24, 2016 · Apt 3

    Close
  • Plumbing

    Basin/sink

    May 24, 2016 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2016 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Feb 20, 2016 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Feb 19, 2016 · Apt 3

    Close
  • Plumbing

    Water supply

    Feb 19, 2016 · Apt 3

    Close
  • Plumbing

    Water supply

    Feb 19, 2016 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Feb 19, 2016 · Apt 3

    Close
  • Paint/plaster

    Wall

    Feb 19, 2016 · Apt 3

    Close
  • Electric

    Outlet/switch

    Feb 19, 2016 · Apt 3

    Close
  • Electric

    Outlet/switch

    Feb 19, 2016 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Feb 19, 2016 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2016 · Apt 3

    Close
  • Electric

    Power outage

    Sep 24, 2015 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Apr 2, 2014 · Apt 1FL

    Close
  • Unsanitary condition

    Mold

    Apr 2, 2014 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Apr 2, 2014 · Apt 1FL

    Close
  • Water leak

    Damp spot

    Apr 2, 2014 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Apr 2, 2014 · Apt 1FL

    Close
  • Appliance

    Electric/gas range

    Nov 25, 2009 · Apt 3FL

    Close
  • Nonconst

    Vermin

    Sep 2, 2003 · Apt 2FL

    Close
  • Heating

    Heat related

    Sep 2, 2003 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S3)
Year built
1924
Floors
3
Residential units
3
Building area
3,976 ft²
Lot area
1,480 ft²
Zoning
R5
Community board
316
Council district
41
Block / lot
1566 / 1
Assessed value
$441,000
Landmark / historic district
No

HPD registration #348682, last renewed Jul 8, 2026.

Questions about 35 Marconi Place

Who owns 35 Marconi Place?

The owner of record in NYC Department of City Planning PLUTO data is Zhu & Lin LLC.

Does 35 Marconi Place have violations?

Yes. NYC HPD has recorded 52 housing violations at this property.

Is 35 Marconi Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 35 Marconi Place built?

City records list 1924 as the year it was built.

How many apartments are in 35 Marconi Place?

It has 3 residential units and 4 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.