23 Mother Gaston Blvd
Brooklyn, NY 11207BBL 3-01529-0001Map
Owner of record: NYC Housing Authority
23 Mother Gaston Blvd is an elevator apartment building built in 1966 in Brooklyn, 11207. It has 160 residential units across 14 floors. The owner of record is NYC Housing Authority. HPD has recorded 32 housing violations here, most recently on October 14, 2026. 4 of the 32 most recent violations are still open.
- HPD violations
- 32
- DOB violations
- 19
- ECB violations
- 26
- HPD complaints
- 40
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 32
- CImmediately hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 4b, 4th story, 1st apartment from east at south
Oct 14, 2026 · Apt 4B
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective silicone caulking around the bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from east at south
Oct 14, 2026 · Apt 4B
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from east at south
Oct 14, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 4a, 4th story, 1st apartment from west at north
Oct 8, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch, to public stairs, 2nd stairway from north at public hall, 4th story
May 7, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch, at hopper door at public hall, 4th story
May 7, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
May 3, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from east at south
May 3, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door #b leading to fire stair at public hall, 4th story
Apr 30, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door #a at public hall, 4th story
Apr 30, 2026
Closed — Violation closed
DOB building violations · 19
- Construction other optional
Failure to maintain bldg in code compliant manner. roof:damaged,cracke mortar joints & sealant joints on bulkhead. exps 1,2,3&4:spalling concrete @ 14fl.#1 w ele, damaged mortar joints beneath window sills exp3 loose matel caping/flashing @ roof deck. remedy: repair and or replace damaged facade
Jun 3, 2025
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner.exps 1,2,3,4: spalled/spalling, cracked roof deck overhang. on all four elevation ro of spalled/spalling bricks on bulkheadd/water town brick esposure remedy: repair and/on replace all damaged concrete roof over hang
Jun 3, 2025
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Oct 10, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jun 19, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Apr 17, 2019
Dob violation - active
ECB violations · 26
- Class - 2
Failure to maintain building exterior walls facade & appurtenances.observed spalled stone in multiple locations at roof level on exp #2 & #3.remedy:maintain building exterior walls facade & appurtenances & take
Dec 22, 2022 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documeting condition of exterior wall & appurtenances required by 28-302.4 for control #909345.remedy:submit acceptable required tec
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documeting condition of exterior wall & appurtenances required by 28-302.4 for control #909349.remedy:submit acceptable required tec
Dec 2, 2022 · Penalty $1,250
Active - Class - 1
Failure to provide sidewalk shed where required to protect residents & public from defective facade.noted:observed at exp #1 west elevation defective masonry conditions on roof deck masonry spalling roofdeck ma
Jun 14, 2022 · Penalty $10,000
Resolve - Class - 1
Failure to take required measures to protect public from documented unsafe facade. as noted on 6/19/19 a fisp 3 unsafe notification was submitted to the dob and as of 8/5/19 safety measures provided are not ade
Aug 5, 2019
Resolve - Class - 2
Failure to maintain exterior building walls and appurtenances. note: iobserved loose metal flashin gon roof overhand slab on exp#3 east elevation. exp 4 south elevation i observed spalling, cracked roof concret
Dec 27, 2018
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control #809349.rem:submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control #809345.rem:submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Jan 7, 2010
Resolve - Class - 2
Failure to file an amended fifth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following repairs of th
Oct 23, 2009
Resolve
Complaints
- Plumbing
Water supply
Oct 30, 2026 · Apt 4B
Open - Heat/hot water
Apartment only
Oct 14, 2026 · Apt 4B
Close - Water leak
Slow leak
Oct 11, 2026 · Apt 6D
Open - Plumbing
Water supply
Oct 9, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 7, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Oct 6, 2026 · Apt 4A
Close - Water leak
Heavy flow
Oct 4, 2026 · Apt 14E
Open - Plumbing
Water supply
Oct 1, 2026 · Apt 3B
Close - Plumbing
Water supply
Aug 20, 2026 · Apt 4B
Close - Heat/hot water
Entire building
May 23, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1966
- Floors
- 14
- Residential units
- 160
- Building area
- 149,772 ft²
- Lot area
- 79,000 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 37
- Block / lot
- 1529 / 1
- Assessed value
- $8,242,200
- Landmark / historic district
- No
HPD registration #390532, last renewed Sep 24, 2026.
Questions about 23 Mother Gaston Blvd
Who owns 23 Mother Gaston Blvd?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 23 Mother Gaston Blvd have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 23 Mother Gaston Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 23 Mother Gaston Blvd built?
City records list 1966 as the year it was built.
How many apartments are in 23 Mother Gaston Blvd?
It has 160 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.