849 Quincy Street
Brooklyn, NY 11221BBL 3-01478-0012Map
Owner of record: Mohammad A Bari
849 Quincy Street is a mixed residential and retail building built in 1920 in Brooklyn, 11221. It has 4 residential units across 4 floors. The owner of record is Mohammad A Bari. HPD has recorded 37 housing violations here, most recently on May 5, 2026. 28 of the 37 most recent violations are still open.
- HPD violations
- 37
- DOB violations
- 4
- ECB violations
- 5
- HPD complaints
- 43
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 22, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of rodents rats at building front
Aug 22, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Aug 1, 2024 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Remove the illegal fastening double cylinder key operated lock at building entrance door
Aug 1, 2024
Open — Nov sent out - BHazardous
Remove the illegal fastening double cylinder key operated lock at gate at building front
Aug 1, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 2nd room from north located at bsmt-apt 1, 1st bsmt-apt from south at west
Apr 18, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at bsmt-apt 1, 1st bsmt-apt from south at west
Apr 18, 2024 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt 1, 1st bsmt-apt from south at west
Apr 18, 2024 · Apt 1
Open — Notice of issuance sent to tenant
Show 27 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 9, 2022
Open — Invalid certification - BHazardous
Properly repair the broken or defective mortise lock vestibule door at public hall, 1st story
Mar 9, 2022
Open — Invalid certification - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Mar 9, 2022
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 1, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls ceiling and trims in the entire apartment located at apt 4thfl, 3rd story, 1st apartment from south at west
Jun 18, 2021 · Apt 4THFL
Open — False certification - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approxmately 1 sq.ft at ceiling in the 1st room from north at west located at apt 4thfl, 3rd story, 1st apartment from south at west
Jun 18, 2021 · Apt 4THFL
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel ''by way of reglazing'' the bath tub in the bathroom located at apt 4thfl, 3rd story, 1st apartment from south at west
Jun 18, 2021 · Apt 4THFL
Open — False certification - BHazardous
Remove the illegal fastening padlockable hasp at scuttle cover at public hall, 3rd story
Jun 18, 2021
Open — False certification - BHazardous
Properly secure the loose scuttle ladder at public hall, 3rd story
Jun 18, 2021
Open — False certification - BHazardous
Trace and repair the source and abate the visible mold condition... approxmately 1 sq.ft at ceiling in the 1st room from north at west located at apt 4thfl, 3rd story, 1st apartment from south at west original violation 14400944 issued 18-jun-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 18, 2021 · Apt 4THFL
Open — Defect letter issued - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner in the entire apartment located at apt 2, 2nd story
Aug 22, 2019 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at bsmt-apt bsmnt
Jan 28, 2013 · Apt BSMNT
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at bsmt-apt bsmnt
Jan 28, 2013 · Apt BSMNT
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jan 28, 2013
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of gas to the fixtures stove in the entire apartment located at bsmt-apt bsmnt
Jan 28, 2013 · Apt BSMNT
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening lockable slide bolt at window for secondary means of egress in the entire apartment located at apt bsmnt
Jan 28, 2013 · Apt BSMNT
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department -- ceiling in the bathroom located at bsmt-apt 1
Jan 18, 2013 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at bsmt-apt 1
Jan 18, 2013 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at bsmt-apt 1
Jan 18, 2013 · Apt 1
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening - double cylinder key operated lock installed on door vestibule basement public hall
Jan 18, 2013
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system -- on wall bsmt at public hall
Jan 18, 2013
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at basement
Jan 18, 2013
Open — Nov sent out
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed
ECB violations · 5
- Class - 2
B254,4a,19b,15,50a,50b,50c,50d: 50a;valve on expansion tank missing. 50b;flue pipe reduce. 50c;fresh air intake under size. 50d;no fuserablelink line damper on fresh air intake. 50e;no clean out on chimney base
Jul 14, 2012 · Penalty $530
Resolve - Class - 2
B254,4a,19b,15,50a,50b,50c,50d: 50a;valve on expansion tank missing. 50b;hallway is being heated by (tennant)boiler. 50c;fresh air intake undersize. 50d;no (jusable)link fire damper on fresh air intake.
Jul 14, 2012 · Penalty $530
Resolve - Class - 2
B254,4a,19b,32a,15,50a: 50a;valve on expansion tank missing.
Jul 14, 2012 · Penalty $530
Resolve - Class - 3
B354,32a,50a,50b: 50a;hallway is being heated by (temwan)boiler. 50b;no valve on expansion tank.
Jul 14, 2012 · Penalty $230
Resolve - Class - 3
Work w/o permit.illegal work noted:at front of property an approx 7'solid block wall 8'high constructed & approx 12"*16" red bricks column w/8' * 8" wooden beam at top & 9'high roll up shutter created & approx
Jan 29, 2010 · Penalty $100
Resolve
Complaints
- Unsanitary condition
Pests
Jul 30, 2024 · Apt 1
Close - Paint/plaster
Wall
Jul 30, 2024 · Apt 1
Close - Flooring/stairs
Floor
Jul 30, 2024 · Apt 1
Close - Unsanitary condition
Pests
Apr 14, 2024 · Apt 1
Close - Plumbing
Bathtub/shower
Apr 14, 2024 · Apt 1
Close - Flooring/stairs
Floor
Apr 14, 2024 · Apt 1
Close - Unsanitary condition
Pests
Apr 14, 2024 · Apt 1
Close - Flooring/stairs
Floor
Apr 14, 2024 · Apt 1
Close - Plumbing
Bathtub/shower
Apr 14, 2024 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Apr 14, 2024 · Apt 1
Close
Show 33 more ↓
- Unsanitary condition
Pests
Apr 14, 2024 · Apt 1
Close - Unsanitary condition
Pests
Apr 14, 2024 · Apt 1
Close - Unsanitary condition
Pests
Apr 14, 2024 · Apt 1
Close - Flooring/stairs
Floor
Apr 14, 2024 · Apt 1
Close - Flooring/stairs
Floor
Apr 14, 2024 · Apt 1
Close - Safety
Carbon monoxide detector
Jun 12, 2021 · Apt 4THFL
Close - Safety
Smoke detector
Jun 12, 2021 · Apt 4THFL
Close - Unsanitary condition
Mold
Jun 12, 2021 · Apt 4THFL
Close - Safety
Carbon monoxide detector
Apr 1, 2021 · Apt 4
Close - Safety
Smoke detector
Apr 1, 2021 · Apt 4
Close - Paint/plaster
Ceiling
Jan 14, 2017 · Apt 2
Close - Paint/plaster
Wall
Jan 14, 2017 · Apt 2
Close - Plumbing
Basin/sink
Jan 14, 2017 · Apt 2
Close - Heating
Heat related
Feb 15, 2014 · Apt 2
Close - Heating
Heat related
Jan 26, 2013 · Apt BASEM
Close - Heating
Heat related
Jan 24, 2013 · Apt BSMNT
Close - Heating
Heat related
Jan 17, 2013 · Apt 1FL
Close - Plumbing
Water-leaks
Jan 15, 2013 · Apt 1
Close - Plumbing
Water-leaks
Jan 15, 2013 · Apt 1
Close - Heating
Heat related
Jan 15, 2013 · Apt 1
Close - Heating
Heat related
Jan 11, 2013 · Apt GRND
Close - Electric
Lighting
Jan 9, 2013 · Apt 1
Close - Plumbing
Water-leaks
Jan 9, 2013 · Apt 1
Close - Heating
Heat related
Jan 9, 2013 · Apt 1
Close - General
Cooking gas
Jan 9, 2013 · Apt 1
Close - Heating
Heat related
Dec 23, 2012 · Apt 3
Close - Heating
Heat related
Nov 6, 2012 · Apt BSMT
Close - Electric
Wiring
Jul 12, 2012 · Apt 1
Close - Appliance
Refrigerator
Sep 15, 2011 · Apt 2
Close - Plumbing
Toilet
Sep 15, 2011 · Apt 2
Close - Paint/plaster
Wall
Mar 19, 2003 · Apt 2
Close - Appliance
Refrigerator
Mar 19, 2003 · Apt 2
Close - Nonconst
Vermin
Mar 19, 2003 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1920
- Floors
- 4
- Residential units
- 4
- Building area
- 3,440 ft²
- Lot area
- 1,186 ft²
- Zoning
- C4-4L
- Community board
- 303
- Council district
- 41
- Block / lot
- 1478 / 12
- Assessed value
- $499,950
- Landmark / historic district
- No
HPD registration #349006, last renewed Sep 30, 2025.
Questions about 849 Quincy Street
Who owns 849 Quincy Street?
The owner of record in NYC Department of City Planning PLUTO data is Mohammad A Bari.
Does 849 Quincy Street have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 849 Quincy Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 849 Quincy Street built?
City records list 1920 as the year it was built.
How many apartments are in 849 Quincy Street?
It has 4 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.