Violations at 1776 Park Place
Brooklyn, NY 11233 · BBL 3-01463-0041 · Back to the property
HPD housing violations
The newest 50 of 95 HPD violations. The city keeps the complete history.
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5m, 5th story, 1st apartment from west at north
Oct 15, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5m, 5th story, 1st apartment from west at north
Oct 15, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective caulking around water closet bowl in the bathroom located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - ANon-hazardous
Cleanse to the satisfaction of this department the grout and ceramic wall tiles around bathtub in the bathroom located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the 3rd room from north located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective electrical outlet at east side of center island in the kitchen located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the 1st room from north located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood base cabinet drawers at north and south in the kitchen located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective rubber gasket at refrigerator in the kitchen located at apt 3j, 3rd story, 3rd apartment from north at east
Sep 11, 2026 · Apt 3J
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story, section at south
Aug 19, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story, section at south
Aug 19, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story, section at south
Aug 19, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 5th story, section at south
Aug 19, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story, section at south
Aug 19, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story, section at south
Aug 19, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 7th apartment from west at north
Jun 1, 2026 · Apt 1G
Open — False certification - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 1g, 1st story, 7th apartment from west at north
Jun 1, 2026 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from east at north located at apt 1g, 1st story, 7th apartment from west at north
Jun 1, 2026 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 7th apartment from west at north
Jun 1, 2026 · Apt 1G
Open — False certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6d, 6th story, 1st apartment from west at north
Mar 20, 2026 · Apt 6D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective outlet at north and south wall in the 1st room from east at south located at apt 6d, 6th story, 1st apartment from west at north
Mar 20, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north
Mar 20, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north
Mar 20, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north
Mar 20, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north
Mar 20, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north
Feb 15, 2026 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4p, 4th story, 1st apartment from east at south
Feb 9, 2026 · Apt 4P
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2t, 2nd story, 5th apartment from east at south , section at west
Jan 21, 2026 · Apt 2T
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2t, 2nd story, 5th apartment from east at south , section at west
Jan 21, 2026 · Apt 2T
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective rubber gasket at bottom door in the kitchen located at apt 2t, 2nd story, 5th apartment from east at south , section at west
Jan 21, 2026 · Apt 2T
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3m, 3rd story, 1st apartment from south at west , section at east
Jan 21, 2026 · Apt 3M
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3m, 3rd story, 1st apartment from south at west , section at east
Jan 21, 2026 · Apt 3M
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 3m, 3rd story, 1st apartment from south at west , section at east
Jan 21, 2026 · Apt 3M
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 3j, 3rd story, 3rd apartment from north at east
Nov 5, 2025 · Apt 3J
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north located at apt 3j, 3rd story, 3rd apartment from north at east
Nov 5, 2025 · Apt 3J
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom system from vestibule to north wall panel in the private hallway located at apt 3j, 3rd story, 3rd apartment from west at north
Aug 30, 2025 · Apt 3J
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective outlet at east wall in the 1st room from east located at apt 3j, 3rd story, 3rd apartment from west at north
Aug 30, 2025 · Apt 3J
Closed — Violation dismissed - BHazardous
Properly secure the loose base cabinet at sink in the kitchen located at apt 3j, 3rd story, 3rd apartment from west at north
Aug 30, 2025 · Apt 3J
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Mar 26, 2025
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak around window recess in the 1st room from north at west located at apt 5f, 5th story, 6th apartment from west at north
Jan 27, 2025 · Apt 5F
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window recess in the 1st room from north at west located at apt 5f, 5th story, 6th apartment from west at north
Jan 27, 2025 · Apt 5F
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north located at apt 4n, 4th story, 2nd apartment from south at west
Aug 27, 2024 · Apt 4N
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline pipe at bathtub in the bathroom located at apt 4n, 4th story, 2nd apartment from south at west
Aug 27, 2024 · Apt 4N
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3j, 3rd story, 3rd apartment from north at east
Aug 23, 2024 · Apt 3J
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at east located at apt 3j, 3rd story, 3rd apartment from north at east
Aug 23, 2024 · Apt 3J
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at east located at apt 3j, 3rd story, 3rd apartment from north at east
Aug 23, 2024 · Apt 3J
Closed — Violation dismissed
DOB building violations
21 DOB violations, newest first.
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 8, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)
Jun 1, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years
Jun 1, 2015
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Sep 28, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Sep 28, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed
ECB violations
4 ECB violations, newest first.
- Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Aug 19, 2010
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Jan 7, 2010
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations rem
Dec 12, 2008
Resolve - Non-hazardous
05-l, 07-m, 17-i, 35-a, 35- replace missing motor room stairway en- closure railing.
Feb 15, 1991
Resolve